PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/07 EST. NO.01 TIME 09:49 AM R.E. NAME: ZOKAI, FARID 12-0H2494 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/07 EST. NO.01 TIME 09:49 AM R.E. NAME: ZOKAI, FARID 12-0H2494 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H2494 TIME 09:49 AM ESTIMATE NO. 01 BID OPENING 04/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: ZOKAI, FARID DATE OF THIS ESTIMATE 06/19/07 LOCATION PROGRESS ESTIMATE 12-ORA-133-8.3/ .0 ----------------- AUTOBAHN CONSTRUCTION INC IN ORANGE COUNTY IN IRVINE AT P O BOX 11238 ROUTE 133 AND 405 SEPARATION SANTA ANA CA 92711 FED. AID NO. N O N E RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 300.0000 300.00 0.500 150.00 0.500 150.00 PROGRAM 02 WATER POLLUTION CONTROL LS 500.0000 500.00 0.250 125.00 0.250 125.00 03 TEMPORARY DRAINAGE INLET PROTECTION EA 50.0000 200.00 0.500 25.00 0.500 25.00 04 STREET SWEEPING LS 1,000.0000 1,000.00 0.250 250.00 0.250 250.00 05 CONSTRUCTION AREA SIGNS LS 7,500.0000 7,500.00 0.700 5,250.00 0.700 5,250.00 S) 06 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 0.250 2,500.00 0.250 2,500.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,800.0000 1,800.00 0.250 450.00 0.250 450.00 S) 08 REMOVE METAL BEAM GUARD RAILING M 65.0000 1,625.00 0.000 0.00 09 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 2.0000 720.00 0.000 0.00 STRIPE 10 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 0.5000 255.00 0.000 0.00 11 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 20.0000 500.00 0.000 0.00 12 REMOVE PAVEMENT MARKER EA 1.0000 110.00 0.000 0.00 13 REMOVE ROADSIDE SIGN (WOOD POST) EA 120.0000 240.00 0.000 0.00 14 REMOVE ASPHALT CONCRETE DIKE M 1.5000 420.00 0.000 0.00 15 REMOVE DELINEATOR EA 25.0000 150.00 0.000 0.00 16 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 12.0000 20,880.00 0.000 0.00 S) 17 REMOVE CONCRETE (CURB AND GUTTER) M 120.0000 6,240.00 0.000 0.00 18 REMOVE BRIDGE RAILING M 150.0000 4,500.00 0.000 0.00 19 CLEARING AND GRUBBING LS 500.0000 500.00 0.250 125.00 0.250 125.00 20 LEAD COMPLIANCE PLAN LS 800.0000 800.00 0.000 0.00 21 ASPHALT CONCRETE (TYPE A) TONN 100.0000 1,800.00 0.000 0.00 22 ASPHALT CONCRETE (OPEN GRADED) TONN 200.0000 30,000.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/19/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H2494 TIME 09:49 AM ESTIMATE NO. 01 BID OPENING 04/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: ZOKAI, FARID DATE OF THIS ESTIMATE 06/19/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 350.0000 87,500.00 0.000 0.00 24 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 12.0000 300.00 0.000 0.00 25 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 12.0000 2,640.00 0.000 0.00 26 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 12.0000 420.00 0.000 0.00 27 GROOVE EXISTING CONCRETE PAVEMENT M2 1.0000 1,830.00 0.000 0.00 28 FURNISH SINGLE SHEET ALUMINUM SIGN M2 140.0000 980.00 0.000 0.00 (1.6 MM-UNFRAMED) 29 FURNISH SINGLE SHEET ALUMINUM SIGN M2 200.0000 2,200.00 0.000 0.00 (2.0 MM-FRAMED) 30 ROADSIDE SIGN - ONE POST EA 60.0000 1,560.00 0.000 0.00 31 ROADSIDE SIGN - TWO POST EA 1,000.0000 1,000.00 0.000 0.00 32 INSTALL ROADSIDE SIGN EA 2,800.0000 2,800.00 0.000 0.00 (LAMINATED WOOD BOX TYPE) (TWO POSTS) 33 MINOR CONCRETE (CURB AND GUTTER) M3 850.0000 6,800.00 0.000 0.00 34 DELINEATOR (CLASS 1) EA 30.0000 630.00 0.000 0.00 35 METAL BEAM GUARD RAILING (WOOD POST) M 100.0000 4,000.00 0.000 0.00 S) 36 TRANSITION RAILING (TYPE WB) EA 8,000.0000 16,000.00 0.000 0.00 S) 37 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,000.0000 4,000.00 0.000 0.00 S) 38 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,000.0000 3,000.00 0.000 0.00 S) 39 THERMOPLASTIC PAVEMENT MARKING M2 20.0000 500.00 0.000 0.00 S) 40 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.7000 532.00 0.000 0.00 S) 41 200 MM THERMOPLASTIC TRAFFIC STRIPE M 4.5000 450.00 0.000 0.00 S) 42 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 520.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 43 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.0000 120.00 0.000 0.00 S) 44 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 5.0000 130.00 0.000 0.00 S) TYPE G) 45 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 5.0000 215.00 0.000 0.00 S) TYPE H) 46 INDUCTIVE LOOP DETECTOR LS 1,500.0000 1,500.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 06/19/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H2494 TIME 09:49 AM ESTIMATE NO. 01 BID OPENING 04/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: ZOKAI, FARID DATE OF THIS ESTIMATE 06/19/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 8,875.00 8,875.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 8,875.00 8,875.00 47 MOBILIZATION LS 5,000.0000 5,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 234,667.00 TOTAL WORK COMPLETED 8,875.00 8,875.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 8,875.00 8,875.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/04/07 45 05/21/07 05/21/07 07/24/07 22 0 0 0 4% 49% PROGRESS UNSATISFACTORY ZOKAI, FARID RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 06/19/07