PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/22/08 EST. NO.01 TIME 09:17 AM R.E. NAME: HAMIDI, FRED 12-0H5104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/22/08 EST. NO.01 TIME 09:17 AM R.E. NAME: HAMIDI, FRED 12-0H5104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H5104 TIME 09:17 AM ESTIMATE NO. 01 BID OPENING 11/01/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/08 R.E. NAME: HAMIDI, FRED DATE OF THIS ESTIMATE 07/22/08 LOCATION RERUN PROGRESS ESTIMATE 12-ORA-55-3.4/4.1 ----------------------- PETERSON-CHASE IN ORANGE COUNTY IN COSTA MESA FROM 1792 KAISER AVE 0.2 MILE NORTH OF WILSON STREET IRVINE, CA 92614-5706 OVERCROSSING TO 0.5 MILE SOUTH OF BRISTOL STREET UNDERCROSSING FED. AID NO. N O N E INSTALL SIGN PANEL AND STRUCTURE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000.00 02 PREPARE WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 0.750 1,500.00 0.750 1,500.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 300.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 3,700.0000 3,700.00 0.900 3,330.00 0.900 3,330.00 S) 05 TRAFFIC CONTROL SYSTEM LS 12,000.0000 12,000.00 1.000 12,000.00 1.000 12,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN EA 600.0000 1,200.00 2.000 1,200.00 2.000 1,200.00 S) 07 REMOVE BRIDGE MOUNTED SIGN EA 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000.00 08 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED LB 7.0000 31,703.00 4,529.000 31,703.00 4,529.000 31,703.00 F) WITH WALKWAY) 09 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED LB 2.0000 9,058.00 4,529.000 9,058.00 4,529.000 9,058.00 F) WITH WALKWAY) 10 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 17.0000 20,570.00 1,207.000 20,519.00 1,207.000 20,519.00 11 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 5.7000 5,016.00 877.000 4,998.90 877.000 4,998.90 12 MODIFY LIGHTING AND SIGN ILLUMINATION LS 20,000.0000 20,000.00 1.000 20,000.00 1.000 20,000.00 S) PROGRAM CAS145 PAGE 2 DATE 07/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H5104 TIME 09:17 AM ESTIMATE NO. 01 BID OPENING 11/01/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/08 R.E. NAME: HAMIDI, FRED DATE OF THIS ESTIMATE 07/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 109,308.90 109,308.90 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 109,308.90 109,308.90 ORIGINAL CONTRACT AMOUNT 110,547.00 TOTAL WORK COMPLETED 109,308.90 109,308.90 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 109,308.90 109,308.90 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/21/07 30 06/09/08 05/19/08 09/30/08 43 0 0 0 99% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU WORKING ON SUSPENSION HAMIDI, FRED RESIDENT ENGINEER PROGRAM CAS145 DATE 07/22/08