PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/23/22 EST. NO. 006 TIME 02:32 PM R.E. NAME: GARY LEVINE 11-430564 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 1,139.67 E.W. @ F.A.(+) 080722 N 0002 0 0003 3,200.52 090122 N 932536 0004 3,051.76 082922 N 932538 0005 2,818.89 072822 N 932539 0006 1,546.12 092822 N 008 0 0007 1,932.62 092922 N 028 0 0008 7,508.62 111522 N 032 0 004 0004 300.00 E.W. @ F.A.(+) 110422 N 936702 005 0003 46,375.00 E.W. @ L.S.(+) 111522 N 0003 0 012 0003 2,804.48 E.W. @ F.A.(+) 100222 N 12-001 0004 4,566.14 100322 N 12-002 0005 7,356.71 100422 N 12-003 0006 7,356.71 100522 N 12-004 0008 7,324.05 100922 N 12-006 0009 7,360.52 101022 N 12-007 0010 7,360.52 101222 N 12-009 0011 7,360.52 101322 N 12-010 0012 7,360.52 101622 N 12-011 0013 7,360.52 101722 N 12-012 0014 1,220.76 090822 N 005 0 0014-1 -1,220.76 090822 N 005 0 DAO CORRECTING ENTRY 0014-2 1,199.67 090822 N 005 0 DAO CORRECTING ENTRY 0015 785.64 091122 N 006 0 0016 3,452.03 092522 N 007 0 0017 649.30 100222 N 009 0 0018 4,016.76 100322 N 010 0 0019 6,731.98 100422 N 011 0 0020 6,235.94 100522 N 012 0 0021 5,872.47 100622 N 013 0 0022 13,175.51 100922 N 014 0 0023 5,315.63 101022 N 015 0 0024 12,853.54 101122 N 016 0 0025 12,853.54 101222 N 017 0 0026 12,543.87 101322 N 018 0 0027 6,489.49 101722 N 019 0 0028 6,756.23 101922 N 020 0 0029 6,900.40 102322 N 021 0 0030 6,318.26 102422 N 022 0 0031 5,520.66 102522 N 023 0 0032 5,680.31 102622 N 024 0 0033 6,765.50 103022 N 025 0 0034 6,489.49 110122 N 026 0 0035 3,478.72 090622 N 027 0 0046 5,974.52 110322 N 029 0 0047 6,147.41 110922 N 030 0 0048 6,536.60 111422 N 031 0 0049 5,974.52 112022 N 033 0 298,801.88 TOTAL THIS ESTIMATE 222,173.27 TOTAL PREVIOUS ESTIMATE 520,975.15 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/23/22 EST. NO. 006 TIME 02:32 PM R.E. NAME: GARY LEVINE 11-430564 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 02:32 PM ESTIMATE NO. 006 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 11/23/22 LOCATION PROGRESS ESTIMATE 11-SD-67-R6.0/24.4 ----------------- HANSON AGGREGATES PACIFIC IN SAN DIEGO COUNTY NEAR LAKESIDE SOUTHWEST LLC. DBA ATP GENERAL AND RAMONA FROM 0.2 MILE NORTH OF ENGINEERING CONTRAC SAN DIEGO RIVER BRIDGE TO ROUTE 78 4211 PONDEROSA AVENUE, STE C; JUNCTION SAN DIEGO CA 92123 FED. AID NO. N O N E RUBBERIZED HOT MIX ASPHALT (RHMA) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 20,000.0000 20,000.00 0.250 5,000 003 TIME-RELATED OVERHEAD (LS) LS 1,001,922.0000 1,001,922.00 0.040 40,076.88 0.291 291,559 004 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 48,000.00 1.000 6,000.00 2.000 12,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 4,000.00 6.000 1,200.00 8.000 1,600 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 33,000.0000 33,000.00 0.700 23,100 007 TRAFFIC CONTROL SYSTEM LS 1,830,666.0000 1,830,666.00 0.040 73,226.64 0.290 530,893 008 CENTERLINE CHANNELIZER EA 147.0000 799,680.00 0.000 0 (TYPE CITY POST) (LEFT IN PLACE) 009 REMOVE CENTERLINE CHANNELIZER EA 2.3000 12,512.00 0.000 0 010 PLASTIC TRAFFIC DRUMS EA 50.0000 600.00 12.000 600 011 PORTABLE RADAR SPEED FEEDBACK SIGN EA 125.0000 65,000.00 -11.000 -1,375.00 49.000 6,125 SYSTEM DAY 012 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 7,500.0000 90,000.00 3.000 22,500 013 TEMPORARY RAILING (TYPE K) LF 48.0000 22,080.00 460.000 