PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/24/09 EST. NO.08 TIME 02:17 PM R.E. NAME: SILVA, GUS 11-2T0914 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0040 1,662.35 E.W. @ F.A.(+) 020209 N 189.10 0044 586.11 110708 N 0153.0 0048 244.53 012009 N 0181.0 0049 230.63 011509 N 0182.0 0050 83.48 011409 N 0185.0 0052 193.47 111208 N 0149.0 008 0002 295.57 E.W. @ F.A.(+) 102308 N 0108.0 010 0002 236.79 E.W. @ F.A.(+) 102308 N 0109.0 012 0024 306.30 E.W. @ F.A.(+) 110408 N 0124.0 0025 3,102.00 110408 N 0127.0 0027 117.66 111008 N 0151.0 032 0001 443.37 E.W. @ F.A.(+) 110608 N 0155.0 035 0001 1,658.40 E.W. @ F.A.(+) 102008 N 0092.0 0002 6,284.52 102008 N 0093.0 0003 3,768.26 102108 N 100.00 0004 343.19 112508 N 0132.0 0005 620.74 012009 N 0180.0 036 0003 356.36 E.W. @ F.A.(+) 010709 N 0183.0 20,533.73 TOTAL THIS ESTIMATE 987,986.93 TOTAL PREVIOUS ESTIMATE 1,008,520.66 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/24/09 EST. NO.08 TIME 02:17 PM R.E. NAME: SILVA, GUS 11-2T0914 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CPM BASELINE SCHED. -105,570.22 01 CPM BASELINE SCHED. -216,553.47 02 SURVEY RESTAKING -1,020.00 05 CPM BASELINE SCHED. 322,123.69 07 0.00 -1,020.00 LABOR COMPLIANCE VIOLATION O/S PRS JULY -10,000.00 02 O/S PRS SEPT -10,000.00 04 O/S PRS NOV -10,000.00 06 0.00 -30,000.00 TOTAL DEDUCTIONS 0.00 -31,020.00 PROGRAM CAS145 PAGE 1 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 LOCATION PROGRESS ESTIMATE 11-SD-15-R10.5/M15.0 ----------------- FCI CONSTRUCTORS, INC. IN SAN DIEGO COUNTY IN SAN DIEGO 10050 BLACK MOUNTAIN ROAD FROM 0.1 KM SOUTH OF ROUTE 52/15 SAN DIEGO,CA 92126 SEPARATION TO CARROLL CANYON ROAD OVERCROSSING FED. AID NO. N O N E CONSTRUCT MANAGED LANES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 12,500.0000 12,500.00 0.000 0.00 02 TIME-RELATED OVERHEAD WDAY 4,100.0000 2,460,000.00 19.000 77,900.00 143.000 586,300.00 03 TEMPORARY CHAIN LINK GATE EA 500.0000 500.00 0.000 0.00 S) 04 TEMPORARY FENCE (TYPE ESA) M 13.0000 76,700.00 4,200.000 54,600.00 05 CONSTRUCTION SITE MANAGEMENT LS 90,000.0000 90,000.00 0.242 21,780.00 06 PREPARE STORM WATER POLLUTION LS 500.0000 500.00 0.829 414.50 S) PREVENTION PLAN 07 TEMPORARY HYDRAULIC MULCH M2 0.3500 16,135.00 2,839.000 993.65 S) 08 TEMPORARY FIBER ROLL M 11.0000 308,000.00 2,291.000 25,201.00 11,225.400 123,479.40 09 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,200.0000 37,200.00 1.000 1,200.00 13.000 15,600.00 10 TEMPORARY CONSTRUCTION ENTRANCE EA 2,700.0000 148,500.00 1.000 2,700.00 13.000 35,100.00 11 TEMPORARY CHECK DAM M 