PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/16/08 EST. NO.08 TIME 10:33 AM R.E. NAME: CHAUDRY, MONAS 12-0H0504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/16/08 EST. NO.08 TIME 10:33 AM R.E. NAME: CHAUDRY, MONAS 12-0H0504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 036 -24,059.25 02 OVERBID ITEM NO. 036 -6,415.80 03 OVERBID ITEM NO. 036 -1,603.95 04 OVERBID ITEM NO. 036 32,079.00 07 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 12/16/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H0504 TIME 10:33 AM ESTIMATE NO. 08 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/28/08 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 12/16/08 LOCATION FINAL ESTIMATE 12-ORA-1-5.3/ .0 -------------- RSB GROUP, INC. IN ORANGE COUNTY IN LAGUNA BEACH AT 22600-G LAMBERT STREET, #1405 9TH AVENUE LAKE FOREST, CA 92630 FED. AID NO. N O N E SIGNAL AND LIGHTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,500.0000 2,500.00 1.000 2,500.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 03 TEMPORARY GRAVEL BAG BERM M 10.0000 500.00 50.000 500.00 04 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 500.00 1.000 500.00 05 STREET SWEEPING LS 1,000.0000 1,000.00 1.000 1,000.00 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 07 CONSTRUCTION AREA SIGNS LS 2,000.0000 2,000.00 1.000 2,000.00 S) 08 TRAFFIC CONTROL SYSTEM LS 37,000.0000 37,000.00 1.000 37,000.00 S) 09 PORTABLE CHANGEABLE MESSAGE SIGN EA 4,200.0000 8,400.00 2.000 8,400.00 S) 10 REMOVE THERMOPLASTIC TRAFFIC STRIPE AND M2 40.0000 600.00 18.130 725.20 S) PAVEMENT MARKING 11 REMOVE PAVEMENT MARKER EA 5.0000 240.00 51.000 255.00 S) 12 REMOVE ROADSIDE SIGN (WOOD POST) EA 300.0000 300.00 1.000 300.00 13 RELOCATE ROADSIDE SIGN (METAL POST) EA 300.0000 600.00 2.000 600.00 14 REMOVE CONCRETE CURB M 50.0000 400.00 8.000 400.00 15 CLEARING AND GRUBBING LS 1,000.0000 1,000.00 1.000 1,000.00 16 ROADWAY EXCAVATION M3 100.0000 2,000.00 20.000 2,000.00 17 ROADWAY EXCAVATION (TYPE Y-1) M3 200.0000 5,000.00 25.000 5,000.00 (AERIALLY DEPOSITED LEAD) 18 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 19 STRUCTURE EXCAVATION (RETAINING WALL) M3 100.0000 6,200.00 62.000 6,200.00 F) 20 STRUCTURE BACKFILL (RETAINING WALL) M3 100.0000 4,200.00 42.000 4,200.00 F) 21 PERVIOUS BACKFILL MATERIAL (RETAINING M3 100.0000 1,000.00 10.000 1,000.00 F) WALL) 22 WILD FLOWER SEEDING LS 2,500.0000 2,500.00 1.000 2,500.00 PROGRAM CAS145 PAGE 2 DATE 12/16/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H0504 TIME 10:33 AM ESTIMATE NO. 08 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/28/08 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 12/16/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 STRUCTURAL CONCRETE, RETAINING WALL M3 1,000.0000 9,000.00 9.000 9,000.00 F) 24 FRACTURED RIB TEXTURE M2 200.0000 3,800.00 19.000 3,800.00 F) 25 BAR REINFORCING STEEL (RETAINING WALL) KG 10.0000 2,450.00 245.000 2,450.00 SF) 26 100 MM PLASTIC PIPE M 100.0000 500.00 5.000 500.00 27 MINOR CONCRETE (CURB) M 100.0000 2,500.00 25.000 2,500.00 28 MINOR CONCRETE (GUTTER) M3 250.0000 500.00 2.000 500.00 29 MINOR CONCRETE (SIDEWALK) M3 250.0000 2,000.00 8.000 2,000.00 30 MINOR CONCRETE (CURB RAMP) M3 300.0000 3,000.00 10.000 3,000.00 31 CABLE RAILING M 100.0000 1,500.00 15.000 1,500.00 F) 32 THERMOPLASTIC PAVEMENT MARKING M2 30.0000 1,050.00 35.080 1,052.40 S) 33 100 MM THERMOPLASTIC TRAFFIC STRIPE M 7.0000 770.00 496.640 3,476.48 S) 34 PAVEMENT MARKER (RETROREFLECTIVE) EA 25.0000 200.00 9.000 225.00 S) 35 SIGNAL AND LIGHTING LS 112,000.0000 112,000.00 1.000 112,000.00 S) PROGRAM CAS145 PAGE 3 DATE 12/16/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H0504 TIME 10:33 AM ESTIMATE NO. 08 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/28/08 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 12/16/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 222,084.08 ADJUSTMENT OF COMPENSATION 0.00 46,670.32 EXTRA WORK 0.00 13,484.41 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 282,238.81 36 MOBILIZATION LS 60,000.0000 60,000.00 1.000 60,000.00 ORIGINAL CONTRACT AMOUNT 279,210.00 TOTAL WORK COMPLETED 0.00 342,238.81 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 342,238.81 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 036 MOBILIZATION 27,921.00 60,000.00 32,079.00 DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/06/07 90 12/03/07 12/03/07 10/28/08 115 112 32 0 100% 100% CHAUDRY, MONAS RESIDENT ENGINEER PROGRAM CAS145 DATE 12/16/08