PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/03/13 EST. NO.08 TIME 01:44 PM R.E. NAME: NITA UPDADHYAYA 12-0F0604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/03/13 EST. NO.08 TIME 01:44 PM R.E. NAME: NITA UPDADHYAYA 12-0F0604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LIQUIDATED DAMAGES 10/16/12 LATE OPENIN -3,600.00 05 0.00 -3,600.00 TOTAL DEDUCTIONS 0.00 -3,600.00 PROGRAM CAS145 PAGE 1 DATE 01/03/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0F0604 TIME 01:44 PM ESTIMATE NO. 08 BID OPENING 01/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/12 R.E. NAME: NITA UPDADHYAYA DATE OF THIS ESTIMATE 01/03/13 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 12-ORA-5-5.6/6.6 ------------------------------ GRANITE CONSTRUCTION COMPANY IN ORANGE COUNTY IN SAN CLEMENTE P O BOX 50085 AND DANA POINT FROM 0.1 MILE SOUTH WATSONVILLE CA 950775085 OF CAMINO DE ESTRELLA OVERCROSSING TO 0.2 MILES SOUTH OF VIA CALIFORNIA OC AT CAMINO DE ESTRALLA FED. AID NO. ACIM-052(960)78E WIDEN ROAD AND BRIDGE, PLACE HMA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,000.0000 2,000.00 0.500 1,000 002 TIME-RELATED OVERHEAD WDAY 1,000.0000 260,000.00 118.000 118,000 003 CONSTRUCTION SITE MANAGEMENT LS 7,000.0000 7,000.00 0.700 4,900 004 PREPARE STORM WATER POLLUTION LS 2,000.0000 2,000.00 0.900 1,800 PREVENTION PLAN 005 TEMPORARY FIBER ROLL LF 3.7000 7,289.00 875.000 3,237 006 TEMPORARY GRAVEL BAG BERM LF 3.4500 6,762.00 0.000 0 007 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 6,000.00 2.000 6,000 008 TEMPORARY DRAINAGE INLET PROTECTION EA 155.0000 2,170.00 14.000 2,170 009 TEMPORARY HYDRAULIC MULCH SQYD 0.5500 2,002.00 1,333.000 733 (BONDED FIBER MATRIX) 010 STREET SWEEPING LS 20,000.0000 20,000.00 0.600 12,000 011 TEMPORARY CONCRETE WASHOUT BIN EA 2,500.0000 2,500.00 1.000 2,500 012 RAIN EVENT ACTION PLAN EA 500.0000 24,000.00 3.000 1,500 013 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 014 STORM WATER SAMPLING AND ANALYSIS DAY EA 10.0000 200.00 0.000 0 015 CONSTRUCTION AREA SIGNS LS 20,000.0000 20,000.00 0.600 12,000 016 TRAFFIC CONTROL SYSTEM LS 35,000.0000 35,000.00 0.600 21,000 017 TYPE III BARRICADE EA 55.0000 330.00 6.000 330 018 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 3.0000 450.00 168.000 504 019 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.6800 17,612.00 27,565.000 18,744 020 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 2,730.00 125.000 3,750 021 TEMPORARY PAVEMENT MARKER EA 4.0000 7,280.00 1,534.000 6,136 022 PORTABLE CHANGEABLE MESSAGE SIGN LS 10,000.0000 10,000.00 0.600 6,000 PROGRAM CAS145 PAGE 2 DATE 01/03/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0F0604 TIME 01:44 PM ESTIMATE NO. 08 BID OPENING 01/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/12 R.E. NAME: NITA UPDADHYAYA DATE OF THIS ESTIMATE 01/03/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY RAILING (TYPE K) LF 20.0000 107,000.00 5,350.000 107,000 024 TEMPORARY CRASH CUSHION MODULE EA 180.0000 16,560.00 92.000 16,560 025 TEMPORARY TRAFFIC SCREEN LF 2.4800 13,268.00 5,216.000 12,935 026 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.8000 3,696.00 3,675.000 2,940 STRIPE (HAZARDOUS WASTE) 027 ABANDON CULVERT LF 2.3000 322.00 66.000 151 028 REMOVE CHAIN LINK FENCE LF 7.8000 2,184.00 280.000 2,184 029 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.7200 19,440.00 14,043.000 10,110 030 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 1,960.00 450.000 900 031 REMOVE PAVEMENT MARKER EA 1.0000 2,180.00 617.000 617 032 REMOVE ROADSIDE SIGN EA 90.0000 2,430.00 4.000 360 033 REMOVE SIGN STRUCTURE EA 3,000.0000 9,000.00 1.000 3,000 034 REMOVE CULVERT LF 11.1600 3,348.00 300.000 3,348 035 REMOVE INLET EA 660.0000 5,280.00 7.000 4,620 036 COLD PLANE ASPHALT CONCRETE PAVEMENT SQFT 0.3000 4,953.00 0.000 0 (.10' MAXIMUM) 037 REMOVE CONCRETE BARRIER LF 64.5000 10,965.00 222.000 14,319 038 