PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/19/23 EST. NO. 012 TIME 06:34 PM R.E. NAME: GARY LEVINE 11-430564 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0064 23,904.08 E.W. @ F.A.(+) 031323 N 127 0 0065 22,628.56 030923 N 0125.0 0066 13,676.60 030923 N 0126.0 0067 14,840.28 031323 N 0128.0 0068 9,271.01 032023 N 0129.0 0069 6,645.96 032623 N 0131.0 0070 1,554.51 032823 N 0132.0 0071 1,704.16 040423 N 0133.0 002 0001 -5,011.39 A.C. @ U.P.(-) 051623 N 0001 0 004 0011 300.00 E.W. @ F.A.(+) 043023 N 992270 0012 2,750.00 050423 N 993823 006 0008 5,622.24 E.W. @ F.A.(+) 021023 N 0111.0 0009 6,265.24 021323 N 0112.0 0010 5,739.51 021523 N 0113.0 0011 7,605.17 021623 N 0114.0 0012 9,005.54 022723 N 0115.0 0013 12,896.08 022823 N 0116.0 0014 12,539.35 030223 N 0117.0 0015 4,568.45 030323 N 0118.0 0019 950,000.00 E.W. @ L.S.(+) 051623 N 0019 0 0020 7,004.00 E.W. @ U.P (+) 042123 N 0020 0 014 0001 4,715.76 E.W. @ F.A.(+) 032723 N 001 0 0003 7,127.91 030523 N 107.10 0004 14,664.26 030523 N 108.10 1,140,017.28 TOTAL THIS ESTIMATE 1,884,458.16 TOTAL PREVIOUS ESTIMATE 3,024,475.44 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/19/23 EST. NO. 012 TIME 06:34 PM R.E. NAME: GARY LEVINE 11-430564 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 06:34 PM ESTIMATE NO. 012 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/23 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 05/19/23 LOCATION PROGRESS ESTIMATE 11-SD-67-R6.0/24.4 ----------------- HANSON AGGREGATES PACIFIC IN SAN DIEGO COUNTY NEAR LAKESIDE SOUTHWEST LLC. DBA ATP GENERAL AND RAMONA FROM 0.2 MILE NORTH OF ENGINEERING CONTRAC SAN DIEGO RIVER BRIDGE TO ROUTE 78 4211 PONDEROSA AVENUE, STE C; JUNCTION SAN DIEGO CA 92123 FED. AID NO. N O N E RUBBERIZED HOT MIX ASPHALT (RHMA) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 20,000.0000 20,000.00 0.500 10,000 003 TIME-RELATED OVERHEAD (LS) LS 1,001,922.0000 1,001,922.00 0.032 32,061.50 0.526 527,010 004 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 48,000.00 1.000 6,000.00 4.000 24,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 4,000.00 10.000 2,000 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 33,000.0000 33,000.00 0.700 23,100 007 TRAFFIC CONTROL SYSTEM LS 1,830,666.0000 1,830,666.00 0.032 58,581.31 0.526 962,930 008 CENTERLINE CHANNELIZER EA 147.0000 799,680.00 0.000 0 (TYPE CITY POST) (LEFT IN PLACE) 009 REMOVE CENTERLINE CHANNELIZER EA 2.3000 12,512.00 2,205.000 5,071 010 PLASTIC TRAFFIC DRUMS EA 50.0000 600.00 12.000 600 011 PORTABLE RADAR SPEED FEEDBACK SIGN EA 125.0000 65,000.00 1.000 125.00 139.000 17,375 SYSTEM DAY 012 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 7,500.0000 90,000.00 4.000 30,000 013 TEMPORARY RAILING (TYPE K) LF 48.0000 22,080.00 460.000 22,080 014 ALTERNATIVE TEMPORARY CRASH EA 2,000.0000 4,000.00 2.000 4,000 CUSHION 015 TEMPORARY RADAR SPEED FEEDBACK EA 5,000.0000 20,000.00 3.000 15,000 SIGN SYSTEM 016 AUTOMATED FLAGGER ASSISTANCE DEVICE EA 110.0000 27,500.00 44.000 4,840.00 128.000 14,080 DAY 017 JOB SITE MANAGEMENT LS 37,500.0000 37,500.00 0.032 1,200.00 0.526 19,725 018 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.500 2,500 019 TEMPORARY DRAINAGE INLET PROTECTION EA 125.0000 16,250.00 0.000 0 020 STREET SWEEPING LS 75,000.0000 75,000.00 0.000 0 021 TEMPORARY CONCRETE WASHOUT