37.0000 4,440.00 42.000 1,554.00 138.300 5,117.10 12 MOVE-IN/MOVE-OUT EA 300.0000 1,500.00 3.000 900.00 S) (TEMPORARY EROSION CONTROL) 13 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 30,000.00 8.000 1,600.00 132.000 26,400.00 14 TEMPORARY HYDRAULIC MULCH M2 0.8000 5,280.00 0.000 0.00 S) (BONDED FIBER MATRIX) 15 STREET SWEEPING LS 75,000.0000 75,000.00 0.242 18,150.00 16 CONSTRUCTION AREA SIGNS LS 48,000.0000 48,000.00 0.433 20,784.00 S) 17 TRAFFIC CONTROL SYSTEM LS 300,000.0000 300,000.00 0.242 72,600.00 S) 18 TYPE III BARRICADE EA 75.0000 1,500.00 0.000 0.00 S) 19 TYPE III BARRICADE (LEFT IN PLACE) EA 100.0000 800.00 0.000 0.00 S) 20 TEMPORARY TRAFFIC STRIPE (PAINT) M 5.0000 3,350.00 0.000 0.00 S) 21 TEMPORARY PAVEMENT MARKER EA 10.0000 710.00 0.000 0.00 S) 22 PORTABLE CHANGEABLE MESSAGE SIGN EA 22,000.0000 330,000.00 3.625 79,750.00 S) PROGRAM CAS145 PAGE 2 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 TEMPORARY RAILING (TYPE K) M 29.0000 1,128,100.00 250.100 7,252.90 12,141.810 352,112.49 24 TRAFFIC PLASTIC DRUM (LEFT IN PLACE) EA 80.0000 12,800.00 0.000 0.00 S) 25 TRAFFIC PLASTIC DRUM EA 40.0000 24,400.00 65.000 2,600.00 S) 26 TEMPORARY CRASH CUSHION MODULE EA 200.0000 64,000.00 123.000 24,600.00 S) 27 CRASH CUSHION MODULE (LEFT IN PLACE) EA 500.0000 14,000.00 0.000 0.00 S) 28 TEMPORARY CRASH CUSHION (ABSORB 350) EA 1,000.0000 1,000.00 1.000 1,000.00 S) 29 ABANDON CULVERT EA 1,300.0000 59,800.00 2.000 2,600.00 5.000 6,500.00 30 ABANDON INLET EA 1,110.0000 41,070.00 9.000 9,990.00 31 ABANDON IRRIGATION CROSSOVER EA 1,160.0000 26,680.00 5.000 5,800.00 32 REMOVE CHAIN LINK FENCE M 25.0000 21,000.00 15.000 375.00 33 REMOVE METAL BEAM GUARD RAILING M 30.0000 27,300.00 139.200 4,176.00 S) 34 REMOVE DOUBLE THRIE BEAM BARRIER M 80.0000 85,600.00 0.000 0.00 S) 35 REMOVE TRAFFIC STRIPE M 1.3500 108,000.00 24,086.420 32,516.67 S) 36 REMOVE PAVEMENT MARKING M2 20.0000 280.00 78.583 1,571.66 S) 37 REMOVE ROADSIDE SIGN EA 125.0000 3,250.00 8.000 1,000.00 S) 38 REMOVE SIGN STRUCTURE EA 5,000.0000 80,000.00 7.000 35,000.00 39 REMOVE ASPHALT CONCRETE DIKE M 1.5000 14,010.00 2,971.810 4,457.72 40 REMOVE SLOPE PAVING LS 1.0000 1.00 0.000 0.00 41 REMOVE DELINEATOR EA 50.0000 3,500.00 0.000 0.00 42 RESET ROADSIDE SIGN EA 300.0000 4,500.00 0.000 0.00 43 RELOCATE HOV POP-UP CONTROL SYSTEM LS 25,000.0000 25,000.00 0.500 12,500.00 S) 44 RELOCATE ROADSIDE SIGN EA 300.0000 8,700.00 0.000 0.00 45 RELOCATE SIGN STRUCTURE EA 5,000.0000 5,000.00 0.000 0.00 46 ADJUST FRAME AND COVER TO GRADE EA 600.0000 2,400.00 0.000 0.00 47 