PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/23/15 EST. NO. 001 TIME 08:50 AM R.E. NAME: EMAM, KAMRAN 12-0J6404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/23/15 EST. NO. 001 TIME 08:50 AM R.E. NAME: EMAM, KAMRAN 12-0J6404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J6404 TIME 08:50 AM ESTIMATE NO. 001 BID OPENING 10/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/15 R.E. NAME: EMAM, KAMRAN DATE OF THIS ESTIMATE 04/23/15 LOCATION PROGRESS ESTIMATE 12-ORA-55-7.6/9.9 ----------------- O'DONNELL CONSTRUCTION, INC. IN ORANGE COUNTY, IN SANTA ANA AND 559 W COVINA BLVD TUSTIN FROM 0.2 MILE SOUTH OF DYER SAN DIMAS CA 91773 ROAD UNDERCROSSING TO 0.1 MILE SOUTH OF MCFADDEN AVE UNDERCROSSING FED. AID NO. NHP-P055(57)E EROSION CONTROL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000 002 CONSTRUCTION AREA SIGNS LS 7,000.0000 7,000.00 0.700 4,900.00 0.700 4,900 003 TRAFFIC CONTROL SYSTEM LS 70,000.0000 70,000.00 0.300 21,000.00 0.300 21,000 004 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.300 1,200.00 0.300 1,200 005 PREPARE STORM WATER POLLUTION PREVENTION LS 6,000.0000 6,000.00 0.700 4,200.00 0.700 4,200 PLAN 006 RAIN EVENT ACTION PLAN EA 500.0000 8,500.00 0.000 0 007 STORM WATER SAMPLING AND ANALYSIS DAY EA 150.0000 1,050.00 0.000 0 008 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 009 TEMPORARY CHECK DAM LF 4.5000 2,340.00 100.000 450.00 100.000 450 010 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 2,700.00 4.000 400.00 4.000 400 011 TEMPORARY FIBER ROLL LF 3.2500 17,225.00 0.000 0 012 TEMPORARY GRAVEL BAG BERM LF 4.5000 15,750.00 1,000.000 4,500.00 1,000.000 4,500 013 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 3,000.00 0.000 0 014 STREET SWEEPING LS 3,000.0000 3,000.00 0.300 900.00 0.300 900 015 TEMPORARY CONCRETE WASHOUT LS 3,500.0000 3,500.00 0.300 1,050.00 0.300 1,050 016 ROADWAY EXCAVATION (TYPE Y-1) CY 70.0000 35,000.00 310.000 21,700.00 310.000 21,700 (AERIALLY DEPOSITED LEAD) 017 DITCH EXCAVATION CY 70.0000 280.00 4.000 280.00 4.000 280 018 ROADSIDE CLEARING LS 34,000.0000 34,000.00 0.500 17,000.00 0.500 17,000 019 ROCK BLANKET SQFT 8.0000 58,400.00 0.000 0 020 MAINTAIN EXISTING PLANTED AREAS LS 16,000.0000 16,000.00 0.200 3,200.00 0.200 3,200 021 DECOMPOSED GRANITE SQFT 1.5000 7,050.00 0.000 0 022 GRAVEL MULCH SQFT 1.7000 51,170.00 19,840.000 33,728.00 19,840.000 33,728 PROGRAM CAS145 PAGE 2 DATE 04/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J6404 TIME 08:50 AM ESTIMATE NO. 001 BID OPENING 10/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/15 R.E. NAME: EMAM, KAMRAN DATE OF THIS ESTIMATE 04/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CHECK AND TEST EXISTING IRRIGATION LS 16,000.0000 16,000.00 1.000 16,000.00 1.000 16,000 FACILITIES 024 OPERATE EXISTING IRRIGATION FACILITIES LS 11,500.0000 11,500.00 0.000 0 025 CONTROL AND NEUTRAL CONDUCTORS LS 15,500.0000 15,500.00 0.000 0 026 12 STATION IRRIGATION CONTROLLER EA 14,500.0000 14,500.00 0.000 0 (WALL MOUNTED) 027 24-32 STATION IRRIGATION CONTROLLER EA 17,500.0000 17,500.00 0.000 0 (WALL MOUNTED) 028 48 STATION IRRIGATION CONTROLLER EA 19,000.0000 19,000.00 0.000 0 (WALL MOUNTED) 029 CERTIFY EXISTING BACKFLOW PREVENTERS LS 2,200.0000 2,200.00 0.000 0 030 2" GATE VALVE EA 550.0000 1,100.00 0.000 0 031 2" PLASTIC PIPE (CLASS 315) LF 16.0000 7,200.00 0.000 0 (F) (SUPPLY LINE) 032 10" WELDED STEEL PIPE CONDUIT LF 150.0000 16,500.00 110.000 16,500.00 110.000 16,500 033 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,600.0000 9,600.00 0.000 0 034 EROSION CONTROL (DRY SEED) (SQFT) SQFT 0.0900 60,030.00 0.000 0 035 EROSION CONTROL (BONDED FIBER MATRIX) SQFT 0.0900 60,030.00 0.000 0 (SQFT) 036 COMPOST SQFT 0.1600 106,720.00 0.000 0 037 ROADSIDE PAVING (MISCELLANEOUS AREAS) SQYD 105.0000 28,350.00 0.000 0 038 CONCRETE (DITCH LINING) CY 1,200.0000 2,400.00 2.000 2,400.00 2.000 2,400 039 SLOPE PAVING (CONCRETE) CY 550.0000 121,000.00 180.000 99,000.00 180.000 99,000 040 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 200.0000 200.00 0.300 60.00 0.300 60 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 04/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J6404 TIME 08:50 AM ESTIMATE NO. 001 BID OPENING 10/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/15 R.E. NAME: EMAM, KAMRAN DATE OF THIS ESTIMATE 04/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 251,468.00 251,468.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 251,468.00 251,468.00 041 MOBILIZATION LS 90,000.0000 90,000.00 0.950 85,500.00 0.950 85,500 ORIGINAL CONTRACT AMOUNT 950,295.00 TOTAL WORK COMPLETED 336,968.00 336,968.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 336,968.00 336,968.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/29/15 120 03/30/15 02/13/15 08/06/15 43 2 0 0 37% 36% PROGRESS IS SATISFACTORY EMAM, KAMRAN RESIDENT ENGINEER PROGRAM CAS145 DATE 04/23/15