22,080 014 ALTERNATIVE TEMPORARY CRASH EA 2,000.0000 4,000.00 2.000 4,000 CUSHION 015 TEMPORARY RADAR SPEED FEEDBACK EA 5,000.0000 20,000.00 2.000 10,000 SIGN SYSTEM 016 AUTOMATED FLAGGER ASSISTANCE DEVICE EA 110.0000 27,500.00 2.000 220.00 28.000 3,080 DAY 017 JOB SITE MANAGEMENT LS 37,500.0000 37,500.00 0.120 4,500.00 0.310 11,625 018 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.500 2,500 019 TEMPORARY DRAINAGE INLET PROTECTION EA 125.0000 16,250.00 0.000 0 020 STREET SWEEPING LS 75,000.0000 75,000.00 0.000 0 021 TEMPORARY CONCRETE WASHOUT LS 7,000.0000 7,000.00 1.000 7,000.00 1.000 7,000 022 MANAGE SOLID WASTE GENERATED HR 200.0000 56,000.00 32.000 6,400.00 96.000 19,200 BY THE PUBLIC PROGRAM CAS145 PAGE 2 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 02:32 PM ESTIMATE NO. 006 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 11/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.3000 69,300.00 101,300.000 30,390.00 101,300.000 30,390 024 REMOVE CONCRETE (CY) CY 450.0000 121,500.00 72.950 32,827 025 ROADWAY EXCAVATION (TYPE Z-2) CY 325.0000 123,500.00 0.000 0 (AERIALLY DEPOSITED LEAD) 026 IMPORTED BORROW (CY) CY 290.0000 60,900.00 0.000 0 027 ROCK BLANKET SQFT 51.7500 20,700.00 0.000 0 028 ASPHALT-RUBBER BINDER TON 1,200.0000 1,200,000.00 0.000 0 029 HIGH FRICTION SURFACE TREATMENT SQYD 21.5000 2,029,600.00 0.000 0 030 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,000.0000 61,000.00 0.000 0 031 PRECOATED AGGREGATE (SEAL COAT) TON 215.0000 1,709,250.00 0.000 0 032 HOT MIX ASPHALT (TYPE A) TON 120.0000 213,600.00 23.450 2,814 033 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 110.0000 8,635,000.00 0.000 0 034 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.3500 1,579.50 0.000 0 035 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.3500 1,660.50 0.000 0 036 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 1.5500 7,858.50 0.000 0 037 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.3500 67,500.00 0.000 0 038 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.3500 11,097.00 0.000 0 039 PLACE HOT MIX ASPHALT SQYD 133.0000 8,379.00 49.810 6,624 (MISCELLANEOUS AREA) 040 TACK COAT TON 700.0000 84,000.00 0.000 0 041 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 310.0000 29,140.00 7.830 2,427 042 REMOVE ASPHALT CONCRETE DIKE LF 1.0000 65,700.00 0.000 0 043 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.4000 1,509,600.00 0.000 0 044 DRILL AND BOND (DOWEL BAR) EA 97.0000 4,268.00 44.000 4,268 045 MINOR CONCRETE (MINOR STRUCTURE) CY 6,800.0000 12,920.00 0.180 1,224.00 1.900 12,920 (F) 046 CULVERT SLURRY-CEMENT BACKFILL CY 215.0000 3,870.00 0.000 0 047 DETECTABLE WARNING SURFACE SQFT 35.2500 46,177.50 0.000 0 048 MINOR CONCRETE (CURB, SIDEWALK AND CY 870.0000 261,000.00 87.460 76,090 CURB RAMP) 049 GRIND CONCRETE CURB RAMP SQFT 84.0000 3,528.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 02:32 PM ESTIMATE NO. 006 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 11/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PRE/POST CONSTRUCTION SURVEYS EA 790.0000 37,920.00 9.000 7,110 051 ADJUST ACCESS BOX FRAME AND COVER EA 300.0000 600.00 0.000 0 (UTILITY) 052 GUARD RAILING DELINEATOR EA 24.0000 15,120.00 200.000 4,800.00 598.000 14,352 053 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.6500 33,920.00 0.000 0 054 REMOVE ROADSIDE SIGN EA 50.0000 200.