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 7.0000 14,070.00 0.000 0.00 S) 48 SALVAGE HOV TOLL BOOTH LS 3,700.0000 3,700.00 0.000 0.00 49 REMOVE CONCRETE CURB AND SIDEWALK M 33.0000 13,530.00 126.000 4,158.00 PROGRAM CAS145 PAGE 3 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 REMOVE CONCRETE BARRIER M 26.0000 223,600.00 0.000 0.00 51 REMOVE CONCRETE BARRIER (TYPE K) M 25.0000 1,200.00 0.000 0.00 52 ACCESS OPENING, SOFFIT EA 2,700.0000 2,700.00 0.000 0.00 53 CAP INLET EA 2,100.0000 33,600.00 4.000 8,400.00 54 CAP RISER EA 1,600.0000 24,000.00 2.000 3,200.00 55 REMOVE CRASH CUSHION (TYPE GREAT) EA 2,000.0000 12,000.00 0.000 0.00 56 REMOVE CRASH CUSHION EA 135.0000 1,890.00 0.000 0.00 (SAND FILLED, MODULE) 57 BRIDGE REMOVAL (PORTION), LOCATION A LS 20,000.0000 20,000.00 0.000 0.00 58 BRIDGE REMOVAL (PORTION), LOCATION B LS 9,000.0000 9,000.00 0.000 0.00 59 BRIDGE REMOVAL (PORTION), LOCATION C LS 10,000.0000 10,000.00 1.000 10,000.00 60 BRIDGE REMOVAL (PORTION), LOCATION D LS 8,000.0000 8,000.00 1.000 8,000.00 61 BRIDGE REMOVAL (PORTION), LOCATION E LS 8,500.0000 8,500.00 1.000 8,500.00 62 CLEARING AND GRUBBING LS 200,000.0000 200,000.00 0.700 140,000.00 63 DEVELOP WATER SUPPLY LS 40,000.0000 40,000.00 0.369 14,760.00 64 ROADWAY EXCAVATION M3 17.0000 2,601,000.00 1,265.000 21,505.00 57,474.530 977,067.01 65 STRUCTURE EXCAVATION (BRIDGE) M3 63.0000 69,300.00 0.000 0.00 F) 66 STRUCTURE EXCAVATION (RETAINING WALL) M3 50.0000 373,350.00 745.000 37,250.00 F) 67 STRUCTURE EXCAVATION (TIEBACK WALL) M3 290.0000 250,850.00 328.000 95,120.00 531.600 154,164.00 F) 68 STRUCTURE EXCAVATION (SOIL NAIL WALL) M3 350.0000 54,250.00 76.400 26,740.00 155.000 54,250.00 F) 69 STRUCTURE BACKFILL (BRIDGE) M3 99.0000 26,730.00 0.000 0.00 F) 70 STRUCTURE BACKFILL (RETAINING WALL) M3 30.0000 372,570.00 330.000 9,900.00 510.000 15,300.00 F) 71 STRUCTURE BACKFILL (TIEBACK WALL) M3 650.0000 28,600.00 0.000 0.00 F) 72 STRUCTURE BACKFILL (SOIL NAIL WALL) M3 340.0000 5,100.00 0.000 0.00 F) 73 PERVIOUS BACKFILL MATERIAL (RETAINING M3 85.0000 88,825.00 12.000 1,020.00 F) WALL) 74 SAND BACKFILL M3 130.0000 157,300.00 22.620 2,940.60 65.630 8,531.90 75 SOIL NAIL ASSEMBLY M 100.0000 74,500.00 175.800 17,580.00 786.400 78,640.00 S) 76 EROSION CONTROL (BIOFILTRATION) M2 12.5000 13,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 EROSION CONTROL (TYPE D) M2 0.8000 88,000.00 0.000 0.00 S) 78 EROSION CONTROL (HYDRAULIC MATRIX) M2 2.2500 16,470.00 0.000 0.00 S) 79 FIBER ROLLS M 7.5000 3,825.00 0.000 0.00 80 COMPOST, INCORPORATE M2 2.0000 14,640.00 0.000 0.00 S) 81 