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 2.0000 4,196.00 0.000 0 039 REMOVE CONCRETE (MISCELLANEOUS) CY 77.0000 25,410.00 64.580 4,972 040 BRIDGE REMOVAL (PORTION) LS 15,000.0000 15,000.00 1.000 15,000 041 CLEARING AND GRUBBING (LS) LS 35,000.0000 35,000.00 0.800 28,000 042 ROADWAY EXCAVATION CY 30.0000 354,000.00 10,946.000 328,380 043 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.800 2,000 044 STRUCTURE EXCAVATION (BRIDGE) CY 55.0000 13,200.00 240.000 13,200 045 STRUCTURE BACKFILL (BRIDGE) CY 32.0000 6,080.00 120.000 3,840 046 SAND BACKFILL CY 70.0000 1,120.00 6.170 431 047 DITCH EXCAVATION CY 20.0000 940.00 40.000 800 048 HIGHWAY PLANTING LS 48,600.0000 48,600.00 0.000 0 049 MAINTAIN EXISTING PLANTED AREAS LS 12,700.0000 12,700.00 0.250 3,175 PROGRAM CAS145 PAGE 3 DATE 01/03/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0F0604 TIME 01:44 PM ESTIMATE NO. 08 BID OPENING 01/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/12 R.E. NAME: NITA UPDADHYAYA DATE OF THIS ESTIMATE 01/03/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PLANT ESTABLISHMENT WORK LS 34,900.0000 34,900.00 0.000 0 051 IRRIGATION SYSTEM LS 54,700.0000 54,700.00 0.050 2,735 052 IRRIGATION SLEEVE LF 30.0000 900.00 0.000 0 053 10" CORRUGATED HIGH DENSITY LF 12.0000 840.00 70.000 840 POLYETHYLENE PIPE CONDUIT 054 CLASS 3 AGGREGATE SUBBASE CY 6.6000 6,204.00 953.000 6,289 055 CLASS 2 AGGREGATE BASE CY 15.1000 119,441.00 5,347.000 80,739 056 HOT MIX ASPHALT (TYPE A) TON 60.0000 280,800.00 3,114.970 186,898 057 DATA CORE LS 4,000.0000 4,000.00 0.000 0 058 TACK COAT TON 600.0000 3,600.00 1.980 1,188 059 CONCRETE PAVEMENT CY 350.0000 108,500.00 347.000 121,450 (RAPID STRENGTH CONCRETE) 060 SEAL PAVEMENT JOINT LF 7.0000 12,250.00 0.000 0 061 TIE BAR EA 20.0000 5,000.00 250.000 5,000 062 DOWEL BAR (DRILL AND BOND) EA 13.5000 10,665.00 790.000 10,665 063 FURNISH PILING (CLASS 200) LF 40.0000 40,480.00 644.000 25,760 064 DRIVE PILE (CLASS 200) EA 4,100.0000 65,600.00 16.000 65,600 065 PRESTRESSING PRECAST GIRDER LS 50,000.0000 50,000.00 0.000 0 066 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 180.0000 18,540.00 103.000 18,540 067 STRUCTURAL CONCRETE, BRIDGE CY 700.0000 214,200.00 132.300 92,610 068 MINOR CONCRETE (MINOR STRUCTURE) CY 900.0000 27,900.00 22.850 20,565 (F) 069 DRILL AND BOND DOWEL LF 6.0000 210.00 35.000 210 070 FURNISH PRECAST PRESTRESSED CONCRETE EA 25,600.0000 102,400.00 4.000 102,400 BULB-TEE GIRDER (90'-100') 071 FURNISH PRECAST PRESTRESSED CONCRETE EA 31,600.0000 126,400.00 4.000 126,400 BULB-TEE GIRDER (110'-120') 072 ERECT PRECAST PRESTRESSED CONCRETE EA 6,640.0000 53,120.00 8.000 53,120 GIRDER 073 FURNISH POLYESTER CONCRETE OVERLAY CF 85.0000 11,135.00 0.000 0 074 PLACE POLYESTER CONCRETE OVERLAY SQFT 10.0000 20,980.00 0.000 0 075 JOINT SEAL (MR 2") LF 70.0000 3,710.00 0.000 0 076 BAR REINFORCING STEEL (BRIDGE) LB 0.8400 109,200.00 47,842.000 40,187 (F) PROGRAM CAS145 PAGE 4 DATE 01/03/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0F0604 TIME 01:44 PM ESTIMATE NO. 08 BID OPENING 01/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/12 R.E. NAME: NITA UPDADHYAYA DATE OF THIS ESTIMATE 01/03/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 FURNISH SIGN STRUCTURE (LIGHTWEIGHT) LB 7.0000 59,815.00 0.000 0 (F) 078 INSTALL SIGN STRUCTURE (LIGHTWEIGHT) LB 0.6000 5,127.00 0.000 0 (F) 079 FURNISH SIGN STRUCTURE (TRUSS) LB 4.3000 115,713.00 0.000 0 (F) 080 INSTALL SIGN STRUCTURE (TRUSS) LB 0.3000 8,073.00 0.000 0 (F) 081 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 24.0000 8,400.00 0.000 0 082 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.8000 3,360.00 0.000 0 (0.063"-UNFRAMED) 083 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 21.0000 2,520.00 0.000 0 (0.080"-FRAMED) 084 36" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 480.0000 14,400.00 0.000 0 (SIGN FOUNDATION) 085 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 