LS 7,000.0000 7,000.00 1.000 7,000 022 MANAGE SOLID WASTE GENERATED HR 200.0000 56,000.00 16.000 3,200.00 136.000 27,200 BY THE PUBLIC PROGRAM CAS145 PAGE 2 DATE 05/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 06:34 PM ESTIMATE NO. 012 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/23 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 05/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.3000 69,300.00 121,140.000 36,342 024 REMOVE CONCRETE (CY) CY 450.0000 121,500.00 48.685 21,908.25 198.355 89,259 025 ROADWAY EXCAVATION (TYPE Z-2) CY 325.0000 123,500.00 16.810 5,463.25 41.670 13,542 (AERIALLY DEPOSITED LEAD) 026 IMPORTED BORROW (CY) CY 290.0000 60,900.00 0.000 0 027 ROCK BLANKET SQFT 51.7500 20,700.00 0.000 0 028 ASPHALT-RUBBER BINDER TON 1,200.0000 1,200,000.00 163.680 196,416.00 163.680 196,416 029 HIGH FRICTION SURFACE TREATMENT SQYD 21.5000 2,029,600.00 0.000 0 030 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,000.0000 61,000.00 0.000 0 031 PRECOATED AGGREGATE (SEAL COAT) TON 215.0000 1,709,250.00 1,261.050 271,125.75 1,261.050 271,125 032 HOT MIX ASPHALT (TYPE A) TON 120.0000 213,600.00 23.450 2,814 033 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 110.0000 8,635,000.00 8,974.950 987,244.50 8,974.950 987,244 034 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.3500 1,579.50 0.000 0 035 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.3500 1,660.50 0.000 0 036 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 1.5500 7,858.50 0.000 0 037 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.3500 67,500.00 0.000 0 038 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.3500 11,097.00 0.000 0 039 PLACE HOT MIX ASPHALT SQYD 133.0000 8,379.00 49.810 6,624 (MISCELLANEOUS AREA) 040 TACK COAT TON 700.0000 84,000.00 1.999 1,399.30 1.999 1,399 041 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 310.0000 29,140.00 23.470 7,275.70 56.400 17,484 042 REMOVE ASPHALT CONCRETE DIKE LF 1.0000 65,700.00 1,189.000 1,189.00 1,189.000 1,189 043 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.4000 1,509,600.00 68,228.440 163,748.26 68,228.440 163,748 044 DRILL AND BOND (DOWEL BAR) EA 97.0000 4,268.00 44.000 4,268 045 MINOR CONCRETE (MINOR STRUCTURE) CY 6,800.0000 12,920.00 1.900 12,920 (F) 046 CULVERT SLURRY-CEMENT BACKFILL CY 215.0000 3,870.00 0.000 0 047 DETECTABLE WARNING SURFACE SQFT 35.2500 46,177.50 0.000 0 048 MINOR CONCRETE (CURB, SIDEWALK AND CY 870.0000 261,000.00 92.310 80,309.70 228.130 198,473 CURB RAMP) 049 GRIND CONCRETE CURB RAMP SQFT 84.0000 3,528.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 06:34 PM ESTIMATE NO. 012 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/23 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 05/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PRE/POST CONSTRUCTION SURVEYS EA 790.0000 37,920.00 9.000 7,110 051 ADJUST ACCESS BOX FRAME AND COVER EA 300.0000 600.00 0.000 0 (UTILITY) 052 GUARD RAILING DELINEATOR EA 24.0000 15,120.00 603.000 14,472 053 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.6500 33,920.00 0.000 0 054 REMOVE ROADSIDE SIGN EA 50.0000 200.