PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/24/25 EST. NO. 026 TIME 03:09 PM R.E. NAME: MERATI, ARTIN 12-0M82C4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 007 0004 99,278.66 E.W. @ L.S.(+) 050325 N 4 017 0001 238,394.89 A.C. @ L.S.(+) 043025 N 1 337,673.55 TOTAL THIS ESTIMATE 384,456.10 TOTAL PREVIOUS ESTIMATE 722,129.65 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/24/25 EST. NO. 026 TIME 03:09 PM R.E. NAME: MERATI, ARTIN 12-0M82C4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CEM 4401 CY 2022 -10,000.00 002 CEM 4401 CY 2022 10,000.00 003 CEM 4401 CY 2023 -10,000.00 014 CEM 4401 CY 23 10,000.00 016 CEM 4401 CY 2024 -10,000.00 023 CEM 4401 CY 2024 10,000.00 024 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 05/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M82C4 TIME 03:09 PM ESTIMATE NO. 026 BID OPENING 12/13/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/25 R.E. NAME: MERATI, ARTIN DATE OF THIS ESTIMATE 05/24/25 LOCATION PROGRESS ESTIMATE 12-ORA-1-7.9/10.5 ----------------- SULLY-MILLER CONTRACTING CO. IN ORANGE COUNTY IN LAGUNA BEACH, 135 S STATE COLLEGE BLVD #400 ON STATE ROUTE 1 (ALSO KNOWN AS BREA CA 92821 PACIFIC COAST HIGHWAY OR SR-1) FROM RUBY STREET (PM 7.9) TO LEDROIT STREET (PM 10.5) FED. AID NO. ANCH-P001(673)E LAGUNA BEACH PAVING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 0.0000 0.00 0.000 0 002 TIME-RELATED OVERHEAD (WDAY) WDAY 3,200.0000 1,280,000.00 14.000 44,800.00 399.000 1,276,800 003 TRENCH PLATE LS 111,000.0000 111,000.00 1.000 111,000 004 TRAFFIC CONTROL SYSTEM LS 1,075,072.0000 1,075,072.00 1.000 1,075,072 005 FLASHING ARROW SIGN EA 594.9200 38,669.80 65.000 38,669 006 TYPE II BARRICADE EA 35.0000 60,725.00 1,735.000 60,725 007 TYPE III BARRICADE EA 100.0000 4,200.00 42.000 4,200 008 CHANNELIZER (SURFACE MOUNTED) EA 32.5000 165,100.00 5,080.000 165,100 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 109,880.5700 109,880.57 1.000 109,880 010 JOB SITE MANAGEMENT LS 187,500.0000 187,500.00 1.000 187,500 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 0.0000 0.00 0.000 0 012 TEMPORARY DRAINAGE INLET PROTECTION EA 400.0000 23,200.00 58.000 23,200 013 TEMPORARY CONCRETE WASHOUT LS 118,500.0000 118,500.00 1.000 118,500 014 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.1000 16,060.00 19,952.000 21,947 STRIPE (HAZARDOUS WASTE) 015 TREATED WOOD WASTE LB 0.0700 42.70 0.000 0 016 REMOVE CONCRETE (CY) CY 325.0000 493,935.00 1,591.910 517,370 017 REMOVE TREE EA 1,800.0000 3,600.00 3.000 5,400 018 SALVAGE BENCH EA 1,400.0000 9,800.00 7.000 9,800 019 SALVAGE TRASH CONTAINER EA 520.0000 9,880.00 18.000 9,360 020 REMOVE PARKING METER POST EA 100.0000 8,300.00 83.000 8,300 021 CLEARING AND GRUBBING (LS) LS 62,500.0000 62,500.00 1.000 62,500 022 ROADWAY EXCAVATION CY 175.0000 59,150.00 379.900 66,482 PROGRAM CAS145 PAGE 2 DATE 05/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M82C4 TIME 03:09 PM ESTIMATE NO. 026 BID OPENING 12/13/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/25 R.E. NAME: MERATI, ARTIN DATE OF THIS ESTIMATE 05/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADWAY EXCAVATION (TYPE R-1) CY 250.0000 45,000.00 169.000 42,250 (AERIALLY DEPOSITED LEAD) 024 STRUCTURE BACKFILL (SLURRY CEMENT) CY 3,244.8000 6,489.60 2.100 6,814 (F) 025 IMPORTED BORROW (CY) CY 115.0000 48,300.00 263.660 30,320 026 ROCK BLANKET SQFT 