1,530.0000 38,250.00 0.000 0 (SIGN FOUNDATION) 086 ROADSIDE SIGN - ONE POST EA 300.0000 7,500.00 0.000 0 087 ROADSIDE SIGN - TWO POST EA 550.0000 1,650.00 0.000 0 088 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 200.0000 200.00 0.000 0 METHOD) 089 18" REINFORCED CONCRETE PIPE LF 100.0000 11,000.00 104.000 10,400 090 24" REINFORCED CONCRETE PIPE LF 100.0000 47,000.00 472.000 47,200 091 SLOPE PAVING (CONCRETE) CY 400.0000 11,200.00 0.000 0 (F) 092 MINOR CONCRETE (TEXTURED PAVING) SQFT 4.7100 50,397.00 0.000 0 093 MINOR CONCRETE (CURB, SIDEWALK AND CY 360.0000 64,800.00 1.920 691 CURB RAMP) 094 MISCELLANEOUS IRON AND STEEL LB 1.5000 5,550.00 3,000.000 4,500 (F) 095 CHAIN LINK FENCE (TYPE CL-6) LF 28.7400 7,185.00 0.000 0 096 OBJECT MARKER (TYPE K-1) EA 50.0000 50.00 0.000 0 097 METAL BEAM GUARD RAILING (WOOD POST) LF 31.0000 2,356.00 0.000 0 098 CHAIN LINK RAILING (TYPE 7) LF 82.0000 21,484.00 0.000 0 099 CONCRETE BARRIER (TYPE 26 MODIFIED) LF 118.0000 30,916.00 0.000 0 100 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,120.0000 6,240.00 0.000 0 101 CONCRETE BARRIER (TYPE 60GE) LF 154.0000 26,180.00 0.000 0 102 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 5,346.00 0.000 0 103 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 3,180.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 01/03/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0F0604 TIME 01:44 PM ESTIMATE NO. 08 BID OPENING 01/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/12 R.E. NAME: NITA UPDADHYAYA DATE OF THIS ESTIMATE 01/03/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,840.00 0.000 0 (BROKEN 12-3) 105 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 5,040.00 0.000 0 106 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 280.00 0.000 0 (BROKEN 6-1) 107 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5200 7,800.00 0.000 0 (BROKEN 36-12) 108 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 1,070.00 0.000 0 (BROKEN 17-7) 109 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.2000 1,632.00 0.000 0 110 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 2,460.00 0.000 0 111 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,500.0000 5,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 112 SIGNAL AND LIGHTING (LOCATION 1) LS 128,000.0000 128,000.00 0.020 2,560 113 SIGNAL AND LIGHTING (LOCATION 2) LS 134,000.0000 134,000.00 0.000 0 114 SIGNAL AND LIGHTING (CITY) LS 81,400.0000 81,400.00 0.000 0 115 COMMUNICATION CONDUIT (BRIDGE) LF 25.0000 19,650.00 0.000 0 116 ELECTRIC SERVICE (IRRIGATION) LS 7,810.0000 7,810.00 0.000 0 117 MODIFY CLOSED CIRCUIT TELEVISION LS 11,200.0000 11,200.00 0.000 0 SYSTEM 118 MODIFY RAMP METERING SYSTEM LS 26,200.0000 26,200.00 0.300 7,860 119 MODIFY LIGHTING AND SIGN ILLUMINATION LS 39,000.0000 39,000.00 0.250 9,750 120 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 121 LEAN CONCRETE BASE CY 230.0000 34,500.00 152.000 34,960 (RAPID STRENGTH CONCRETE) PROGRAM CAS145 PAGE 6 DATE 01/03/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0F0604 TIME 01:44 PM ESTIMATE NO. 08 BID OPENING 01/19/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/12 R.E. NAME: NITA UPDADHYAYA DATE OF THIS ESTIMATE 01/03/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 1,880,270.03 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 1,939.36 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 1,882,209.39 122 MOBILIZATION LS 275,598.0000 275,598.00 0.050 13,779.90 1.000 275,598 ORIGINAL CONTRACT AMOUNT 3,987,204.00 TOTAL WORK COMPLETED 13,779.90 2,157,807.39 MATERIALS ON HAND ON SITE 98,643.03 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -3,600.00 TOTAL 13,779.90 2,252,850.42 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/22/12 510 05/16/12 05/16/12 04/16/14 127 24 0 0 54% 25% PROGRESS IS SATISFACTORY NITA UPDADHYAYA RESIDENT ENGINEER PROGRAM CAS145 DATE 01/03/13