PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/19 EST. NO. 015 TIME 10:20 AM R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. 12-0M9104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0010 3,284.31 E.W. @ F.A.(+) 040419 N CPE 10 0022 7,305.41 071719 N 0011.0 0023 278.37 073119 N 0015.0 0024 248.53 080219 N 0016.0 0025 1,067.22 071919 N 0012.0 0026 616.77 072319 N 0013.0 0027 343.21 073019 N 0014.0 002 0014 2,104.17 E.W. @ F.A.(+) 060319 N CPE140 0015 6,003.07 060419 N CPE150 0019 664.31 061019 N CPE200 0021 776.49 061719 N CPE210 0022 7,414.72 061819 N CPE220 003 0004 1,000.00 E.W. @ F.A.(+) 073019 N 0017.0 31,106.58 TOTAL THIS ESTIMATE 77,262.80 TOTAL PREVIOUS ESTIMATE 108,369.38 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/19 EST. NO. 015 TIME 10:20 AM R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. 12-0M9104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 10:20 AM ESTIMATE NO. 015 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 08/22/19 LOCATION RERUN PROGRESS ESTIMATE 12-ORA-90-0.6/8.0 ----------------------- PETERSON-CHASE GENERAL IN ORANGE COUNTY FROM LA HABRA ENGINEERING CONSTRUCTION, INC. HILLS DRIVE IN LA HABRA TO ROSE 16351 CONSTRUCTION CIRCLE WES DRIVE IN PLACENTIA IRVINE CA 92606 FED. AID NO. ACST-P090(15)E REPLACE CURB RAMPS & SIDEWALKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,570.0000 2,570.00 1.000 2,570 002 CONSTRUCTION AREA SIGNS LS 18,300.0000 18,300.00 0.560 10,248 003 TRAFFIC CONTROL SYSTEM LS 272,000.0000 272,000.00 0.800 217,600 004 TYPE II BARRICADE EA 60.0000 30,600.00 67.000 4,020 005 TYPE III BARRICADE EA 90.0000 28,800.00 64.000 5,760 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 33,600.0000 33,600.00 0.700 23,520 007 JOB SITE MANAGEMENT LS 7,500.0000 7,500.00 0.800 6,000 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 690.0000 690.00 1.000 690 009 TEMPORARY DRAINAGE INLET PROTECTION EA 106.0000 14,840.00 40.000 4,240 010 TEMPORARY CONCRETE WASHOUT LS 9,200.0000 9,200.00 0.800 7,360 011 TREATED WOOD WASTE LB 3.7400 224.40 0.000 0 012 REMOVE CONCRETE (CY) CY 245.0000 396,900.00 191.360 46,883.20 971.160 237,934 013 CLEARING AND GRUBBING (LS) LS 22,300.0000 22,300.00 0.000 0 014 ROADWAY EXCAVATION CY 240.0000 369,600.00 161.260 38,702.40 619.100 148,584 015 ROADWAY EXCAVATION (TYPE Z-2) CY 450.0000 9,450.00 0.000 0 (AERIALLY DEPOSITED LEAD) 016 CLASS 3 AGGREGATE SUBBASE CY 97.0000 117,370.00 126.620 12,282.14 387.280 37,566 017 LEAN CONCRETE BASE CY 440.0000 9,680.00 0.000 0 018 HOT MIX ASPHALT (TYPE A) TON 320.0000 230,400.00 107.500 34,400.00 579.560 185,459 019 TACK COAT TON 2,430.0000 3,888.00 0.050 121.50 0.650 1,579 020 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 200.0000 30,000.00 50.140 10,028.00 147.020 29,404 021 JOINTED PLAIN CONCRETE PAVEMENT CY 840.0000 15,960.00 0.000 0 (RSC) 022 DRILL AND BOND (DOWEL BAR) EA 92.0000 1,104.