PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/07/25 EST. NO. 004 TIME 01:29 PM R.E. NAME: FAHAD MASUD 11-2N2044 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/07/25 EST. NO. 004 TIME 01:29 PM R.E. NAME: FAHAD MASUD 11-2N2044 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/07/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2044 TIME 01:29 PM ESTIMATE NO. 004 BID OPENING 10/03/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/25/25 R.E. NAME: FAHAD MASUD DATE OF THIS ESTIMATE 08/07/25 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 11-SD-8-2.9/11.7 ---------------------------------- 11-IMP-8-R36.4/R39.5 SB GENERAL ENGINEERING, INC. SAN DIEGO AND IMPERIAL COUNTIES IN SAN 12125 LAKESIDE AVENUE DIEGO FROM 0.5 MILE EAST OF ROUTE 163/8 LAKESIDE CA 92040 SEPARATION TO JACKSON DRIVE UNDERCROSSING IN LA MESA AND IN AND NEAR EL CENTRO FROM FED. AID NO. N O N E INSTALL RUMBLE STRIPS AND PAVEMENT MARKING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 500.0000 30,000.00 2.000 1,000.00 60.000 30,000 003 CONSTRUCTION AREA SIGNS LS 40,000.0000 40,000.00 0.200 8,000.00 1.000 40,000 004 TRAFFIC CONTROL SYSTEM LS 165,000.0000 165,000.00 1.000 165,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 200.0000 12,000.00 60.000 12,000 006 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,000.0000 8,000.00 4.000 8,000 007 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 008 WATER POLLUTION CONTROL PROGRAM LS 3,000.0000 3,000.00 0.250 750.00 1.000 3,000 009 MANAGE SOLID WASTE GENERATED BY THE HR 200.0000 9,600.00 48.000 9,600 PUBLIC 010 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,300.0000 48,100.00 3.490 4,537.00 49.490 64,337 011 PAVEMENT MARKER (RETROREFLECTIVE) EA 40.0000 2,400.00 47.000 1,880.00 122.000 4,880 012 6" THERMOPLASTIC TRAFFIC STRIPE LF 6.2500 17,500.00 2,306.000 14,412.50 5,806.000 36,287 (ENHANCED WET NIGHT VISIBILITY) 013 6" RUMBLE STRIP (ASPHALT CONCRETE STA 500.0000 15,000.00 57.800 28,900 PAVEMENT) 014 12" RUMBLE STRIP (ASPHALT CONCRETE STA 55.0000 107,800.00 1,440.700 79,238 PAVEMENT) 015 REMOVE TRAFFIC STRIPE LF 2.5000 7,000.00 5,867.000 14,667 PROGRAM CAS145 PAGE 2 DATE 08/07/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2044 TIME 01:29 PM ESTIMATE NO. 004 BID OPENING 10/03/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/25/25 R.E. NAME: FAHAD MASUD DATE OF THIS ESTIMATE 08/07/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 30,579.50 503,410.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 30,579.50 503,410.50 016 MOBILIZATION LS 50,000.0000 50,000.00 1.000 50,000 ORIGINAL CONTRACT AMOUNT 522,900.00 TOTAL WORK COMPLETED 30,579.50 553,410.50 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 30,579.50 553,410.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/22/24 60 12/23/24 12/23/24 07/25/25 29 94 0 0 100% 100% FAHAD MASUD RESIDENT ENGINEER