PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/22/05 EST. NO.04 TIME 02:24 PM R.E. NAME: NAJM, ELIE 12-0G5404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 1,739.65 E.W. @ F.A.(+) 101705 N 0001 0 1,739.65 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 1,739.65 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/22/05 EST. NO.04 TIME 02:24 PM R.E. NAME: NAJM, ELIE 12-0G5404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE POSSIBLE 5DAY LD -6,000.00 02 RETURN 5DAY LD 6,000.00 04 6,000.00 0.00 LIQUIDATED DAMAGES LD4DAYS@$1,200/DAY -4,800.00 02 LD'S25DAYS@ $1200/D -30,000.00 03 RETURN 15DAY LD 18,000.00 04 RETURN 4DAY LD 4,800.00 04 22,800.00 -12,000.00 TOTAL DEDUCTIONS 28,800.00 -12,000.00 PROGRAM CAS145 PAGE 1 DATE 12/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0G5404 TIME 02:24 PM ESTIMATE NO. 04 BID OPENING 12/09/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/27/05 R.E. NAME: NAJM, ELIE DATE OF THIS ESTIMATE 12/22/05 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 12-ORA-5-26.6/26.6 ---------------------------------- INSPECTION ENGINEERING IN ORANGE COUNTY IN IRVINE AT 2973 HARBOR BLVD, SUITE 516 CULVER DRIVE COSTA MESA, CA 92626 FED. AID NO. ACIM-005 -2(921)98E,G-005 -2(921)98E MODIFY TRAFFIC SIGNAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,200.0000 1,200.00 1.000 1,200.00 PROGRAM 02 WATER POLLUTION CONTROL LS 1,440.0000 1,440.00 1.000 1,440.00 03 CONSTRUCTION AREA SIGNS LS 3,500.0000 3,500.00 1.000 3,500.00 S) 04 TRAFFIC CONTROL SYSTEM LS 1,900.0000 1,900.00 1.000 1,900.00 S) 05 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 840.00 28.000 840.00 S) 06 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 8.5700 3,942.20 460.000 3,942.20 STRIPE 07 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 3.0000 3,870.00 1,290.000 3,870.00 08 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 21.6000 1,576.80 73.000 1,576.80 09 REMOVE PAVEMENT MARKER EA 1.2000 204.00 170.000 204.00 10 REMOVE ROADSIDE SIGN (WOOD POST) EA 198.0000 1,980.00 10.000 1,980.00 11 REMOVE ROADSIDE SIGN EA 198.0000 396.00 2.000 396.00 (STRAP AND SADDLE BRACKET METHOD) 12 RELOCATE ROADSIDE SIGN-TWO POST EA 300.0000 300.00 1.000 300.00 13 REMOVE CONCRETE CURB M 98.4000 1,377.60 14.000 1,377.60 14 CLEARING AND GRUBBING LS 1,800.0000 1,800.00 1.000 1,800.00 15 ROADWAY EXCAVATION M3 96.0000 960.00 10.000 960.00 16 LEAD COMPLIANCE PLAN LS 2,400.0000 2,400.00 1.000 2,400.00 17 ASPHALT CONCRETE (TYPE A) TONN 180.0000 2,520.00 14.000 2,520.00 18 ROADSIDE SIGN - ONE POST EA 360.0000 4,680.00 13.000 4,680.00 19 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 180.0000 360.00 2.000 360.00 METHOD) 20 MINOR CONCRETE (CURB) M 256.8000 1,797.60 7.000 1,797.60 21 THERMOPLASTIC CROSSWALK AND M2 26.1600 2,877.60 110.000 2,877.60 S) PAVEMENT MARKING 22 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.1800 1,298.00 1,100.000 1,298.00 S) PROGRAM CAS145 PAGE 2 DATE 12/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0G5404 TIME 02:24 PM ESTIMATE NO. 04 BID OPENING 12/09/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/27/05 R.E. NAME: NAJM, ELIE DATE OF THIS ESTIMATE 12/22/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 150 MM THERMOPLASTIC TRAFFIC STRIPE M 11.4000 342.00 30.000 342.00 S) 24 200 MM THERMOPLASTIC TRAFFIC STRIPE M 6.0000 1,200.00 200.000 1,200.00 S) 25 200 MM THERMOPLASTIC TRAFFIC STRIPE M 11.4000 342.00 30.000 342.00 S) (BROKEN 3.66 M - 0.92 M) 26 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.2000 176.40 42.000 176.40 S) (BROKEN 1.83 M - 0.30 M) 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.8000 702.00 390.000 702.00 S) (BROKEN 5.18 M - 2.14 M) 28 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 12.0000 144.00 12.000 144.00 12.000 144.00 S) TYPE C) 29 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 6.0000 504.00 84.000 504.00 S) TYPE G) 30 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 6.0000 372.00 62.000 372.00 S) TYPE H) 31 PAVEMENT MARKER EA 12.0000 96.00 8.000 96.00 S) (RETROREFLECTIVE - SPECIAL TYPE D) 32 SIGNAL AND LIGHTING LS 88,000.0000 88,000.00 1.000 88,000.00 S) PROGRAM CAS145 PAGE 3 DATE 12/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0G5404 TIME 02:24 PM ESTIMATE NO. 04 BID OPENING 12/09/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/27/05 R.E. NAME: NAJM, ELIE DATE OF THIS ESTIMATE 12/22/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 144.00 133,098.20 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 1,739.65 1,739.65 SUBTOTAL AMOUNT EARNED 1,883.65 134,837.85 ORIGINAL CONTRACT AMOUNT 133,098.20 TOTAL WORK COMPLETED 1,883.65 134,837.85 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 28,800.00 -12,000.00 TOTAL 30,683.65 122,837.85 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/13/05 30 07/05/05 07/05/05 10/27/05 80 0 42 0 100% 100% NAJM, ELIE RESIDENT ENGINEER PROGRAM CAS145 DATE 12/22/05