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 400.0000 2,000.00 0.000 0.00 S) 82 TRUCK WATERING LS 18,000.0000 18,000.00 0.000 0.00 83 IRRIGATION SYSTEM LS 70,000.0000 70,000.00 0.487 34,090.00 S) 84 250 MM CORRUGATED HIGH DENSITY M 335.0000 23,450.00 0.000 0.00 POLYETHYLENE PIPE CONDUIT 85 EXTEND 250 MM CONDUIT M 950.0000 22,800.00 16.000 15,200.00 86 EXTEND 500 MM CONDUIT M 1,300.0000 7,800.00 6.000 7,800.00 87 FINISHING ROADWAY LS 50,000.0000 50,000.00 0.000 0.00 88 CLASS 2 AGGREGATE BASE M3 37.0000 2,046,100.00 186.000 6,882.00 16,313.666 603,605.64 89 ASPHALT TREATED PERMEABLE BASE M3 139.0000 681,100.00 0.000 0.00 90 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 1,200.0000 21,600.00 0.000 0.00 91 ASPHALT CONCRETE (TYPE A) TONN 83.0000 2,523,200.00 99.380 8,248.54 5,937.606 492,821.30 92 ASPHALT CONCRETE BASE (TYPE A) TONN 79.0000 2,741,300.00 6,296.810 497,447.99 93 PLACE ASPHALT CONCRETE DIKE M 4.0000 34,000.00 0.000 0.00 94 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 12.0000 16,800.00 0.000 0.00 AREA) 95 ASPHALTIC EMULSION (PAINT BINDER) TONN 2,500.0000 1,250.00 0.000 0.00 96 CONCRETE PAVEMENT M3 245.0000 6,835,500.00 -127.379 -31,207.86 5,129.826 1,256,807.37 97 SEAL PAVEMENT JOINT M 4.2500 166,175.00 3,577.000 15,202.25 5,799.340 24,647.20 98 SEAL LONGITUDINAL ISOLATION JOINT M 21.2000 334,960.00 782.000 16,578.40 2,756.000 58,427.20 99 REPAIR SPALLED JOINTS M2 1,000.0000 10,000.00 0.000 0.00 00 GRIND EXISTING CONCRETE M2 5.0000 86,000.00 17,285.000 86,425.00 S) PAVEMENT 01 1524 MM CAST-IN-DRILLED HOLE CONCRETE M 2,800.0000 560,000.00 0.000 0.00 S) PILE 02 PRESTRESSING CAST-IN-PLACE CONCRETE LS 125,000.0000 125,000.00 0.000 0.00 S) 03 TIEBACK ANCHOR EA 2,000.0000 406,000.00 79.000 158,000.00 145.000 290,000.00 S) PROGRAM CAS145 PAGE 5 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 INCLINOMETER LS 20,000.0000 20,000.00 0.500 10,000.00 S) 05 STRUCTURAL CONCRETE, CIP WALL FACE M3 880.0000 290,400.00 39.000 34,320.00 39.000 34,320.00 F) 06 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 300.0000 97,500.00 0.000 0.00 F) 07 STRUCTURAL CONCRETE, BRIDGE M3 598.0000 580,060.00 0.000 0.00 F) 08 STRUCTURAL CONCRETE, RETAINING WALL M3 430.0000 1,891,570.00 204.310 87,853.30 F) 09 CLASS 2 CONCRETE (MINOR STRUCTURE) M3 1,500.0000 43,500.00 5.730 8,595.00 19.250 28,875.00 10 CLASS 4 CONCRETE (BACKFILL) M3 168.0000 63,840.00 114.070 19,163.76 11 CLASS 1 CONCRETE (BOX CULVERT) M3 1,530.0000 18,360.00 0.000 0.00 F) 12 MINOR CONCRETE (MINOR STRUCTURE) M3 1,868.0000 544,148.40 23.396 43,703.73 96.739 180,708.45 F) 13 