50.0000 19,500.00 257.000 12,850 027 FINISHING ROADWAY LS 150,000.0000 150,000.00 1.000 150,000 028 CLASS 2 AGGREGATE BASE (CY) CY 230.0000 275,724.00 1,209.000 278,070 029 PRIME COAT TON 1,500.0000 7,500.00 2.620 3,930 030 HOT MIX ASPHALT (TYPE A) TON 195.0000 430,833.00 2,559.230 499,049 031 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 155.0000 2,247,500.00 12,042.190 1,866,539 032 TACK COAT TON 929.7300 24,637.85 21.180 19,691 033 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 220.0000 209,000.00 1,018.960 224,171 034 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 6.0000 666,000.00 103,038.000 618,228 035 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 52.0000 234,520.00 2,042.100 106,189 036 STRUCTURAL CONCRETE, DRAINAGE INLET CY 4,890.0000 326,652.00 66.800 326,652 (F) 037 MINOR CONCRETE CY 16,568.0000 49,704.00 3.000 49,704 (F) 038 MINOR CONCRETE (MINOR STRUCTURE) CY 1,350.0000 83,700.00 61.300 82,755 (F) 039 CONCRETE DRIVEWAY (RSC) CY 1,300.0000 151,320.00 178.900 232,570 (F) 040 CONCRETE CROSS GUTTER (RSC) CY 1,300.0000 265,980.00 194.000 252,200 (F) 041 12" ALTERNATIVE PIPE CULVERT LF 450.0000 112,455.00 224.000 100,800 042 18" REINFORCED CONCRETE PIPE LF 520.0000 195,520.00 375.000 195,000 043 24" REINFORCED CONCRETE PIPE LF 588.2900 264,730.50 442.000 260,024 044 6" PLASTIC PIPE (DRAIN) LF 72.6600 1,089.90 15.000 1,089 045 4" PLASTIC PIPE (DRAIN) LF 70.9300 27,946.42 359.000 25,463 046 DRAINAGE INLET MARKER EA 167.6200 6,537.18 0.000 0 047 24" PRECAST CONCRETE PIPE MANHOLE LF 1,205.0000 9,640.00 8.000 9,640 048 36" PRECAST CONCRETE PIPE MANHOLE LF 1,900.0000 15,200.00 8.000 15,200 049 ABANDON PIPELINE EA 8,149.1700 16,298.34 2.000 16,298 PROGRAM CAS145 PAGE 3 DATE 05/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M82C4 TIME 03:09 PM ESTIMATE NO. 026 BID OPENING 12/13/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/25 R.E. NAME: MERATI, ARTIN DATE OF THIS ESTIMATE 05/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE PIPE (LF) LF 145.2200 20,330.80 122.000 17,716 051 REMOVE INLET EA 1,624.6400 25,994.24 21.000 34,117 052 REMOVE DRAINAGE JUNCTION STRUCTURE EA 3,016.7700 3,016.77 1.000 3,016 053 ADJUST FRAME AND COVER TO GRADE EA 2,800.0000 8,400.00 2.000 5,600 054 DETECTABLE WARNING SURFACE SQFT 34.5300 52,872.34 1,565.000 54,039 055 MINOR CONCRETE (MISCELLANEOUS CY 680.0000 895,968.00 1,352.000 919,360 CONSTRUCTION) 056 MINOR CONCRETE (STAMPED CONCRETE) SQFT 90.0000 10,800.00 0.000 0 057 FLAGSTONE SQFT 184.0000 5,520.00 30.000 5,520 058 BRICK BAND SQFT 55.0000 18,150.00 384.000 21,120 059 BRICK BAND (TREE WELL) SQFT 96.0000 8,832.00 74.000 7,104 060 ADJUST PAVERS TO GRADE SQFT 47.0000 22,090.00 524.000 24,628 061 PRE/POST CONSTRUCTION SURVEYS EA 2,000.0000 296,000.00 74.000 148,000 062 MISCELLANEOUS IRON AND STEEL LB 4.9800 39,506.34 7,933.000 39,506 (F) 063 MANHOLE FRAME AND COVER EA 995.0000 8,955.00 6.000 5,970 064 HAND RAILING LF 215.0000 46,225.00 188.000 40,420 (F) 065 PARKING METER POST EA 378.0000 26,460.00 61.000 23,058 066 ADJUST ACCESS BOX FRAME AND COVER EA 500.0000 95,000.00 219.000 109,500 (UTILITY) 067 ADJUST MANHOLE FRAME AND COVER EA 1,500.0000 67,500.00 92.000 138,000 (UTILITY) 068 PAINT CURB (2-COAT) SQFT 3.0500 8,317.96 3,637.000 11,092 069 REMOVE PAVEMENT MARKER EA 2.7000 5,886.00 1,162.000 3,137 070 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0500 