PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/18/23 EST. NO. 001 TIME 09:17 PM R.E. NAME: GENARO GENEL 11-426504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/18/23 EST. NO. 001 TIME 09:17 PM R.E. NAME: GENARO GENEL 11-426504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-426504 TIME 09:17 PM ESTIMATE NO. 001 BID OPENING 02/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: GENARO GENEL DATE OF THIS ESTIMATE 08/18/23 LOCATION PROGRESS ESTIMATE 11-SD-5-R30.0/R34.3 ----------------- MONTANO PIPELINE INC SAN DIEGO COUNTY IN SAN DIEGO FROM 0.4 231 FOURTH AVE MILE SOUTH OF SORRENTO VIADUCT TO 0.2 MILE CHULA VISTA CA 91910 NORTH OF DEL MAR HEIGHTS ROAD OVERCROSSING FED. AID NO. N O N E CONSTRUCT BIKE PATH, HMA, FIBER OPTIC, LAN ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 5,000.0000 5,000.00 0.100 500.00 0.100 500 003 TIME-RELATED OVERHEAD (WDAY) WDAY 2,500.0000 387,500.00 0.000 0 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 1.000 200.00 1.000 200 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 10,000.0000 10,000.00 0.000 0 007 CONSTRUCTION AREA SIGNS LS 65,000.0000 65,000.00 0.000 0 008 TRAFFIC CONTROL SYSTEM LS 370,000.0000 370,000.00 0.000 0 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 400.0000 22,000.00 0.000 0 010 TEMPORARY TRAFFIC STRIPE (PAINT) LF 4.5000 1,620.00 0.000 0 011 PLASTIC TRAFFIC DRUMS EA 110.0000 660.00 0.000 0 012 PORTABLE RADAR SPEED FEEDBACK SIGN EA 50.0000 8,000.00 0.000 0 SYSTEM DAY 013 TEMPORARY BARRIER SYSTEM LF 45.0000 21,600.00 0.000 0 014 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 3,500.0000 45,500.00 0.000 0 015 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 10,000.0000 10,000.00 0.000 0 016 JOB SITE MANAGEMENT LS 40,000.0000 40,000.00 0.000 0 017 PREPARE STORM WATER POLLUTION PREVENTION LS 2,500.0000 2,500.00 0.000 0 PLAN 018 RAIN EVENT ACTION PLAN EA 500.0000 11,500.00 0.000 0 019 STORM WATER SAMPLING AND ANALYSIS DAY EA 600.0000 4,800.00 0.000 0 020 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 021 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 2.0000 5,760.00 0.000 0 MATRIX) 022 TEMPORARY DRAINAGE INLET PROTECTION EA 114.0000 25,080.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-426504 TIME 09:17 PM ESTIMATE NO. 001 BID OPENING 02/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: GENARO GENEL DATE OF THIS ESTIMATE 08/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY FIBER ROLL LF 5.0000 23,000.00 0.000 0 024 TEMPORARY CONSTRUCTION ENTRANCE EA 5,000.0000 20,000.00 0.000 0 025 STREET SWEEPING LS 30,000.0000 30,000.00 0.000 0 026 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.000 0 027 MANAGE SOLID WASTE GENERATED BY THE HR 190.0000 123,500.00 0.000 0 PUBLIC 028 TREATED WOOD WASTE LB 0.5000 2,005.00 0.000 0 029 TEMPORARY PROTECTION FENCE (ROPE) LF 5.0000 6,800.00 0.000 0 030 CLEARING AND GRUBBING (ACRE) ACRE 25,000.0000 45,000.00 0.000 0 031 ROADWAY EXCAVATION CY 63.0000 265,860.00 0.000 0 032 ROADSIDE CLEARING LS 25,000.0000 25,000.00 0.000 0 033 ROADSIDE CLEARING (BIKE PATH) LS 1,000.0000 1,000.00 0.000 0 034 ROCK BLANKET SQFT 25.0000 25,250.00 0.000 0 035 WEED GERMINATION SQYD 0.1900 2,261.00 0.000 0 036 IRON SULFATE (LB) LB 1.4000 2,744.00 0.000 0 037 PACKET FERTILIZER EA 0.3000 2,376.00 0.000 0 038 PLANT (GROUP I) EA 9.4000 8,366.00 0.000 0 039 PLANT (GROUP A) EA 10.9000 85,020.00 0.000 0 040 PLANT (GROUP U) EA 170.0000 6,800.00 0.000 0 041 INSTALL PLANT (GROUP H) EA 4.4000 990.00 0.000 0 042 PLANT ESTABLISHMENT WORK LS 68,200.0000 68,200.00 0.000 0 043 WOOD MULCH CY 100.0000 42,000.00 0.000 0 044 CHECK AND TEST EXISTING IRRIGATION LS 4,170.0000 4,170.00 0.000 0 FACILITIES 045 REMOVE IRRIGATION FACILITY LS 2,460.0000 2,460.00 0.000 0 046 CONTROL AND NEUTRAL CONDUCTORS LS 15,500.0000 15,500.00 0.000 0 047 1 1/2" REMOTE CONTROL VALVE EA 740.0000 9,620.00 0.000 0 048 TRUCK WATERING LS 16,900.0000 16,900.00 0.000 0 049 TREE WELL SPRINKLER ASSEMBLY EA 50.1000 2,004.