ARCHITECTURAL SURFACE (BARRIER) M2 40.0000 24,000.00 0.000 0.00 14 SWIRLED PLASTER TEXTURE M2 20.0000 105,600.00 260.000 5,200.00 260.000 5,200.00 F) 15 DRILL AND BOND DOWEL M 100.0000 9,200.00 0.000 0.00 16 CORE CONCRETE (0 - 50 MM) M 750.0000 27,750.00 0.000 0.00 S) 17 BAR REINFORCING STEEL (CIP WALL FACE) KG 3.0000 172,200.00 22,813.000 68,439.00 31,284.000 93,852.00 SF) 18 BAR REINFORCING STEEL (BRIDGE) KG 2.0000 205,600.00 0.000 0.00 SF) 19 BAR REINFORCING STEEL (RETAINING WALL) KG 2.5000 738,205.00 13,396.000 33,490.00 SF) 20 BAR REINFORCING STEEL (BOX CULVERT) KG 2.3000 5,290.00 0.000 0.00 SF) 21 SHOTCRETE M3 700.0000 258,300.00 81.860 57,302.00 263.200 184,240.00 F) 22 FURNISH SIGN STRUCTURE (TUBULAR) KG 10.0000 2,004,840.00 0.000 0.00 F) 23 INSTALL SIGN STRUCTURE (TUBULAR) KG 1.0000 200,484.00 0.000 0.00 SF) 24 FURNISH LAMINATED PANEL SIGN M2 160.0000 84,800.00 0.000 0.00 (25.4 MM-TYPE A) 25 FURNISH SINGLE SHEET ALUMINUM SIGN M2 90.0000 2,790.00 0.000 0.00 (1.6 MM-UNFRAMED) 26 FURNISH SINGLE SHEET ALUMINUM SIGN M2 100.0000 1,200.00 0.000 0.00 (2.0 MM-UNFRAMED) 27 FURNISH SINGLE SHEET ALUMINUM SIGN M2 110.0000 2,420.00 0.000 0.00 (1.6 MM-FRAMED) 28 FURNISH SINGLE SHEET ALUMINUM SIGN M2 110.0000 770.00 0.000 0.00 (2.0 MM-FRAMED) 29 METAL (RAIL MOUNTED SIGN) KG 10.0000 2,400.00 0.000 0.00 30 ROADSIDE SIGN-ONE POST EA 500.0000 1,500.00 0.000 0.00 (WEED CONTROL MAT RUBBER) PROGRAM CAS145 PAGE 6 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 ROADSIDE SIGN - ONE POST EA 35.0000 840.00 0.000 0.00 32 ROADSIDE SIGN - TWO POST EA 1,200.0000 3,600.00 0.000 0.00 33 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 100.0000 500.00 0.000 0.00 METHOD) 34 INSTALL SIGN OVERLAY M2 750.0000 3,975.00 0.000 0.00 35 INSTALL ROADSIDE SIGN PANEL ON EA 300.0000 2,700.00 0.000 0.00 EXISTING POST 36 INSTALL SIGN PANEL ON EXISTING SIGN M2 200.0000 42,000.00 0.000 0.00 STRUCTURE 37 450 MM ALTERNATIVE PIPE CULVERT M 134.0000 290,780.00 662.170 88,730.78 38 600 MM ALTERNATIVE PIPE CULVERT M 189.0000 487,620.00 4.500 850.50 1,733.200 327,574.80 39 750 MM ALTERNATIVE PIPE CULVERT M 249.0000 303,780.00 1.500 373.50 546.240 136,013.76 40 900 MM ALTERNATIVE PIPE CULVERT M 315.0000 66,150.00 69.200 21,798.00 41 1050 MM ALTERNATIVE PIPE CULVERT M 630.0000 94,500.00 8.000 5,040.00 42 450 MM REINFORCED CONCRETE PIPE M 226.0000 33,900.00 88.000 19,888.00 43 600 MM REINFORCED CONCRETE PIPE M 580.0000 53,360.00 0.000 0.00 44 1200 MM REINFORCED CONCRETE PIPE M 650.0000 253,500.00 130.800 85,020.00 170.400 110,760.00 45 750 MM BITUMINOUS COATED PAVED INVERT M 600.0000 