PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/26 EST. NO. 001 TIME 08:00 AM R.E. NAME: JOSE GUILLERMO SILLAS 11-2N2584 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/26 EST. NO. 001 TIME 08:00 AM R.E. NAME: JOSE GUILLERMO SILLAS 11-2N2584 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2584 TIME 08:00 AM ESTIMATE NO. 001 BID OPENING 05/05/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: JOSE GUILLERMO SILLAS DATE OF THIS ESTIMATE 10/21/26 LOCATION PROGRESS ESTIMATE 11-SD-78-80.0/95.3 ----------------- DOOLITTLE CONSTRUCTION, LLC SAN DIEGO COUNTY NEAR OCOTILLO WELLS FROM DBA DOOLITTLE ROAD 3.2 MILES EAST OF YAQUI PASS ROAD TO CONSTRUCTION IMPERIAL COUNTY LINE 15 BUSINESS PARKWAY SUITE 105 SACRAMENTO CA 95828 FED. AID NO. N O N E MICRO-SURFACING, STRIPING, SHOULDER BACKIN ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 50,000.00 6.000 6,000.00 6.000 6,000 003 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.448 6,720.00 0.448 6,720 004 TRAFFIC CONTROL SYSTEM LS 502,853.0000 502,853.00 0.120 60,342.36 0.120 60,342 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 200.0000 10,000.00 0.000 0 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 100.0000 5,000.00 2.000 200.00 2.000 200 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,250.0000 10,500.00 0.240 1,260.00 0.240 1,260 008 JOB SITE MANAGEMENT LS 50,000.0000 50,000.00 0.120 6,000.00 0.120 6,000 009 WATER POLLUTION CONTROL PROGRAM LS 6,500.0000 6,500.00 0.750 4,875.00 0.750 4,875 010 MANAGE SOLID WASTE GENERATED BY THE HR 100.0000 2,000.00 0.000 0 PUBLIC 011 TREATED WOOD WASTE LB 1.5000 3,090.00 0.000 0 012 SHOULDER BACKING TON 53.0000 209,880.00 0.000 0 013 ASPHALTIC EMULSION (FOG SEAL COAT) TON 5,000.0000 19,000.00 0.000 0 014 MICRO-SURFACING TON 125.0000 553,750.00 0.000 0 015 RAP MICRO-SURFACING TON 400.0000 26,800.00 0.000 0 016 HOT MIX ASPHALT (TYPE A) TON 200.0000 1,160.00 0.000 0 017 TACK COAT TON 500.0000 50.00 0.000 0 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 55.0000 2,475.00 0.000 0 019 TEMPORARY HIGH VISIBILITY FENCE LF 13.0000 73,970.00 0.000 0 020 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 14,880.00 0.000 0 021 MILEPOST MARKER EA 150.0000 4,800.00 0.000 0 022 REMOVE MARKER EA 50.0000 600.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2584 TIME 08:00 AM ESTIMATE NO. 001 BID OPENING 05/05/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: JOSE GUILLERMO SILLAS DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE ROADSIDE SIGN EA 225.0000 3,825.00 0.000 0 024 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.0000 1,232.00 0.000 0 (0.063"-UNFRAMED) 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 1,170.00 0.000 0 (0.080"-UNFRAMED) 026 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 23.0000 4,830.00 0.000 0 (0.080"-FRAMED) 027 ROADSIDE SIGN - ONE POST EA 425.0000 6,375.00 0.000 0 028 ROADSIDE SIGN - TWO POST EA 1,400.0000 5,600.00 0.000 0 029 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 5.0000 2,850.00 0.000 0 WET NIGHT VISIBILITY) 030 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 18,640.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 031 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 251,100.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 032 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 2,040.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 033 REMOVE TRAFFIC STRIPE LF 0.3000 72,000.00 0.000 0 034 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 1,140.00 0.000 0 035 6" RUMBLE STRIP (ASPHALT CONCRETE STA 66.0000 106,920.00 0.000 0 PAVEMENT) 036 12" RUMBLE STRIP (ASPHALT CONCRETE STA 73.0000 59,130.00 0.000 0 PAVEMENT) 037 CONTRAST STRIPE PAINT (2-COAT) LF 0.1000 5,840.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2584 TIME 08:00 AM ESTIMATE NO. 001 BID OPENING 05/05/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: JOSE GUILLERMO SILLAS DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 90,397.36 90,397.36 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 90,397.36 90,397.36 038 MOBILIZATION LS 220,000.0000 220,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 2,330,000.00 TOTAL WORK COMPLETED 90,397.36 90,397.36 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 90,397.36 90,397.36 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/01/26 50 08/25/26 08/25/26 03/04/27 6 33 0 0 4% 12% PROGRESS IS SATISFACTORY *** SUSPENDED ON 08/25/26. JOSE GUILLERMO SILLAS RESIDENT ENGINEER