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 055 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 5,610.00 0.000 0 (0.063"-UNFRAMED) 056 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.5000 7,130.00 0.000 0 (0.080"-UNFRAMED) 057 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 19.0000 684.00 0.000 0 (0.063"-FRAMED) 058 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 96.0000 960.00 0.000 0 METHOD) 059 INSTALL ROADSIDE SIGN PANEL ON EA 96.0000 10,560.00 0.000 0 EXISTING POST 060 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 39.5000 282,030.00 6,211.000 245,334 061 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 21.3500 17,934.00 600.000 12,810 062 MIDWEST GUARDRAIL SYSTEM LF 53.9000 349,811.00 1,607.000 86,617 (STEEL POST) (EMBEDDED IN ROCK) 063 MIDWEST GUARDRAIL SYSTEM LF 69.2500 56,785.00 1,315.000 91,063 (8' STEEL POST) (EMBEDDED IN ROCK) 064 TRANSITION RAILING (TYPE WB-31) EA 4,520.0000 9,040.00 2.000 9,040 065 END ANCHOR ASSEMBLY (TYPE SFT) EA 975.0000 3,900.00 15.000 14,625 066 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,190.0000 226,260.00 40.000 167,600 067 REMOVE GUARDRAIL LF 7.1500 107,250.00 14,959.250 106,958 068 PAINT TRAFFIC STRIPE (1-COAT) LF 0.2000 21,200.00 0.000 0 069 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 257,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 070 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 23,750.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 071 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 3.2500 72,800.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 072 6" AUDIBLE TRAFFIC STRIPE SYSTEMS LF 1.4000 138,460.00 0.000 0 073 12" RUMBLE STRIP STA 50.0000 40,500.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 074 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.4000 200,160.00 0.000 0 (WARRANTY) (BROKEN 36-12) 075 SUBSURFACE LOCATOR LS 194,946.0000 194,946.00 0.800 155,956 076 FIBER OPTIC CABLE SYSTEMS LS 6,245,915.0000 6,245,915.00 0.071 443,459.97 0.735 4,590,747 PROGRAM CAS145 PAGE 4 DATE 05/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 06:34 PM ESTIMATE NO. 012 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/23 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 05/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 MODIFYING CENSUS STATION SYSTEM LS 33,036.0000 33,036.00 0.000 0 078 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 1,002,257.0000 1,002,257.00 0.102 102,230.21 0.720 721,625 079 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 080 SHOULDER BACKING TON 76.0000 40,280.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 05/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-430564 TIME 06:34 PM ESTIMATE NO. 012 BID OPENING 02/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/23 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 05/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,387,777.70 9,941,684.49 ADJUSTMENT OF COMPENSATION -5,011.39 -26,011.39 EXTRA WORK 1,145,028.67 3,050,486.83 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 3,527,794.98 12,966,159.93 081 MOBILIZATION LS 2,804,900.0000 2,804,900.00 0.950 2,664,655 ORIGINAL CONTRACT AMOUNT 32,781,056.00 TOTAL WORK COMPLETED 3,527,794.98 15,630,814.93 MATERIALS ON HAND ON SITE 9,146.51 1,037,783.46 DEDUCTIONS 0.00 0.00 TOTAL 3,536,941.49 16,668,598.39 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/21/22 350 06/15/22 06/15/22 01/31/24 184 47 0 0 41% 53% PROGRESS IS SATISFACTORY GARY LEVINE RESIDENT ENGINEER