PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/23/17 EST. NO. 001 TIME 02:10 PM R.E. NAME: NGUYEN, IRVIN 12-0H5304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/23/17 EST. NO. 001 TIME 02:10 PM R.E. NAME: NGUYEN, IRVIN 12-0H5304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H5304 TIME 02:10 PM ESTIMATE NO. 001 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/17 R.E. NAME: NGUYEN, IRVIN DATE OF THIS ESTIMATE 01/23/17 LOCATION PROGRESS ESTIMATE 12-ORA-5-6.8/6.8 ----------------- UNITED ENGINEERING & IN ORANGE COUNTY ON RTE 5 IN SAN CONSTRUCTION, INC JUAN CAPISTRANO AND IRVINE AT NORTH 336 NORTH CENTRAL AVE., #10A BOUND CAMINO LAS RAMBLAS LOOP ON GLENDALE CA 91203 RAMP AND NEAR BEE CANYON CREEK VARIOUS LOCATIONS FED. AID NO. ACIM-052-9(84E) BRIDGE RAIL UPGRADE/REPLACE DECK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 0.000 0 002 CONSTRUCTION AREA SIGNS LS 12,000.0000 12,000.00 0.500 6,000.00 0.500 6,000 003 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.100 2,500.00 0.100 2,500 004 CHANNELIZER (SURFACE MOUNTED) EA 50.0000 1,650.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 24,000.0000 24,000.00 0.100 2,400.00 0.100 2,400 006 TEMPORARY RAILING (TYPE K) LF 30.0000 15,600.00 0.000 0 007 ALTERNATIVE TEMPORARY CRASH CUSHION EA 250.0000 1,250.00 0.000 0 008 TEMPORARY TRAFFIC SCREEN LF 5.0000 600.00 0.000 0 009 JOB SITE MANAGEMENT LS 6,000.0000 6,000.00 0.000 0 010 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.000 0 011 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 1,000.00 0.000 0 012 ASBESTOS COMPLIANCE PLAN LS 6,000.0000 6,000.00 0.000 0 013 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 1.2500 3,137.50 0.000 0 (HAZARDOUS WASTE) 014 TREATED WOOD WASTE LB 4.0000 12,680.00 0.000 0 015 REMOVE GUARDRAIL LF 10.0000 2,500.00 0.000 0 016 REMOVE PAINTED TRAFFIC STRIPE LF 1.0000 2,260.00 0.000 0 017 REMOVE PAINTED PAVEMENT MARKING SQFT 2.0000 1,400.00 0.000 0 018 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 5,770.00 0.000 0 019 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.7500 1,610.00 0.000 0 020 REMOVE PAVEMENT MARKER EA 1.0000 330.00 0.000 0 021 REMOVE ROADSIDE SIGN EA 100.0000 1,900.00 0.000 0 022 REMOVE ASPHALT CONCRETE DIKE LF 15.0000 3,150.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 01/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H5304 TIME 02:10 PM ESTIMATE NO. 001 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/17 R.E. NAME: NGUYEN, IRVIN DATE OF THIS ESTIMATE 01/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 BRIDGE REMOVAL (PORTION) LS 80,000.0000 80,000.00 0.000 0 024 HOT MIX ASPHALT (TYPE A) TON 250.0000 10,000.00 0.000 0 025 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 13.3000 1,995.00 0.000 0 026 TEMPORARY SUPPORT LS 160,000.0000 160,000.00 0.000 0 027 STRUCTURAL CONCRETE, BRIDGE CY 1,800.0000 37,800.00 0.000 0 (F) 028 STRUCTURAL CONCRETE, BRIDGE CY 1,200.0000 128,400.00 0.000 0 (F) (POLYMER FIBER) 029 STRUCTURAL CONCRETE, APPROACH SLAB CY 950.0000 83,600.00 0.000 0 (TYPE R) 030 DRILL AND BOND DOWEL LF 62.0000 11,594.00 0.000 0 031 JOINT SEAL (MR 1") LF 90.0000 5,040.00 0.000 0 032 BAR REINFORCING STEEL (BRIDGE) LB 0.9000 36,090.00 0.000 0 (F) 033 HEADED BAR REINFORCEMENT EA 325.0000 24,050.00 0.000 0 (F) 034 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 50.0000 2,800.00 0.000 0 035 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 50.0000 7,000.00 0.000 0 (0.063"-UNFRAMED) 036 ROADSIDE SIGN - ONE POST EA 240.0000 4,080.00 0.000 0 037 ROADSIDE SIGN - TWO POST EA 1,000.0000 2,000.00 0.000 0 038 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.0000 1,680.00 0.000 0 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 039 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 6.0000 1,080.00 0.000 0 040 DELINEATOR (CLASS 1) EA 45.0000 2,340.00 0.000 0 041 OBJECT MARKER (TYPE P) EA 50.0000 200.00 0.000 0 042 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 42.0000 6,720.00 0.000 0 043 TRANSITION RAILING (TYPE WB-31) EA 4,000.0000 12,000.00 0.000 0 044 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,000.0000 9,000.00 0.000 0 045 CONCRETE BARRIER (TYPE 732 MODIFIED) LF 180.0000 21,060.00 0.000 0 (F) 046 CONCRETE BARRIER (TYPE 732) LF 125.0000 40,750.00 0.000 0 (F) 047 PAINT TRAFFIC STRIPE (2-COAT) LF 1.2500 2,825.00 0.000 0 048 PAINT PAVEMENT MARKING (2-COAT) SQFT 2.0000 1,400.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 01/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H5304 TIME 02:10 PM ESTIMATE NO. 001 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/17 R.E. NAME: NGUYEN, IRVIN DATE OF THIS ESTIMATE 01/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 4,330.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 050 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 2,840.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 051 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 1,665.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 052 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 6.0000 5,520.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 053 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.2500 1,072.50 0.000 0 054 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 055 ROADWAY EXCAVATION CY 150.0000 16,500.00 0.000 0 056 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 50.0000 10,000.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 01/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H5304 TIME 02:10 PM ESTIMATE NO. 001 BID OPENING 10/20/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/17 R.E. NAME: NGUYEN, IRVIN DATE OF THIS ESTIMATE 01/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 10,900.00 10,900.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 10,900.00 10,900.00 057 MOBILIZATION LS 125,000.0000 125,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 994,269.00 TOTAL WORK COMPLETED 10,900.00 10,900.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 10,900.00 10,900.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 057 MOBILIZATION 99,426.90 125,000.00 25,573.10 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/09/16 140 12/27/16 12/27/16 08/01/17 8 9 0 0 1% 6% PROGRESS IS SATISFACTORY NGUYEN, IRVIN RESIDENT ENGINEER PROGRAM CAS145 DATE 01/23/17