PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/22/14 EST. NO. 002 TIME 09:16 AM R.E. NAME: HURTZIG, JOHN 11-2T1784 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/22/14 EST. NO. 002 TIME 09:16 AM R.E. NAME: HURTZIG, JOHN 11-2T1784 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T1784 TIME 09:16 AM ESTIMATE NO. 002 BID OPENING 07/10/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/14 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 12/22/14 LOCATION PROGRESS ESTIMATE 11-SD-5-35.8/38.5 ----------------- WESTERN RIM CONSTRUCTORS INC IN SAN DIEGO COUNTY IN SAN DIEGO, 912 S ANDREASEN DRIVE STE 108 SOLANA BEACH, AND ENCINITAS FROM ESCONDIDO CA 92029 0.1 M NORTH OF SAN DIEGUITO RIVER BRIDGE TO SAN ELIJO LAGOON BRIDGE HWY PLANTING AND MITIGATION FED. AID NO. N O N E I-5 LOMAS HWY PLANTING STAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,276.7400 3,276.74 0.750 2,457 002 CONSTRUCTION AREA SIGNS LS 11,076.6800 11,076.68 0.010 110.77 0.268 2,968 003 TRAFFIC CONTROL SYSTEM LS 47,475.6600 47,475.66 0.180 8,545.62 0.310 14,717 004 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,767.0600 11,534.12 0.000 0 005 JOB SITE MANAGEMENT LS 10,485.5600 10,485.56 0.090 943.70 0.155 1,625 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,310.6900 1,310.69 0.750 983 007 TEMPORARY CHECK DAM LF 6.5500 917.00 45.000 294.75 45.000 294 008 TEMPORARY DRAINAGE INLET PROTECTION EA 458.7400 7,798.58 17.000 7,798.58 17.000 7,798 009 TEMPORARY FIBER ROLL LF 4.5900 5,645.70 640.000 2,937.60 640.000 2,937 010 TEMPORARY CONSTRUCTION ENTRANCE EA 4,587.4300 4,587.43 1.000 4,587.43 1.000 4,587 011 STREET SWEEPING LS 1,048.5600 1,048.56 0.000 0 012 TEMPORARY CONCRETE WASHOUT LS 786.4200 786.42 0.000 0 013 REMOVE IRRIGATION FACILITY LS 9,830.2100 9,830.21 1.000 9,830.21 1.000 9,830 014 DITCH EXCAVATION CY 29.8400 1,432.32 0.000 0 015 SLOPE REPAIR SQFT 4.8600 14,725.80 0.000 0 016 ROADSIDE CLEARING LS 35,650.8900 35,650.89 0.578 20,606.21 0.578 20,606 017 ROCK BLANKET SQFT 16.0500 71,904.00 0.000 0 018 WEED GERMINATION SQYD 0.2400 420.00 0.000 0 019 IRON SULFATE (LB) LB 3.9300 4,008.60 0.000 0 020 SOIL AMENDMENT CY 65.5300 3,145.44 0.000 0 021 PACKET FERTILIZER EA 0.3300 1,656.60 0.000 0 022 PLANT (GROUP A) EA 15.7300 56,628.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 12/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T1784 TIME 09:16 AM ESTIMATE NO. 002 BID OPENING 07/10/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/14 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 12/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLANT (GROUP B) EA 28.8400 13,843.20 0.000 0 024 SOD SQYD 10.4900 11,119.40 0.000 0 025 MAINTAIN EXISTING PLANTED AREAS LS 9,830.2100 9,830.21 0.028 275.25 0.036 353 026 PLANT ESTABLISHMENT WORK LS 58,981.2600 58,981.26 0.000 0 027 WOOD MULCH CY 62.9100 12,582.00 0.000 0 028 CHECK AND TEST EXISTING IRRIGATION LS 22,281.8100 22,281.81 0.750 16,711 FACILITIES 029 OPERATE EXISTING IRRIGATION FACILITIES LS 19,660.4200 19,660.42 0.028 550.49 0.036 707 030 CONTROL AND NEUTRAL CONDUCTORS LS 13,106.9500 13,106.95 0.000 0 031 1" REMOTE CONTROL VALVE EA 419.4200 1,677.68 0.000 0 032 CERTIFY EXISTING BACKFLOW PREVENTERS LS 1,048.5600 1,048.56 0.000 0 033 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 45.8700 366.96 0.000 0 034 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 55.0500 1,211.10 0.000 0 035 POP-UP SPRINKLER ASSEMBLY EA 26.2100 943.56 0.000 0 036 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 3.0100 5,053.79 0.000 0 (F) LINE) 037 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 3.2800 508.40 0.000 0 (F) (SUPPLY LINE) 038 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 3.6700 631.24 0.000 0 (F) (SUPPLY LINE) 039 2" PLASTIC PIPE (SCHEDULE 40) LF 4.1900 41.90 0.000 0 (F) (SUPPLY LINE) 040 3" PLASTIC PIPE (CLASS 315) LF 7.8600 1,179.00 0.000 0 (F) (SUPPLY LINE) 041 8" CORRUGATED HIGH DENSITY LF 91.7500 3,211.25 0.000 0 POLYETHYLENE PIPE CONDUIT 042 10" CORRUGATED HIGH DENSITY LF 117.9600 2,595.12 0.000 0 POLYETHYLENE PIPE CONDUIT 043 6" PLASTIC PIPE (SCHEDULE 40) (CONDUIT) LF 52.4300 4,823.56 0.000 0 044 FIBER ROLLS LF 3.9300 2,122.20 0.000 0 045 STRAW SQFT 1.0800 3,272.40 0.000 0 046 COMPOST SQFT 0.2000 2,520.00 0.000 0 047 INCORPORATE MATERIALS SQFT 0.2600 3,276.00 0.000 0 048 CHAIN LINK FENCE (TYPE CL-6) LF 65.5300 19,659.00 0.000 0 049 4' CHAIN LINK GATE (TYPE CL-6) EA 1,310.6900 1,310.69 0.000 0 PROGRAM CAS145 PAGE 3 DATE 12/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T1784 TIME 09:16 AM ESTIMATE NO. 002 BID OPENING 07/10/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/14 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 12/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 12' CHAIN LINK GATE (TYPE CL-6) EA 3,276.7400 3,276.74 0.000 0 051 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,310.6900 1,310.69 0.310 406.31 0.310 406 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 12/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2T1784 TIME 09:16 AM ESTIMATE NO. 002 BID OPENING 07/10/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/14 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 12/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 56,886.92 86,985.96 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 56,886.92 86,985.96 052 MOBILIZATION LS 55,752.6700 55,752.67 0.250 13,938.17 0.750 41,814 ORIGINAL CONTRACT AMOUNT 582,542.76 TOTAL WORK COMPLETED 70,825.09 128,800.46 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 70,825.09 128,800.46 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/08/14 850 11/04/14 09/23/14 04/09/18 28 36 0 0 24% 28% PROGRESS IS SATISFACTORY HURTZIG, JOHN RESIDENT ENGINEER PROGRAM CAS145 DATE 12/22/14