8,829.00 2,034.000 8,237 071 REMOVE ROADSIDE SIGN EA 275.0000 9,900.00 34.000 9,350 072 REMOVE ROADSIDE SIGN EA 110.0000 17,600.00 296.000 32,560 (STRAP AND SADDLE BRACKET METHOD) 073 REMOVE ROADSIDE SIGN PANEL EA 175.0000 19,250.00 106.000 18,550 074 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.7500 21,070.00 1,879.000 20,199 (0.063"-UNFRAMED) 075 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.2500 112.50 10.000 112 (0.080"-UNFRAMED) 076 METAL (ROADSIDE SIGN) LB 16.0000 10,400.00 531.000 8,496 PROGRAM CAS145 PAGE 4 DATE 05/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M82C4 TIME 03:09 PM ESTIMATE NO. 026 BID OPENING 12/13/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/25 R.E. NAME: MERATI, ARTIN DATE OF THIS ESTIMATE 05/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 ROADSIDE SIGN - ONE POST EA 500.0000 5,000.00 8.000 4,000 078 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 125.5000 18,750.00 129.000 16,189 METHOD) 079 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 410.0000 16,400.00 37.000 15,170 080 INSTALL ROADSIDE SIGN PANEL ON EA 215.0000 14,835.00 67.000 14,405 EXISTING POST 081 INSTALL SIGN PANEL ON EXISTING EA 155.0000 6,510.00 40.000 6,200 PEDESTRIAN BARRICADE 082 THERMOPLASTIC PAVEMENT MARKING SQFT 4.9000 144,550.00 20,896.000 102,390 (ENHANCED WET NIGHT VISIBILITY) 083 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9200 368.00 263.000 241 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 084 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9200 15,456.00 16,424.000 15,110 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 085 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9200 2,916.40 2,834.000 2,607 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 086 PAINT TRAFFIC STRIPE (2 COAT) LF 10.8000 766.80 0.000 0 (BLUE WITH WHITE NO PARKING STENCIL) 087 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 27,600.00 31,788.000 47,682 (ENHANCED WET NIGHT VISIBILITY) 088 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.9500 8,755.50 4,503.000 8,780 (ENHANCED WET NIGHT VISIBILITY) 089 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0600 32,754.00 15,900.000 32,754 090 LIGHTING SYSTEM LS 133,532.7000 133,532.70 1.000 133,532 091 TRAFFIC MONITORING STATION SYSTEM LS 93,306.8000 93,306.80 0.770 71,846 092 MODIFYING LIGHTING SYSTEMS LS 139,958.0000 139,958.00 0.851 119,104 093 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 838,329.1500 838,329.15 0.970 813,179 PROGRAM CAS145 PAGE 5 DATE 05/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M82C4 TIME 03:09 PM ESTIMATE NO. 026 BID OPENING 12/13/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/25 R.E. NAME: MERATI, ARTIN DATE OF THIS ESTIMATE 05/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 44,800.00 12,408,915.56 ADJUSTMENT OF COMPENSATION 238,394.89 238,394.89 EXTRA WORK 99,278.66 483,734.76 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 382,473.55 13,131,045.21 094 MOBILIZATION LS 262,600.0000 262,500.00 1.000 262,500 ORIGINAL CONTRACT AMOUNT 13,244,167.15 TOTAL WORK COMPLETED 382,473.55 13,393,545.21 MATERIALS ON HAND ON SITE -95,596.00 0.00 DEDUCTIONS 0.00 0.00 TOTAL 286,877.55 13,393,545.21 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/13/22 400 01/23/23 01/23/23 05/22/25 399 178 0 0 93% 100% PROGRESS IS SATISFACTORY MERATI, ARTIN RESIDENT ENGINEER