PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/07/19 EST. NO. 007 TIME 02:38 PM R.E. NAME: GHAZIALAM SULTAN 11-415304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0005 382.47 E.W. @ F.A.(+) 093018 N 093018 0007 481.08 102818 N 102818 008 0002 1,993.85 E.W. @ F.A.(+) 110518 N 110518 011 0001 999.72 E.W. @ F.A.(+) 100218 N 100218 3,857.12 TOTAL THIS ESTIMATE 11,786.82 TOTAL PREVIOUS ESTIMATE 15,643.94 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/07/19 EST. NO. 007 TIME 02:38 PM R.E. NAME: GHAZIALAM SULTAN 11-415304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- EQUAL EMPLOYMENT OPPORTUNITY O/S FHWA 1391 -10,000.00 002 RECD O/S FHWA 1391 10,000.00 003 0.00 0.00 LABOR COMPLIANCE VIOLATION DEL JUL 18 CPR -3,000.00 002 DEL AUG 18 CPR -3,000.00 003 DEL SEP 18 CPR -5,000.00 004 PRTL AUG 18 DEL 2,000.00 004 RECD JUL 18 DEL 3,000.00 004 RECD AUG 18 DEL 5,000.00 006 RECD SEP 18 DEL 1,000.00 006 0.00 0.00 OVERBID ITEMS OVERBID ITEM NO. 137 -2,897.97 002 OVERBID ITEM NO. 137 -2,608.17 003 OVERBID ITEM NO. 137 -289.80 004 0.00 -5,795.94 TOTAL DEDUCTIONS 0.00 -5,795.94 PROGRAM CAS145 PAGE 1 DATE 01/07/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-415304 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 11/07/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/18 R.E. NAME: GHAZIALAM SULTAN DATE OF THIS ESTIMATE 01/07/19 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 11-SD-163-2.5/4.0 ------------------------------ WESTERN RIM CONSTRUCTORS, IN SAN DIEGO COUNTY IN SAN DIEGO INC. FROM ROBINSON AVE OVERCROSSING 621 S ANDREASEN DRIVE, SUITE TO SAN DIEGO RIVER BRIDGE. ESCONDIDO CA 92029 FED. AID NO. CSTG-P163(30)E ENHANCE STRIPING, LIGHTING, UPGRADE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.250 1,250.00 0.750 3,750 003 TIME-RELATED OVERHEAD (WDAY) WDAY 2,000.0000 230,000.00 97.000 194,000 004 CONSTRUCTION AREA SIGNS LS 39,000.0000 39,000.00 0.781 30,459 005 TRAFFIC CONTROL SYSTEM LS 323,000.0000 323,000.00 0.439 141,797.00 0.843 272,289 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.0000 2,580.00 2,700.000 2,700 007 TRAFFIC PLASTIC DRUM EA 29.0000 2,117.00 62.000 1,798 008 TEMPORARY PAVEMENT MARKER EA 10.0000 540.00 54.000 540 009 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 4,000.0000 16,000.00 3.374 13,496 010 TEMPORARY RAILING (TYPE K) LF 18.3300 112,179.60 6,120.000 112,179 011 TEMPORARY ZONEGUARD BARRIER SYSTEM EA 69,395.0000 69,395.00 0.000 0 012 TEMPORARY CRASH CUSHION MODULE EA 180.0000 6,300.00 35.000 6,300 013 ALTERNATIVE TEMPORARY CRASH CUSHION EA 2,450.0000 19,600.00 8.000 19,600 014 JOB SITE MANAGEMENT LS 20,100.0000 20,100.00 0.439 8,823.90 0.843 16,944 015 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 0.750 1,875 016 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 7,500.00 12.000 6,000 017 TEMPORARY FIBER ROLL LF 2.9200 7,592.00 2,600.000 7,592 018 TEMPORARY CONSTRUCTION ENTRANCE EA 3,500.0000 7,000.00 2.000 7,000 019 STREET SWEEPING LS 10,000.0000 10,000.00 0.439 4,390.00 0.843 8,430 020 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.843 4,215 021 TREATED WOOD WASTE LB 0.1500 5,130.00 0.000 0 022 REMOVE CONCRETE (LF) LF 107.2000 2,144.00 20.000 2,144 PROGRAM CAS145 PAGE 2 DATE 01/07/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-415304 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 11/07/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/18 R.E. NAME: GHAZIALAM SULTAN DATE OF THIS ESTIMATE 01/07/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEARING AND GRUBBING (LS) LS 10,000.0000 10,000.00 0.439 4,390.00 0.843 8,430 024 ROADWAY EXCAVATION CY 88.3600 24,740.80 280.000 24,740 025 ROADWAY EXCAVATION (TYPE Z-2) CY 233.9400 271,370.40 128.680 30,103.40 1,160.000 271,370 (AERIALLY DEPOSITED LEAD) 026 STRUCTURE EXCAVATION CY 152.8000 2,292.00 15.000 2,292 (F) 027 STRUCTURE BACKFILL CY 118.8600 832.02 7.000 832 (F) 028 IMPORTED BORROW (CY) CY 80.4800 16,900.80 210.000 16,900 029 ROADSIDE CLEARING LS 10,000.0000 10,000.00 0.439 4,390.00 0.843 8,430 030 SLOW-RELEASE FERTILIZER LB 6.0000 1,260.00 0.000 0 031 PLANT (GROUP H) EA 0.5000 15,050.00 0.000 0 (F) 032 PLANT (GROUP K) EA 300.0000 600.00 0.000 0 033 MAINTAIN EXISTING PLANTED AREAS LS 10,000.0000 10,000.00 0.404 4,040 034 PLANT ESTABLISHMENT WORK LS 20,000.0000 20,000.00 0.288 5,760 035 CHECK AND TEST EXISTING IRRIGATION LS 4,000.0000 4,000.00 0.800 3,200 FACILITIES 036 OPERATE EXISTING IRRIGATION FACILITIES LS 2,500.0000 2,500.00 0.404 1,010 037 REMOVE IRRIGATION FACILITY LS 3,500.0000 3,500.00 1.000 3,500 038 CONTROL AND NEUTRAL CONDUCTORS LS 5,000.0000 5,000.00 0.000 0 039 1" REMOTE CONTROL VALVE EA 350.0000 1,400.00 0.000 0 040 1 1/2" REMOTE CONTROL VALVE EA 400.0000 4,400.00 0.000 0 041 2" REMOTE CONTROL VALVE EA 600.0000 1,200.00 0.000 0 042 CERTIFY EXISTING BACKFLOW PREVENTERS LS 12,000.0000 12,000.00 0.000 0 043 TREE WELL SPRINKLER ASSEMBLY EA 60.0000 120.00 0.000 0 044 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 20.0000 640.00 0.000 0 045 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 40.0000 440.00 0.000 0 046 2" GATE VALVE EA 400.0000 2,000.00 0.000 0 047 3" GATE VALVE EA 600.0000 1,200.00 0.000 0 048 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 3.0000 3,810.00 0.000 0 (F) LINE) 049 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 3.2000 480.00 0.000 0 (F) (SUPPLY LINE) PROGRAM CAS145 PAGE 3 DATE 01/07/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-415304 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 11/07/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/18 R.E. NAME: GHAZIALAM SULTAN DATE OF THIS ESTIMATE 01/07/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 3.5000 910.00 0.000 0 (F) (SUPPLY LINE) 051 2" PLASTIC PIPE (SCHEDULE 40) LF 6.0000 2,040.00 0.000 0 (F) (SUPPLY LINE) 052 2" PLASTIC PIPE (CLASS 315) LF 6.0000 300.00 0.000 0 (F) (SUPPLY LINE) 053 3" PLASTIC PIPE (CLASS 315) LF 12.0000 16,320.00 200.000 2,400 (F) (SUPPLY LINE) 054 TEMPORARY IRRIGATION SUPPLY LINE LF 2.5000 3,100.00 620.000 1,550 055 10" CORRUGATED HIGH DENSITY LF 69.2500 3,808.75 47.000 3,254 POLYETHYLENE PIPE CONDUIT 056 DRY SEED (SQFT) SQFT 0.5000 440.00 0.000 0 057 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 2.0000 1,760.00 0.000 0 058 COMPOST (CY) CY 100.0000 550.00 0.000 0 059 INCORPORATE MATERIALS SQFT 0.5000 440.00 0.000 0 060 CLASS 2 AGGREGATE BASE (CY) CY 83.8600 45,284.40 540.000 45,284 061 HIGH FRICTION SURFACE TREATMENT SQYD 20.2200 3,113,880.00 138,166.320 2,793,722 062 REPLACE ASPHALT CONCRETE SURFACING CY 400.0000 23,600.00 53.000 21,200 063 HOT MIX ASPHALT (TYPE A) TON 100.0000 46,000.00 374.560 37,456 064 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 8.0000 4,960.00 0.000 0 065 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 8.0000 3,280.00 0.000 0 066 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 8.0000 2,640.00 0.000 0 067 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 8.0000 2,400.00 0.000 0 068 PLACE HOT MIX ASPHALT SQYD 22.0400 40,994.40 1,293.160 28,501 (MISCELLANEOUS AREA) 069 TACK COAT