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-426504 TIME 09:17 PM ESTIMATE NO. 001 BID OPENING 02/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: GENARO GENEL DATE OF THIS ESTIMATE 08/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 56.8000 1,420.00 0.000 0 051 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 100.0000 6,800.00 0.000 0 052 2" GATE VALVE EA 630.0000 3,150.00 0.000 0 053 3" GATE VALVE EA 1,700.0000 1,700.00 0.000 0 054 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 5.0000 7,225.00 0.000 0 (F) LINE) 055 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 5.7000 10,317.00 0.000 0 (F) (SUPPLY LINE) 056 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 6.1000 4,697.00 0.000 0 (F) (SUPPLY LINE) 057 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 7.0000 2,695.00 0.000 0 (F) LINE) 058 2 1/2" PLASTIC PIPE (SCHEDULE 40) LF 9.0000 7,785.00 0.000 0 (F) (SUPPLY LINE) 059 3" PLASTIC PIPE (CLASS 315) (SUPPLY LF 13.4000 22,914.00 0.000 0 (F) LINE) 060 DRY SEED (SQFT) SQFT 0.3000 2,334.00 0.000 0 061 HYDROMULCH SQFT 0.0500 6,100.00 0.000 0 062 COMPOST SOCK LF 10.7000 10,700.00 0.000 0 063 HYDROSEED SQFT 0.1400 17,080.00 0.000 0 064 COMPOST (CY) CY 51.0000 17,340.00 0.000 0 065 INCORPORATE MATERIALS SQFT 0.1600 4,512.00 0.000 0 066 CLASS 2 AGGREGATE BASE (CY) CY 140.0000 28,000.00 0.000 0 067 PERMEABLE AGGREGATE BASE (BICYCLE PATH) CY 190.0000 36,100.00 0.000 0 068 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,000.0000 13,000.00 0.000 0 069 HOT MIX ASPHALT (TYPE A) TON 210.0000 161,700.00 0.000 0 070 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 17.0000 7,480.00 0.000 0 071 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 12.0000 4,920.00 0.000 0 AREA) 072 TACK COAT TON 10,000.0000 10,000.00 0.000 0 073 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 150.0000 4,050.00 0.000 0 074 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 12.0000 36,480.00 0.000 0 075 STRUCTURAL CONCRETE, HEADWALL CY 2,000.0000 16,000.00 0.000 0 (F) 076 MINOR CONCRETE CY 400.0000 36,400.00 0.000 0 (F) PROGRAM CAS145 PAGE 4 DATE 08/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-426504 TIME 09:17 PM ESTIMATE NO. 001 BID OPENING 02/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: GENARO GENEL DATE OF THIS ESTIMATE 08/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 MINOR CONCRETE (MINOR STRUCTURE) CY 400.0000 11,600.00 0.000 0 (F) 078 BAR REINFORCING STEEL (EPOXY COATED) LB 4.0000 37,532.00 0.000 0 (F) 079 3" PLASTIC PIPE UNDERDRAIN LF 8.0000 400.00 0.000 0 080 REMOVE CULVERT (LF) LF 140.0000 980.00 0.000 0 081 REMOVE HEADWALL EA 1,600.0000 1,600.00 0.000 0 082 REMOVE ROCK SLOPE PROTECTION CY 110.0000 2,530.00 0.000 0 083 SLOPE PAVING (ROCK COBBLE) CY 1,000.0000 173,000.00 0.000 0 084 ROCK SLOPE PROTECTION (20 LB, CLASS I, CY 275.0000 14,025.00 0.000 0 METHOD B) (CY) 085 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 4.0000 5,880.00 0.000 0 086 PREPARE AND PAINT CONCRETE SQFT 1.5000 1,500.00 0.000 0 087 LODGE POLE FENCE LF 50.0000 40,500.00 0.000 0 088 TEMPORARY FENCE (TYPE CL-6) LF 7.0000 2,520.00 0.000 0 089 CHAIN LINK FENCE (TYPE CL-6) LF 45.0000 18,900.00 0.000 0 090 REMOVE CHAIN LINK FENCE LF 6.0000 2,580.00 0.000 0 091 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 8,000.00 0.000 0 092 CONCRETE BARRIER MARKER EA 25.0000 1,350.00 0.000 0 093 REMOVE ROADSIDE SIGN EA 125.0000 2,125.00 0.000 0 094 REMOVE ROADSIDE SIGN (STRAP AND SADDLE EA 100.0000 1,500.00 0.000 0 BRACKET METHOD) 095 RELOCATE ROADSIDE SIGN EA 650.0000 650.00 0.000 0 096 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.0000 11,050.00 0.000 0 (0.063"-UNFRAMED) 097 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 3,190.00 0.000 0 (0.080"-UNFRAMED) 098 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 35.0000 1,050.00 0.000 0 (0.063"-FRAMED) 099 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 