3,600.00 6.000 3,600.00 CORRUGATED STEEL PIPE (2.01 MM THICK) 46 1440 MM X 970 MM BITUMINOUS COATED PAVED M 540.0000 13,500.00 24.400 13,176.00 INVERT CORRUGATED STEEL PIPE ARCH (2.01 MM THICK) 47 80 MM PLASTIC PIPE (EDGE DRAIN) M 35.0000 115,850.00 0.000 0.00 48 80 MM PLASTIC PIPE (EDGE DRAIN OUTLET) M 142.0000 12,070.00 0.000 0.00 49 DRAINAGE INLET MARKER EA 600.0000 1,800.00 0.000 0.00 50 GRATED LINE DRAIN M 300.0000 123,000.00 0.000 0.00 51 GRATED LINE DRAIN (WITH EXTENSIONS) M 355.0000 237,850.00 0.000 0.00 52 900 MM BITUMINOUS COATED CORRUGATED M 1,700.0000 1,360.00 0.000 0.00 STEEL PIPE RISER (2.01 MM THICK) 53 600 MM ALTERNATIVE FLARED END SECTION EA 640.0000 640.00 0.000 0.00 54 900 MM PRECAST CONCRETE PIPE RISER M 1,800.0000 43,200.00 1.000 1,800.00 55 300 MM ALTERNATIVE PIPE RISER M 1,400.0000 7,000.00 1.200 1,680.00 56 450 MM ALTERNATIVE PIPE RISER M 1,100.0000 12,100.00 0.000 0.00 PROGRAM CAS145 PAGE 7 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 57 ROCK SLOPE PROTECTION M3 300.0000 1,800.00 1.500 450.00 (BACKING NO. 2, METHOD B) 58 MINOR CONCRETE (DITCH LINING) M3 840.0000 13,440.00 0.000 0.00 59 ROCK SLOPE PROTECTION FABRIC M2 11.0000 231.00 5.800 63.80 60 MINOR CONCRETE (GUTTER) M 85.0000 21,675.00 0.000 0.00 F) 61 MINOR CONCRETE (TEXTURED PAVING) M2 81.0000 251,100.00 0.000 0.00 62 MINOR CONCRETE (CURB, SIDEWALK AND M3 600.0000 84,000.00 0.000 0.00 CURB RAMP) 63 MISCELLANEOUS IRON AND STEEL KG 3.3000 102,498.00 7,480.200 24,684.66 7,480.200 24,684.66 SF) 64 BRIDGE DECK DRAINAGE SYSTEM KG 18.0000 5,040.00 0.000 0.00 SF) 65 MISCELLANEOUS METAL (BOX CULVERT) KG 22.0000 5,280.00 0.000 0.00 SF) 66 CHAIN LINK FENCE (TYPE CL-1.8) M 75.0000 54,750.00 0.000 0.00 S) 67 DELINEATOR (CLASS 1) EA 50.0000 10,000.00 0.000 0.00 68 MILEPOST MARKER EA 100.0000 500.00 0.000 0.00 69 GUARD RAILING DELINEATOR EA 20.0000 1,140.00 0.000 0.00 70 METAL BEAM GUARD RAILING M 120.0000 29,400.00 0.000 0.00 S) 71 CONCRETE BARRIER (TYPE K) M 80.0000 145,600.00 0.000 0.00 72 DOUBLE THRIE BEAM BARRIER M 200.0000 24,000.00 0.000 0.00 S) 73 CABLE RAILING M 50.0000 9,950.00 0.000 0.00 SF) 74 TRANSITION RAILING (TYPE WB) EA 3,500.0000 17,500.00 0.000 0.00 S) 75 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 875.0000 11,375.00 0.000 0.00 S) 76 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,500.0000 45,000.00 0.000 0.00 S) 77 CRASH CUSHION (REACT 9CBB) EA 50,000.0000 200,000.00 0.000 0.00 S) 78 CONCRETE BARRIER (TYPE 60GE MODIFIED) M 560.0000 72,240.00 0.000 0.00 F) 79 CONCRETE BARRIER (TYPE 60D MODIFIED) M 1,000.0000 5,000.00 0.000 