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 10:20 AM ESTIMATE NO. 015 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 08/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 57.0000 54,150.00 69.270 3,948.39 156.640 8,928 024 MINOR CONCRETE (MINOR STRUCTURE) CY 1,900.0000 19,000.00 3.140 5,966 (F) 025 4" PLASTIC PIPE LF 31.0000 2,046.00 8.000 248 026 GRATED LINE DRAIN LF 157.0000 36,110.00 69.500 10,911 027 REMOVE GRATED LINE DRAIN LF 10.3000 2,163.00 69.500 715 028 REMOVE PARKWAY CULVERT EA 310.0000 2,170.00 5.000 1,550 029 REMOVE PIPE (LF) LF 11.2000 593.60 0.000 0 030 REMOVE INLET EA 500.0000 500.00 1.000 500 031 ADJUST FRAME AND COVER TO GRADE EA 1,430.0000 20,020.00 3.000 4,290 032 ADJUST MANHOLE TO GRADE EA 1,440.0000 1,440.00 0.000 0 033 REMOVE CONCRETE (CHANNEL) CY 2,300.0000 690.00 0.000 0 034 DETECTABLE WARNING SURFACE SQFT 38.0000 85,500.00 97.600 3,708.80 993.400 37,749 035 MINOR CONCRETE (MISCELLANEOUS CY 356.0000 1,142,760.00 257.050 91,509.80 1,086.210 386,690 CONSTRUCTION) 036 MINOR CONCRETE (STAMPED CONCRETE) SQFT 8.0000 11,360.00 0.000 0 037 INTERLOCKING CONCRETE PAVERS SQYD 280.0000 42,000.00 33.700 9,436 038 PRE/POST CONSTRUCTION SURVEYS EA 106.0000 19,080.00 35.500 3,763 039 MISCELLANEOUS IRON AND STEEL LB 2.7500 247.50 90.000 247 (F) 040 PAVEMENT MARKER (RETROREFLECTIVE) EA 16.5000 198.00 0.000 0 041 REMOVE ROADSIDE SIGN (WOOD POST) EA 225.0000 450.00 0.000 0 042 REMOVE ROADSIDE SIGN (METAL POST) EA 225.0000 225.00 0.000 0 043 RESET ROADSIDE SIGN EA 140.0000 1,820.00 0.000 0 044 RELOCATE ROADSIDE SIGN EA 152.0000 912.00 0.000 0 045 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.9000 3,451.00 0.000 0 (0.063"-UNFRAMED) 046 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 8.3000 58.10 0.000 0 (0.063" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 047 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.7000 32.90 0.000 0 048 ROADSIDE SIGN - ONE POST EA 307.0000 614.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 10:20 AM ESTIMATE NO. 015 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 08/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 THERMOPLASTIC PAVEMENT MARKING SQFT 2.2000 23,320.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 050 6" THERMOPLASTIC TRAFFIC STRIPE LF 11.0000 528.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 051 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.1000 11,330.00 0.000 0 052 MODIFYING EXISTING ELECTRICAL SYSTEM LS 1,123,000.0000 1,123,000.00 0.100 112,300.00 0.800 898,400 PROGRAM CAS145 PAGE 4 DATE 08/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 10:20 AM ESTIMATE NO. 015 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 08/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 353,884.23 2,291,931.35 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 31,106.58 108,369.38 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 384,990.81 2,400,300.73 053 MOBILIZATION LS 147,000.0000 147,000.00 0.050 7,350.00 1.000 147,000 ORIGINAL CONTRACT AMOUNT 4,377,745.50 TOTAL WORK COMPLETED 392,340.81 2,547,300.73 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 392,340.81 2,547,300.73 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/09/18 350 02/26/18 02/26/18 09/04/19 340 32 0 0 60% 97% PROGRESS UNSATISFACTORY PIRZADEH, BEHROOZ/MIKE Z. RESIDENT ENGINEER PROGRAM CAS145 DATE 08/22/19