PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/27/08 EST. NO.02 TIME 01:35 PM R.E. NAME: CHAUDRY, MONAS 12-0J0404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/27/08 EST. NO.02 TIME 01:35 PM R.E. NAME: CHAUDRY, MONAS 12-0J0404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/27/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J0404 TIME 01:35 PM ESTIMATE NO. 02 BID OPENING 01/31/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 10/27/08 LOCATION PROGRESS ESTIMATE 12-ORA-22-R10.3/ .0 ----------------- TDS ENGINEERING IN ORANGE COUNTY IN ORANGE ON ROUTE 1014 S WESTLAKE BLVD,STE14136 22 AT CHAPMAN AVENUE OFF-RAMP WESTLAKE VILLAGE, CA 91361 FED. AID NO. N O N E MODIFY TRAFFIC SIGNAL AND STRIPING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.250 500.00 0.500 1,000.00 02 PREPARE WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 1.000 2,000.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 1,500.00 3.000 1,500.00 3.000 1,500.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 0.250 250.00 05 CONSTRUCTION AREA SIGNS LS 100.0000 100.00 0.500 50.00 S) 06 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.250 6,250.00 0.500 12,500.00 S) 07 TYPE III BARRICADE EA 100.0000 500.00 0.000 0.00 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,000.0000 1,000.00 0.000 0.00 S) 09 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.0000 1,360.00 0.000 0.00 S) STRIPE 10 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 2,060.50 0.000 0.00 S) 11 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.5000 1,925.00 0.000 0.00 S) 12 REMOVE PAVEMENT MARKER EA 1.0000 215.00 0.000 0.00 S) 13 REMOVE ROADSIDE SIGN EA 100.0000 600.00 6.000 600.00 6.000 600.00 14 REMOVE ROADSIDE SIGN EA 100.0000 200.00 0.000 0.00 (STRAP AND SADDLE BRACKET METHOD) 15 REMOVE CONCRETE CY 200.0000 1,000.00 4.000 800.00 4.000 800.00 16 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500.00 17 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 2,200.00 220.000 2,200.00 220.000 2,200.00 (0.063"-UNFRAMED) 18 ROADSIDE SIGN - ONE POST EA 250.0000 2,750.00 6.000 1,500.00 6.000 1,500.00 19 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 150.0000 450.00 0.000 0.00 METHOD) 20 MINOR CONCRETE (CURB, SIDEWALK AND CY 1,000.0000 3,000.00 2.000 2,000.00 2.000 2,000.00 CURB RAMP) 21 CURB RAMP DETECTABLE WARNING SURFACE SQFT 50.0000 1,500.00 10.000 500.00 10.000 500.00 22 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 1,275.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 10/27/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J0404 TIME 01:35 PM ESTIMATE NO. 02 BID OPENING 01/31/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 10/27/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 117.00 0.000 0.00 S) (BROKEN 12-3) 24 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 3,080.00 0.000 0.00 S) 25 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 269.50 0.000 0.00 S) (BROKEN 17-7) 26 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 234.00 0.000 0.00 S) 27 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 170.00 0.000 0.00 S) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 650.00 0.000 0.00 S) 29 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,500.0000 2,500.00 0.250 625.00 0.500 1,250.00 SYSTEM ELEMENTS DURING CONSTRUCTION 30 SIGNAL AND LIGHTING LS 108,161.0000 108,161.00 0.400 43,264.40 0.750 81,120.75 PROGRAM CAS145 PAGE 3 DATE 10/27/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J0404 TIME 01:35 PM ESTIMATE NO. 02 BID OPENING 01/31/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/08 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 10/27/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 59,739.40 110,770.75 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 59,739.40 110,770.75 ORIGINAL CONTRACT AMOUNT 170,317.00 TOTAL WORK COMPLETED 59,739.40 110,770.75 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 59,739.40 110,770.75 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/27/08 30 09/15/08 08/25/08 02/25/09 5 27 0 0 63% 17% PROGRESS IS SATISFACTORY *** SUSPENDED ON 09/26/08. CHAUDRY, MONAS RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 10/27/08