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 055 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 5,610.00 0.000 0 (0.063"-UNFRAMED) 056 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.5000 7,130.00 0.000 0 (0.080"-UNFRAMED) 057 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 19.0000 684.00 0.000 0 (0.063"-FRAMED) 058 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 96.0000 960.00 0.000 0 METHOD) 059 INSTALL ROADSIDE SIGN PANEL ON EA 96.0000 10,560.00 0.000 0 EXISTING POST 060 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 39.5000 282,030.00 5,988.000 236,526 061 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 21.3500 17,934.00 600.000 12,810 062 MIDWEST GUARDRAIL SYSTEM LF 53.9000 349,811.00 1,607.000 86,617 (STEEL POST) (EMBEDDED IN ROCK) 063 MIDWEST GUARDRAIL SYSTEM LF 69.2500 56,785.00 1,315.000 91,063 (8' STEEL POST) (EMBEDDED IN ROCK) 064 TRANSITION RAILING (TYPE WB-31) EA 4,520.0000 9,040.00 0.000 0 065 END ANCHOR ASSEMBLY (TYPE SFT) EA 975.0000 3,900.00 12.000 11,700 066 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,190.0000 226,260.00 38.000 159,220 067 REMOVE GUARDRAIL LF 7.1500 107,250.00 2,059.000 14,721.85 14,102.250 100,831 068 PAINT TRAFFIC STRIPE (1-COAT) LF 0.2000 21,200.00 0.000 0 069 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 257,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 070 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 23,750.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 071 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 3.2500 72,800.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 072 6" AUDIBLE TRAFFIC STRIPE SYSTEMS LF 1.4000 138,460.00 0.000 0 073 12" RUMBLE STRIP STA 50.0000 40,500.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 074 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.4000 200,160.00 0.000 0 (WARRANTY) (BROKEN 36-12) 075 SUBSURFACE LOCATOR LS 194,946.0000 194,946.00 0.295 57,509.07 0.579 112,873 076 FIBER OPTIC CABLE SYSTEMS LS 6,245,915.0000 6,245,915.00 0.131 818,214.87 0.150 936,887 PROGRAM CAS145 PAGE 4 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 02:32 PM ESTIMATE NO. 006 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 11/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 MODIFYING CENSUS STATION SYSTEM LS 33,036.0000 33,036.00 0.000 0 078 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 1,002,257.0000 1,002,257.00 0.276 276,622 079 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 080 SHOULDER BACKING TON 76.0000 40,280.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 02:32 PM ESTIMATE NO. 006 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 11/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,064,108.31 3,189,038.22 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 298,801.88 520,975.15 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,362,910.19 3,710,013.37 081 MOBILIZATION LS 2,804,900.0000 2,804,900.00 0.750 2,103,675 ORIGINAL CONTRACT AMOUNT 32,781,056.00 TOTAL WORK COMPLETED 1,362,910.19 5,813,688.37 MATERIALS ON HAND ON SITE 39,082.29 1,173,832.30 DEDUCTIONS 0.00 0.00 TOTAL 1,401,992.48 6,987,520.67 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/21/22 350 06/15/22 06/15/22 11/21/23 101 8 0 0 17% 29% PROGRESS IS SATISFACTORY GARY LEVINE RESIDENT ENGINEER