PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/24/09 EST. NO.02 TIME 08:19 AM R.E. NAME: HAMIDI, FRED 12-0J9804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/24/09 EST. NO.02 TIME 08:19 AM R.E. NAME: HAMIDI, FRED 12-0J9804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J9804 TIME 08:19 AM ESTIMATE NO. 02 BID OPENING 05/14/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/09 R.E. NAME: HAMIDI, FRED DATE OF THIS ESTIMATE 09/24/09 LOCATION PROGRESS ESTIMATE 12-ORA-405-16.5/17.9 ----------------- PETERSON-CHASE ENGINEERING IN ORANGE COUNTY IN HUNTINGTON 1792 KAISER AVE BEACH AND WESTMINSTER FROM IRVINE, CA 926145706 ROUTE 405/39 SEPARATION TO GOLDEN WEST STREET OVERCROSSING FED. AID NO. N O N E REPLACE BROKEN SLABS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH) LS 800.0000 800.00 1.000 800.00 1.000 800.00 02 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 500.00 0.000 0.00 03 CONSTRUCTION SITE MANAGEMENT LS 800.0000 800.00 1.000 800.00 1.000 800.00 04 PREPARE WATER POLLUTION CONTROL LS 800.0000 800.00 1.000 800.00 1.000 800.00 PROGRAM 05 TEMPORARY GRAVEL BAG BERM LF 3.0000 750.00 0.000 0.00 06 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 400.00 0.000 0.00 07 STREET SWEEPING LS 500.0000 500.00 0.500 250.00 0.500 250.00 08 TEMPORARY CONCRETE WASHOUT BIN EA 500.0000 500.00 1.000 500.00 1.000 500.00 09 CONSTRUCTION AREA SIGNS LS 1,100.0000 1,100.00 0.500 550.00 10 TRAFFIC CONTROL SYSTEM LS 14,000.0000 14,000.00 0.500 7,000.00 0.500 7,000.00 11 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.6000 4,512.00 0.000 0.00 12 PORTABLE CHANGEABLE MESSAGE SIGN LS 700.0000 700.00 0.500 350.00 0.500 350.00 13 REMOVE PAVEMENT MARKER EA 1.1000 682.00 0.000 0.00 14 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.6000 29,256.00 0.000 0.00 15 HOT MIX ASPHALT (TYPE A) TON 105.0000 109,200.00 0.000 0.00 16 TACK COAT TON 275.0000 1,375.00 0.000 0.00 17 REPLACE CONCRETE PAVEMENT CY 710.0000 99,400.00 130.000 92,300.00 130.000 92,300.00 (RAPID STRENGTH CONCRETE) 18 DOWEL BAR (DRILL AND BOND) EA 25.0000 10,000.00 160.000 4,000.00 160.000 4,000.00 19 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 2,354.00 0.000 0.00 20 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.2000 1,430.00 0.000 0.00 21 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 4,192.00 0.000 0.00 (BROKEN 36-12) 22 PAINT TRAFFIC STRIPE (2-COAT) LF 5.5000 1,650.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 09/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J9804 TIME 08:19 AM ESTIMATE NO. 02 BID OPENING 05/14/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/09 R.E. NAME: HAMIDI, FRED DATE OF THIS ESTIMATE 09/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PAVEMENT MARKER (NON-REFLECTIVE) EA 6.0000 1,980.00 0.000 0.00 24 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 540.00 0.000 0.00 25 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 600.0000 600.00 0.500 300.00 0.500 300.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 09/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0J9804 TIME 08:19 AM ESTIMATE NO. 02 BID OPENING 05/14/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/09 R.E. NAME: HAMIDI, FRED DATE OF THIS ESTIMATE 09/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 107,100.00 107,650.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 107,100.00 107,650.00 ORIGINAL CONTRACT AMOUNT 288,021.00 TOTAL WORK COMPLETED 107,100.00 107,650.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 107,100.00 107,650.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/24/09 90 00/00/00 07/09/09 11/17/09 51 0 0 0 37% 57% PROGRESS IS SATISFACTORY HAMIDI, FRED RESIDENT ENGINEER PROGRAM CAS145 DATE 09/24/09