23.0000 1,380.00 0.000 0 (0.080"-FRAMED) 100 METAL (ROADSIDE SIGN) LB 16.0000 1,920.00 0.000 0 101 ROADSIDE SIGN - ONE POST EA 480.0000 28,800.00 0.000 0 102 ROADSIDE SIGN - TWO POST EA 1,500.0000 3,000.00 0.000 0 103 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 200.0000 4,800.00 0.000 0 METHOD) PROGRAM CAS145 PAGE 5 DATE 08/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-426504 TIME 09:17 PM ESTIMATE NO. 001 BID OPENING 02/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: GENARO GENEL DATE OF THIS ESTIMATE 08/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 INSTALL SIGN (MAST-ARM METHOD) EA 400.0000 800.00 0.000 0 105 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 350.0000 350.00 0.000 0 POST 106 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,100.0000 4,200.00 0.000 0 107 REMOVE GUARDRAIL LF 13.0000 2,600.00 0.000 0 108 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 4.8000 36,672.00 0.000 0 WET NIGHT VISIBILITY) 109 PREFORMED THERMOPLASTIC PAVEMENT MARKING SQFT 13.5000 28,620.00 0.000 0 110 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 1,170.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 111 6" THERMOPLASTIC TRAFFIC STRIPE LF 5.0000 4,500.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 9-3) 112 PAINT PAVEMENT MARKING (2-COAT) SQFT 2.1500 29,670.00 0.000 0 113 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.6000 8,016.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 114 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.3000 2,990.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 115 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 2,480.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 116 12" THERMOPLASTIC TRAFFIC STRIPE LF 2.9000 39,440.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 117 6" AUDIBLE TRAFFIC STRIPE SYSTEMS LF 3.4000 124,100.00 0.000 0 118 REMOVE PAINTED TRAFFIC STRIPE LF 0.4500 22,500.00 0.000 0 119 REMOVE PAINTED PAVEMENT MARKING SQFT 2.0000 194.00 0.000 0 120 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4700 27,683.00 0.000 0 121 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.2000 3,872.00 0.000 0 122 12" RUMBLE STRIP (ASPHALT CONCRETE STA 200.0000 72,000.00 0.000 0 PAVEMENT) 123 CONTRAST STRIPE PAINT (2-COAT) LF 0.4000 20,760.00 0.000 0 124 LIGHTING (BIKE FACILITY) LS 232,300.0000 232,300.00 0.000 0 125 TRAFFIC MONITORING STATION SYSTEM LS 25,250.0000 25,250.00 0.000 0 126 CAMERA SYSTEMS LS 242,400.0000 242,400.00 0.000 0 127 FIBER OPTIC CABLE SYSTEMS LS 1,242,300.0000 1,242,300.00 0.000 0 128 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 202,000.0000 202,000.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 08/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-426504 TIME 09:17 PM ESTIMATE NO. 001 BID OPENING 02/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: GENARO GENEL DATE OF THIS ESTIMATE 08/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 129 MODIFYING RAMP METERING SYSTEMS LS 65,650.0000 65,650.00 0.000 0 130 MODIFYING TRAFFIC MONITORING STATIONS LS 90,900.0000 90,900.00 0.000 0 131 SUBSURFACE LOCATORS LS 202,000.0000 202,000.00 0.721 145,642.00 0.721 145,642 PROGRAM CAS145 PAGE 7 DATE 08/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-426504 TIME 09:17 PM ESTIMATE NO. 001 BID OPENING 02/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: GENARO GENEL DATE OF THIS ESTIMATE 08/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 151,342.00 151,342.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 151,342.00 151,342.00 132 MOBILIZATION LS 600,000.0000 600,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 6,096,024.00 TOTAL WORK COMPLETED 151,342.00 151,342.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 151,342.00 151,342.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/25/23 405 08/03/23 08/03/23 04/03/25 0 12 0 0 2% 0% PROGRESS IS SATISFACTORY GENARO GENEL RESIDENT ENGINEER