0.00 F) 80 CONCRETE BARRIER (TYPE 60) M 1,200.0000 3,600.00 0.000 0.00 F) 81 CONCRETE BARRIER (TYPE 60D) M 220.0000 54,780.00 0.000 0.00 F) 82 CONCRETE BARRIER (TYPE 60G) M 350.0000 105,000.00 0.000 0.00 83 CONCRETE BARRIER (TYPE 60GC) M 590.0000 23,600.00 0.000 0.00 PROGRAM CAS145 PAGE 8 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 84 CONCRETE BARRIER (TYPE 60GE) M 1,200.0000 480,000.00 0.000 0.00 85 CONCRETE BARRIER (TYPE 60S) M 180.0000 225,000.00 0.000 0.00 86 CONCRETE BARRIER (TYPE 60SC) M 200.0000 1,128,000.00 0.000 0.00 87 CONCRETE BARRIER (TYPE GC MODIFIED) M 970.0000 41,710.00 0.000 0.00 88 CONCRETE BARRIER (TYPE 736A MODIFIED) M 245.0000 286,650.00 60.000 14,700.00 60.000 14,700.00 89 CONCRETE BARRIER (TYPE 60SC MODIFIED) M 900.0000 83,700.00 0.000 0.00 90 THERMOPLASTIC PAVEMENT MARKING M2 40.0000 6,800.00 0.000 0.00 S) 91 150 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 360.00 0.000 0.00 S) 92 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 3,920.00 0.000 0.00 S) 93 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 1,380.00 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 94 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6500 35.75 0.000 0.00 S) (BROKEN 1.83 M - 0.30 M) 95 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6500 247.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 96 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 1,740.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 97 150 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 45.00 0.000 0.00 S) (BROKEN 2.44 M - 1.22 M) 98 PAINT TRAFFIC STRIPE (2-COAT) M 0.4500 114,300.00 67,798.750 30,509.44 S) 99 PAINT PAVEMENT MARKING M2 30.0000 2,820.00 65.650 1,969.50 S) 00 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 37,800.00 11,178.000 11,178.00 S) 01 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 30,000.00 4,235.000 8,470.00 S) 02 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION 03 SIGNAL AND LIGHTING (LOCATION 1) LS 149,000.0000 149,000.00 0.000 0.00 S) 04 SIGNAL AND LIGHTING (LOCATION 2) LS 189,000.0000 189,000.00 0.056 10,584.00 S) 05 LIGHTING (TEMPORARY) LS 370,000.0000 370,000.00 0.514 190,180.00 S) 06 LIGHTING AND SIGN ILLUMINATION LS 715,000.0000 715,000.00 0.184 131,560.00 0.627 448,305.00 S) 07 CHANGEABLE MESSAGE SIGN SYSTEM LS 169,000.0000 169,000.00 0.000 0.00 S) 08 TEMPORARY COMMUNICATION SYSTEM LS 15,000.0000 15,000.00 0.000 0.00 S) 09 TRAFFIC MONITORING STATION (LOCATION 1) LS 56,000.0000 56,000.00 0.000 0.00 S) 10 TRAFFIC MONITORING STATION (LOCATION 2) LS 45,000.0000 