TON 6,000.0000 3,000.00 0.040 240 070 REMOVE ASPHALT CONCRETE DIKE LF 5.7100 8,051.10 1,400.000 7,994 071 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 247.1300 21,253.18 86.000 21,253 072 STRUCTURAL CONCRETE CY 1,132.4300 26,045.89 25.440 28,809 (F) 073 STRUCTURAL CONCRETE, HEADWALL CY 2,127.6596 10,000.00 0.000 0 (F) 074 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,200.0000 30,000.00 25.000 30,000 (F) 075 MINOR CONCRETE (MINOR STRUCTURE) CY 3,006.2900 42,088.06 13.860 41,667 (F) 076 DRILL AND BOND DOWEL LF 25.1800 5,539.60 220.000 5,539 PROGRAM CAS145 PAGE 4 DATE 01/07/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-415304 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 11/07/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/18 R.E. NAME: GHAZIALAM SULTAN DATE OF THIS ESTIMATE 01/07/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 BAR REINFORCING STEEL LB 1.0500 6,195.00 5,900.000 6,195 (F) 078 24" ALTERNATIVE PIPE CULVERT LF 177.5200 4,438.00 25.000 4,438 079 18" REINFORCED CONCRETE PIPE LF 102.5300 21,531.30 210.000 21,531 080 4" PLASTIC PIPE UNDERDRAIN LF 23.2600 2,558.60 110.000 2,558.60 110.000 2,558 081 GRATED LINE DRAIN LF 230.9700 13,858.20 60.000 13,858 082 36" CORRUGATED STEEL PIPE RISER LF 1,555.5102 7,622.00 4.900 7,622.00 4.900 7,622 (.109" THICK) 083 REMOVE DRAINAGE FACILITY (EA) EA 1,222.0000 1,222.00 1.000 1,222 084 REMOVE CONCRETE (CHANNEL) CY 381.8813 1,222.02 3.200 1,222 085 CAP INLET EA 3,580.0000 3,580.00 1.000 3,580 086 CONCRETE (DITCH LINING) CY 1,378.8000 3,447.00 1.300 1,792.44 1.300 1,792 087 SLOPE PAVING (CONCRETE) CY 1,612.3300 9,673.98 2.500 4,030 088 MINOR CONCRETE (EXPOSED AGGREGATE SQFT 9.1400 27,877.00 3,050.000 27,877 CONCRETE) 089 REMOVE CONCRETE CURB (LF) LF 9.1200 3,465.60 380.000 3,465 090 MISCELLANEOUS IRON AND STEEL LB 1.7400 3,474.78 2,263.000 3,937 (F) 091 REMOVE CHAIN LINK FENCE LF 15.0000 435.00 0.000 0 092 RECONSTRUCT CHAIN LINK FENCE LF 134.0000 2,010.00 0.000 0 093 GUARD RAILING DELINEATOR EA 25.0000 2,375.00 0.000 0 094 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 6,200.00 0.000 0 095 REMOVE ROADSIDE SIGN EA 195.0000 2,730.00 1.000 195 096 FURNISH SINGLE SHEET ALUMINUM SQFT 24.2700 728.10 0.000 0 (0.063" UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 097 FURNISH SINGLE SHEET ALUMINUM SQFT 18.7400 2,623.60 0.000 0 (0.080" UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 098 FURNISH SINGLE SHEET ALUMINUM SQFT 23.2600 1,093.22 0.000 0 (0.063" FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 099 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 7.3900 1,625.80 0.000 0 100 ROADSIDE SIGN - ONE POST EA 365.0000 4,745.00 1.000 365 101 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 195.0000 195.00 0.000 0 METHOD) PROGRAM CAS145 PAGE 5 DATE 01/07/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-415304 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 11/07/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/18 R.E. NAME: GHAZIALAM SULTAN DATE OF THIS ESTIMATE 01/07/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 102 MIDWEST GUARDRAIL SYSTEM LF 34.0000 78,880.00 2,318.750 78,837 103 MIDWEST GUARDRAIL SYSTEM (7' POST) LF 40.0000 7,600.00 187.500 7,500 104 VEGETATION CONTROL (MINOR CONCRETE) SQYD 79.9100 79,910.00 0.000 0 105 SINGLE THRIE BEAM BARRIER LF 64.0000 800.00 0.000 0 106 CABLE RAILING LF 250.0000 2,500.00 0.000 0 (F) 107 TRANSITION RAILING (TYPE STB) EA 2,000.0000 2,000.00 0.000 0 108 TRANSITION RAILING (TYPE WB-31) EA 2,300.0000 9,200.00 