PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/26 EST. NO. 001 TIME 08:02 AM R.E. NAME: JOSE GUILLERMO SILLAS 11-2N2754 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/26 EST. NO. 001 TIME 08:02 AM R.E. NAME: JOSE GUILLERMO SILLAS 11-2N2754 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION OTH-O/S OCT 2026 CPR -5,000.00 001 -5,000.00 -5,000.00 TOTAL DEDUCTIONS -5,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2754 TIME 08:02 AM ESTIMATE NO. 001 BID OPENING 04/07/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: JOSE GUILLERMO SILLAS DATE OF THIS ESTIMATE 10/21/26 LOCATION PROGRESS ESTIMATE 11-IMP-115-30.0/34.5 ----------------- DOOLITTLE CONSTRUCTION, LLC IMPERIAL COUNTY NEAR CALIPATRIA FROM 0.1 DBA DOOLITTLE ROAD MILE SOUTH OF ALBRIGHT ROAD TO 0.5 MILE CONSTRUCTION NORTH OF BLAIR ROAD 15 BUSINESS PARKWAY SUITE 105 SACRAMENTO CA 95828 FED. AID NO. N O N E MICRO-SURFACING, SHOULDER BACKING, RUMBLE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 500.0000 25,000.00 20.000 10,000.00 20.000 10,000 003 CONSTRUCTION AREA SIGNS LS 22,000.0000 22,000.00 0.560 12,320.00 0.560 12,320 004 TRAFFIC CONTROL SYSTEM LS 191,207.3000 191,207.30 0.400 76,482.92 0.400 76,482 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 400.0000 20,000.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 1,900.0000 7,600.00 0.800 1,520.00 0.800 1,520 007 JOB SITE MANAGEMENT LS 50,000.0000 50,000.00 0.400 20,000.00 0.400 20,000 008 WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750 009 MANAGE SOLID WASTE GENERATED BY THE HR 100.0000 2,000.00 0.000 0 PUBLIC 010 TREATED WOOD WASTE LB 1.7500 5,267.50 0.000 0 011 SHOULDER BACKING TON 128.0000 198,400.00 0.000 0 012 ASPHALTIC EMULSION (FOG SEAL COAT) TON 4,000.0000 7,600.00 0.000 0 013 MICRO-SURFACING TON 135.0000 202,500.00 0.000 0 014 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 3,880.00 0.000 0 015 REMOVE ROADSIDE SIGN EA 125.0000 4,125.00 0.000 0 016 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 2,400.00 0.000 0 (0.063"-UNFRAMED) 017 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 1,760.00 0.000 0 (0.080"-UNFRAMED) 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 29.0000 1,392.00 0.000 0 (0.063"-FRAMED) 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 1,200.00 0.000 0 (0.080"-FRAMED) 020 ROADSIDE SIGN - ONE POST EA 350.0000 8,750.00 0.000 0 021 ROADSIDE SIGN - TWO POST EA 600.0000 4,800.00 0.000 0 022 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 8.0000 5,600.00 0.000 0 WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 2 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2754 TIME 08:02 AM ESTIMATE NO. 001 BID OPENING 04/07/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: JOSE GUILLERMO SILLAS DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 16,320.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 59,800.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 025 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 1,320.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 026 REMOVE TRAFFIC STRIPE LF 0.5000 44,700.00 71,759.000 35,879.50 71,759.000 35,879 027 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.5000 1,750.00 770.000 1,925.00 770.000 1,925 028 6" RUMBLE STRIP (ASPHALT CONCRETE STA 94.3400 45,283.20 0.000 0 PAVEMENT) 029 12" RUMBLE STRIP (ASPHALT CONCRETE STA 71.0000 17,040.00 0.000 0 PAVEMENT) 030 CONTRAST STRIPE PAINT (2-COAT) LF 0.5000 4,305.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N2754 TIME 08:02 AM ESTIMATE NO. 001 BID OPENING 04/07/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: JOSE GUILLERMO SILLAS DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 166,877.42 166,877.42 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 166,877.42 166,877.42 031 MOBILIZATION LS 100,000.0000 100,000.00 0.750 75,000.00 0.750 75,000 ORIGINAL CONTRACT AMOUNT 1,066,000.00 TOTAL WORK COMPLETED 241,877.42 241,877.42 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -5,000.00 -5,000.00 TOTAL 236,877.42 236,877.42 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/21/26 50 00/00/00 07/15/26 01/23/27 20 48 0 0 23% 40% PROGRESS IS SATISFACTORY *** SUSPENDED ON 07/15/26. JOSE GUILLERMO SILLAS RESIDENT ENGINEER