45,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 9 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 11 TRAFFIC MONITORING STATION (LOCATION 3) LS 34,500.0000 34,500.00 0.000 0.00 S) 12 TRAFFIC MONITORING STATION (LOCATION 4) LS 53,400.0000 53,400.00 0.000 0.00 S) 13 TRAFFIC MONITORING STATION (LOCATION 5) LS 60,700.0000 60,700.00 0.000 0.00 S) 14 TEMPORARY TRAFFIC MONITORING STATION LS 340,000.0000 340,000.00 0.667 226,780.00 S) 15 TEMPORARY RAMP METERING SYSTEM LS 99,000.0000 99,000.00 0.465 46,035.00 S) (LOCATION 1) 16 TEMPORARY RAMP METERING SYSTEM LS 100,000.0000 100,000.00 0.544 54,400.00 S) (LOCATION 2) 17 TEMPORARY RAMP METERING SYSTEM LS 35,400.0000 35,400.00 0.000 0.00 S) (LOCATION 3) 18 TEMPORARY RAMP METERING SYSTEM LS 64,000.0000 64,000.00 0.176 11,264.00 S) (LOCATION 4) 19 TEMPORARY RAMP METERING SYSTEM LS 33,000.0000 33,000.00 0.343 11,319.00 S) (LOCATION 5) 20 HOV REVERSIBLE LANE SYSTEM LS 165,000.0000 165,000.00 0.367 60,555.00 S) 21 REMOVE AND MAINTAIN TOLL BOOTH SERVICES LS 40,800.0000 40,800.00 0.000 0.00 S) 22 RAMP METERING SYSTEM (LOCATION 1) LS 48,000.0000 48,000.00 0.000 0.00 S) 23 RAMP METERING SYSTEM (LOCATION 2) LS 100,000.0000 100,000.00 0.048 4,800.00 0.048 4,800.00 S) 24 RAMP METERING SYSTEM (LOCATION 3) LS 36,000.0000 36,000.00 0.000 0.00 S) 25 RAMP METERING SYSTEM (LOCATION 4) LS 62,000.0000 62,000.00 0.000 0.00 S) 26 RAMP METERING SYSTEM (LOCATION 5) LS 62,400.0000 62,400.00 0.000 0.00 S) 27 FIBER OPTIC COMMUNICATION SYSTEM LS 700,000.0000 700,000.00 0.266 186,200.00 S) PROGRAM CAS145 PAGE 10 DATE 02/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T0914 TIME 02:17 PM ESTIMATE NO. 08 BID OPENING 05/01/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/09 R.E. NAME: SILVA, GUS DATE OF THIS ESTIMATE 02/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 947,045.22 9,196,892.05 ADJUSTMENT OF COMPENSATION 0.00 -66,311.13 EXTRA WORK 20,533.73 1,074,831.79 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 967,578.95 10,205,412.71 28 MOBILIZATION LS 3930,000.0000 3,930,000.00 0.950 3,733,500.00 ORIGINAL CONTRACT AMOUNT 48,380,250.15 TOTAL WORK COMPLETED 967,578.95 13,938,912.71 MATERIALS ON HAND ON SITE 1,825,392.64 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -31,020.00 TOTAL 967,578.95 15,733,285.35 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE SYSTEM ELEMENTS DURING CONN O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/11/08 600 06/30/08 06/30/08 12/22/10 143 17 0 0 28% 24% PROGRESS IS SATISFACTORY SILVA, GUS RESIDENT ENGINEER PROGRAM CAS145 PAGE 5 DATE 02/24/09