3.000 6,900 109 FLARED TERMINAL SYSTEM (TYPE X-TENSION) EA 3,600.0000 10,800.00 3.000 10,800 110 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,600.0000 11,200.00 6.000 9,600 111 TERMINAL SYSTEM (TYPE SOFTSTOP) EA 3,600.0000 10,800.00 3.000 10,800 112 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,500.0000 7,000.00 2.000 7,000 113 CRASH CUSHION (SMART) (TYPE 1) EA 40,610.0000 40,610.00 0.000 0 114 CRASH CUSHION (SMART) (TYPE 2) EA 61,170.0000 61,170.00 0.000 0 115 CONCRETE BARRIER (TYPE 60 MOD 1) LF 190.3300 36,162.70 182.690 34,771 116 CONCRETE BARRIER (TYPE 60 MOD 2) LF 381.4000 1,907.00 0.000 0 117 CONCRETE BARRIER (TYPE 60D MOD 1) LF 212.0100 29,681.40 134.360 28,485 118 CONCRETE BARRIER (TYPE 60D MOD 2) LF 218.1300 28,356.90 0.000 0 119 CONCRETE BARRIER (TYPE 60R) LF 364.6500 182,325.00 496.460 181,034 120 CONCRETE BARRIER (TYPE 60) LF 89.9100 99,800.10 630.350 56,674 121 CONCRETE BARRIER (TYPE 60C) LF 247.2800 13,105.84 0.000 0 122 CONCRETE BARRIER (TYPE 736SV MOD) LF 491.0800 39,286.40 80.000 39,286 (F) 123 REMOVE GUARDRAIL LF 3.5000 10,395.00 2,970.000 10,395 124 REMOVE CONCRETE BARRIER LF 35.3300 24,024.40 680.000 24,024 125 REMOVE CRASH CUSHION EA 2,500.0000 2,500.00 1.000 2,500 126 REMOVE METAL BRIDGE RAILING LF 35.7100 2,499.70 70.000 2,499 127 CONTINUOUS REFLECTIVE MARKING LF 29.2000 21,316.00 0.000 0 (ULTRAGUARD) 128 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 15,000.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) PROGRAM CAS145 PAGE 6 DATE 01/07/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-415304 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 11/07/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/18 R.E. NAME: GHAZIALAM SULTAN DATE OF THIS ESTIMATE 01/07/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 129 PAINT TRAFFIC STRIPE (1-COAT) LF 0.3000 3,750.00 0.000 0 130 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6600 24,684.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 131 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 9,900.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 132 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 4,184.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 133 REMOVE PAINTED TRAFFIC STRIPE LF 0.3500 3,269.00 0.000 0 134 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 26,360.00 65,900.000 26,360 135 SUBSURFACE LOCATOR LS 4,800.0000 4,800.00 1.000 4,800 136 MODIFYING EXISTING ELECTRICAL SYSTEM LS 405,000.0000 405,000.00 0.658 266,490 PROGRAM CAS145 PAGE 7 DATE 01/07/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-415304 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 11/07/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/18 R.E. NAME: GHAZIALAM SULTAN DATE OF THIS ESTIMATE 01/07/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 207,117.34 5,048,339.86 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 3,857.12 15,643.94 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 210,974.46 5,063,983.80 137 MOBILIZATION LS 698,418.0000 698,418.00 1.000 698,418 ORIGINAL CONTRACT AMOUNT 6,926,220.64 TOTAL WORK COMPLETED 210,974.46 5,762,401.80 MATERIALS ON HAND ON SITE 63,717.96 DEDUCTIONS 0.00 -5,795.94 TOTAL 210,974.46 5,820,323.82 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 137 MOBILIZATION 692,622.06 698,418.00 5,795.94 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/09/18 240 04/09/18 04/09/18 06/26/19 97 81 0 0 82% 40% PROGRESS IS SATISFACTORY GHAZIALAM SULTAN RESIDENT ENGINEER PROGRAM CAS145 DATE 01/07/19