PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/22/17 EST. NO. 002 TIME 04:16 PM R.E. NAME: ROSAL PURISIMO 11-419114 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/22/17 EST. NO. 002 TIME 04:16 PM R.E. NAME: ROSAL PURISIMO 11-419114 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION DEL NOV 17 CPR -5,000.00 002 -5,000.00 -5,000.00 TOTAL DEDUCTIONS -5,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 12/22/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-419114 TIME 04:16 PM ESTIMATE NO. 002 BID OPENING 05/11/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/17 R.E. NAME: ROSAL PURISIMO DATE OF THIS ESTIMATE 12/22/17 LOCATION PROGRESS ESTIMATE 11-SD-5-0.3/72.4 ----------------- BC TRAFFIC SPECIALIST IN SAN DIEGO COUNTY AT VARIOUS 638 W SOUTHERN AVE LOCATIONS ORANGE CA 92865 FED. AID NO. N O N E OVERHEAD SIGN REPLACEMENT SOUTH ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 18,000.0000 18,000.00 0.250 4,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 450.0000 135,000.00 16.000 7,200.00 48.000 21,600 003 CONSTRUCTION AREA SIGNS LS 30,409.0000 30,409.00 0.053 1,611.68 0.160 4,865 004 TRAFFIC CONTROL SYSTEM LS 450,000.0000 450,000.00 0.053 23,850.00 0.160 72,000 005 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 900.0000 18,000.00 2.000 1,800.00 4.000 3,600 006 JOB SITE MANAGEMENT LS 90,000.0000 90,000.00 0.053 4,770.00 0.160 14,400 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,350.0000 1,350.00 0.750 1,012 008 DISPOSING OF ELECTRICAL EQUIPMENT LS 9,000.0000 9,000.00 0.053 477.00 0.160 1,440 CONTAINING HAZARDOUS MATERIALS 009 REMOVE SIGN STRUCTURE WALKWAY (EA) EA 275.0000 112,750.00 3.000 825.00 22.000 6,050 010 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.8500 96,515.00 0.000 0 011 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 12.0000 490,800.00 3,690.000 44,280.00 5,900.000 70,800 FOR RETROREFLECTIVE SHEETING (TYPE XI) 012 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 20.0000 2,240,000.00 150.000 3,000.00 17,959.000 359,180 FOR RETROREFLECTIVE SHEETING (TYPE XI) 013 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.0000 612,000.00 3,840.000 15,360.00 23,859.000 95,436 014 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 3.1200 477,360.00 3,161.670 9,864.41 5,850.000 18,252 015 THERMOPLASTIC PAVEMENT MARKING SQFT 14.5000 104,400.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 016 MODIFYING EXISTING ELECTRICAL SYSTEM LS 2,114,280.0000 2,114,280.00 0.010 21,142.80 0.020 42,285 PROGRAM CAS145 PAGE 2 DATE 12/22/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-419114 TIME 04:16 PM ESTIMATE NO. 002 BID OPENING 05/11/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/17 R.E. NAME: ROSAL PURISIMO DATE OF THIS ESTIMATE 12/22/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 134,180.89 715,421.54 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 134,180.89 715,421.54 017 MOBILIZATION LS 100,000.0000 100,000.00 0.250 25,000.00 0.750 75,000 ORIGINAL CONTRACT AMOUNT 7,099,864.00 TOTAL WORK COMPLETED 159,180.89 790,421.54 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -5,000.00 -5,000.00 TOTAL 154,180.89 785,421.54 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/09/17 300 10/03/17 10/03/17 12/26/18 48 5 0 0 11% 16% PROGRESS IS SATISFACTORY ROSAL PURISIMO RESIDENT ENGINEER PROGRAM CAS145 DATE 12/22/17