PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/24/13 EST. NO.01 TIME 02:21 PM R.E. NAME: CHAUDRY, MONAS 12-0M1604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/24/13 EST. NO.01 TIME 02:21 PM R.E. NAME: CHAUDRY, MONAS 12-0M1604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/24/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M1604 TIME 02:21 PM ESTIMATE NO. 01 BID OPENING 05/18/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 01/24/13 LOCATION PROGRESS ESTIMATE 12-ORA-57-13.4/14.8 ----------------- VAP CONSTRUCTION INC IN ORANGE COUNTY IN ANAHEIM AT 16425 ILLUSION WAY BALL RD OC AND AT LINCOLN AVE OC LA MIRADA CA 90638 FED. AID NO. ACNH-P057(57)E ADA IMPROVEMENTS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 002 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 750.00 5.000 750.00 5.000 750 004 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 1.000 1,000 005 CONSTRUCTION AREA SIGNS LS 9,999.0000 9,999.00 0.500 4,999.50 0.500 4,999 006 TRAFFIC CONTROL SYSTEM LS 34,750.0000 34,750.00 0.500 17,375.00 0.500 17,375 007 TYPE III BARRICADE EA 100.0000 3,200.00 0.000 0 008 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,000.0000 3,000.00 0.500 1,500.00 0.500 1,500 009 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 990.00 0.000 0 010 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 3,000.00 0.000 0 011 REMOVE PAVEMENT MARKER EA 2.0000 56.00 0.000 0 012 REMOVE ROADSIDE SIGN PANEL EA 300.0000 1,500.00 0.000 0 013 RELOCATE ROADSIDE SIGN EA 750.0000 750.00 0.000 0 014 REMOVE CONCRETE CY 275.0000 27,500.00 100.000 27,500.00 100.000 27,500 015 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 0.000 0 016 ROADWAY EXCAVATION CY 350.0000 5,600.00 0.000 0 017 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.000 0 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 5,550.00 0.000 0 (0.063"-UNFRAMED) 019 ROADSIDE SIGN - ONE POST EA 350.0000 3,500.00 0.000 0 020 INSTALL ROADSIDE SIGN PANEL ON EA 50.0000 250.00 0.000 0 EXISTING POST 021 MINOR CONCRETE (MISCELLANEOUS CY 425.0000 46,750.00 110.000 46,750.00 110.000 46,750 CONSTRUCTION) 022 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 5,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 01/24/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M1604 TIME 02:21 PM ESTIMATE NO. 01 BID OPENING 05/18/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 01/24/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 990.00 0.000 0 (SPRAYABLE) 024 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 560.00 0.000 0 025 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 026 MODIFY SIGNAL (LOCATION 1) LS 39,000.0000 39,000.00 0.200 7,800.00 0.200 7,800 027 MODIFY SIGNAL (LOCATION 2) LS 28,500.0000 28,500.00 0.200 5,700.00 0.200 5,700 028 MODIFY SIGNAL (LOCATION 3) LS 12,500.0000 12,500.00 0.500 6,250.00 0.500 6,250 029 MODIFY SIGNAL (LOCATION 4) LS 6,500.0000 6,500.00 0.800 5,200.00 0.800 5,200 PROGRAM CAS145 PAGE 3 DATE 01/24/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M1604 TIME 02:21 PM ESTIMATE NO. 01 BID OPENING 05/18/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: CHAUDRY, MONAS DATE OF THIS ESTIMATE 01/24/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 126,324.50 126,324.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 126,324.50 126,324.50 ORIGINAL CONTRACT AMOUNT 252,695.00 TOTAL WORK COMPLETED 126,324.50 126,324.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 126,324.50 126,324.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/05/12 30 12/18/12 12/18/12 02/19/13 11 0 0 0 50% 37% PROGRESS IS SATISFACTORY CHAUDRY, MONAS RESIDENT ENGINEER PROGRAM CAS145 DATE 01/24/13