PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/26/15 EST. NO. 002 TIME 08:03 AM R.E. NAME: RIZZUTTO, SHAWN 11-407004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/26/15 EST. NO. 002 TIME 08:03 AM R.E. NAME: RIZZUTTO, SHAWN 11-407004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/26/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-407004 TIME 08:03 AM ESTIMATE NO. 002 BID OPENING 12/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/15 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/26/15 LOCATION PROGRESS ESTIMATE 11-SD-8-R61.2/R77.8 ----------------- COFFMAN SPECIALTIES, INC IN SAN DIEGO COUNTY NEAR BOULEVARD 9685 VIA EXCELENCIA AND JACUMBA FROM 0.1 MILE EAST OF SAN DIEGO CA 92126 CRESTWOOD ROAD UNDERCROSSING TO THE IMPERIAL COUNTY LINE FED. AID NO. NHPI-008 -1(315)E PAVEMENT REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 0.500 2,500.00 1.000 5,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,500.0000 2,500.00 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,500.0000 315,000.00 22.000 33,000.00 27.000 40,500 004 CONSTRUCTION AREA SIGNS LS 7,500.0000 7,500.00 0.000 0 005 TRAFFIC CONTROL SYSTEM LS 300,000.0000 300,000.00 0.000 0 006 TRAFFIC PLASTIC DRUM EA 40.0000 8,800.00 0.000 0 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,000.0000 20,000.00 0.000 0 008 TEMPORARY RAILING (TYPE K) LF 20.0000 72,000.00 0.000 0 009 TEMPORARY CRASH CUSHION MODULE EA 200.0000 52,000.00 0.000 0 010 ALTERNATIVE TEMPORARY CRASH CUSHION EA 3,500.0000 63,000.00 0.000 0 SYSTEM 011 JOB SITE MANAGEMENT LS 20,000.0000 20,000.00 0.000 0 012 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750 013 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 0.000 0 014 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 2.0000 1,480.00 0.000 0 (HAZARDOUS WASTE) 015 TREATED WOOD WASTE LB 0.2000 39,400.00 0.000 0 016 RAPID SETTING CONCRETE (PATCH) CF 350.0000 35,700.00 -0.750 -262.50 0.000 0 017 REMOVE GUARDRAIL LF 10.0000 97,700.00 0.000 0 018 REMOVE PAINTED TRAFFIC STRIPE LF 0.5000 4,505.00 0.000 0 019 REMOVE ASPHALT CONCRETE SURFACING SQFT 1.5000 30,330.00 0.000 0 020 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5.0000 4,300,000.00 0.000 0 021 REMOVE UNSOUND CONCRETE CF 275.0000 28,050.00 0.000 0 022 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3000 30,647.10 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/26/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-407004 TIME 08:03 AM ESTIMATE NO. 002 BID OPENING 12/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/15 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/26/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREAT BRIDGE DECK SQFT 0.6000 61,294.20 0.000 0 (F) 024 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 70.0000 79,450.00 0.000 0 025 IMPORTED BORROW (CY) CY 50.0000 88,000.00 0.000 0 026 ASPHALTIC EMULSION (FOG SEAL COAT) TON 835.0000 59,285.00 0.000 0 027 PRECOATED SCREENINGS TON 185.0000 2,775,000.00 0.000 0 028 PREPAVING INERTIAL PROFILER LS 25,000.0000 25,000.00 0.000 0 029 HOT MIX ASPHALT (TYPE A) TON 88.0000 4,866,400.00 0.000 0 030 MINOR HOT MIX ASPHALT TON 100.0000 570,000.00 0.000 0 031 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 104.0000 11,960,000.00 0.000 0 032 SHOULDER RUMBLE STRIP STA 9.0000 30,510.00 0.000 0 (HMA,GROUND-IN INDENTATIONS) 033 DATA CORE LS 25,000.0000 25,000.00 0.000 0 034 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.0500 55,860.00 0.000 0 035 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.0500 1,512.00 0.000 0 036 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.0500 150,150.00 0.000 0 037 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.0500 6,352.50 0.000 0 038 PLACE HOT MIX ASPHALT LF 15.0000 40,950.00 0.000 0 (MISCELLANEOUS AREA) 039 TACK COAT TON 1,300.0000 286,000.00 0.000 0 040 AGGREGATE BASE (APPROACH SLAB) CY 160.0000 27,840.00 0.000 0 041 STRUCTURAL CONCRETE, APPROACH SLAB CY 840.0000 1,470,000.00 0.000 0 (TYPE R) 042 MINOR CONCRETE (MINOR STRUCTURE) CY 1,200.0000 64,800.00 0.000 0 (F) 043 PAVING NOTCH EXTENSION CF 190.0000 223,630.00 0.000 0 044 JOINT SEAL (MR 1/2") LF 63.0000 60,858.00 0.000 0 045 JOINT SEAL (MR 1") LF 64.0000 39,040.00 0.000 0 046 GUARD RAILING DELINEATOR EA 20.0000 24,200.00 0.000 0 047 OBJECT MARKER (TYPE L-2) EA 20.0000 4,400.00 0.000 0 048 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 31.0000 365,800.00 0.000 0 049 TRANSITION RAILING (TYPE WB-31) EA 3,000.0000 108,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/26/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-407004 TIME 08:03 AM ESTIMATE NO. 002 BID OPENING 12/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/15 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/26/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 END ANCHOR ASSEMBLY (TYPE SFT) EA 650.0000 4,550.00 0.000 0 051 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,900.0000 89,900.00 0.000 0 052 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,300.0000 4,600.00 0.000 0 053 PAINT TRAFFIC STRIPE (1-COAT) LF 0.1500 780.00 0.000 0 054 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 91,500.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 055 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,750.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 056 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2300 40,020.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 057 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 7,096.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 058 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 2.8000 4,648.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 059 PAVEMENT MARKER EA 11.0000 86,570.00 0.000 0 (RETROREFLECTIVE-RECESSED) 060 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 6,000.0000 6,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 061 TRAFFIC MONITORING STATION LS 35,000.0000 35,000.00 0.000 0 062 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 063 ASPHALT-RUBBER BINDER TON 1,100.0000 2,123,000.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 05/26/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-407004 TIME 08:03 AM ESTIMATE NO. 002 BID OPENING 12/18/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/15 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/26/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 38,987.50 49,250.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 38,987.50 49,250.00 064 MOBILIZATION LS 3,479,142.2000 3,479,142.20 0.000 0 ORIGINAL CONTRACT AMOUNT 34,885,000.00 TOTAL WORK COMPLETED 38,987.50 49,250.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 38,987.50 49,250.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/18/15 210 04/14/15 04/14/15 02/16/16 27 0 0 0 0% 13% PROGRESS IS SATISFACTORY RIZZUTTO, SHAWN RESIDENT ENGINEER PROGRAM CAS145 DATE 05/26/15