PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/19/19 EST. NO. 018 TIME 11:05 AM R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. 12-0M9104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0025 2,548.90 E.W. @ F.A.(+) 062719 N CPE250 2,548.90 TOTAL THIS ESTIMATE 123,367.84 TOTAL PREVIOUS ESTIMATE 125,916.74 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/19/19 EST. NO. 018 TIME 11:05 AM R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. 12-0M9104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 11:05 AM ESTIMATE NO. 018 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 11/19/19 LOCATION PROGRESS ESTIMATE 12-ORA-90-0.6/8.0 ----------------- PETERSON-CHASE GENERAL IN ORANGE COUNTY FROM LA HABRA ENGINEERING CONSTRUCTION, INC. HILLS DRIVE IN LA HABRA TO ROSE 16351 CONSTRUCTION CIRCLE WES DRIVE IN PLACENTIA IRVINE CA 92606 FED. AID NO. ACST-P090(15)E REPLACE CURB RAMPS & SIDEWALKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,570.0000 2,570.00 1.000 2,570 002 CONSTRUCTION AREA SIGNS LS 18,300.0000 18,300.00 0.560 10,248 003 TRAFFIC CONTROL SYSTEM LS 272,000.0000 272,000.00 0.800 217,600 004 TYPE II BARRICADE EA 60.0000 30,600.00 8.000 480.00 87.000 5,220 005 TYPE III BARRICADE EA 90.0000 28,800.00 10.000 900.00 84.000 7,560 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 33,600.0000 33,600.00 0.700 23,520 007 JOB SITE MANAGEMENT LS 7,500.0000 7,500.00 0.800 6,000 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 690.0000 690.00 1.000 690 009 TEMPORARY DRAINAGE INLET PROTECTION EA 106.0000 14,840.00 8.000 848.00 53.000 5,618 010 TEMPORARY CONCRETE WASHOUT LS 9,200.0000 9,200.00 0.800 7,360 011 TREATED WOOD WASTE LB 3.7400 224.40 0.000 0 012 REMOVE CONCRETE (CY) CY 245.0000 396,900.00 219.400 53,753.00 1,625.010 398,127 013 CLEARING AND GRUBBING (LS) LS 22,300.0000 22,300.00 0.750 16,725.00 0.750 16,725 014 ROADWAY EXCAVATION CY 240.0000 369,600.00 205.140 49,233.60 1,443.640 346,473 015 ROADWAY EXCAVATION (TYPE Z-2) CY 450.0000 9,450.00 0.000 0 (AERIALLY DEPOSITED LEAD) 016 CLASS 3 AGGREGATE SUBBASE CY 97.0000 117,370.00 124.800 12,105.60 764.880 74,193 017 LEAN CONCRETE BASE CY 440.0000 9,680.00 3.600 1,584 018 HOT MIX ASPHALT (TYPE A) TON 320.0000 230,400.00 72.330 23,145.60 938.450 300,304 019 TACK COAT TON 2,430.0000 3,888.00 0.750 1,822 020 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 200.0000 30,000.00 6.800 1,360.00 226.260 45,252 021 JOINTED PLAIN CONCRETE PAVEMENT CY 840.0000 15,960.00 0.000 0 (RSC) 022 DRILL AND BOND (DOWEL BAR) EA 92.0000 1,104.00 12.000 1,104.00 12.000 1,104 PROGRAM CAS145 PAGE 2 DATE 11/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 11:05 AM ESTIMATE NO. 018 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 11/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 57.0000 54,150.00 276.000 15,732.00 461.440 26,302 024 MINOR CONCRETE (MINOR STRUCTURE) CY 1,900.0000 19,000.00 4.540 8,626 (F) 025 4" PLASTIC PIPE LF 31.0000 2,046.00 39.000 1,209.00 47.000 1,457 026 GRATED LINE DRAIN LF 157.0000 36,110.00 159.800 25,088.60 229.300 36,000 027 REMOVE GRATED LINE DRAIN LF 10.3000 2,163.00 69.500 715 028 REMOVE PARKWAY CULVERT EA 310.0000 2,170.00 6.000 1,860 029 REMOVE PIPE (LF) LF 11.2000 593.60 48.000 537.60 48.000 537 030 REMOVE INLET EA 500.0000 500.00 1.000 500 031 ADJUST FRAME AND COVER TO GRADE EA 1,430.0000 20,020.00 1.000 1,430.00 5.000 7,150 032 ADJUST MANHOLE TO GRADE EA 1,440.0000 1,440.00 0.000 0 033 REMOVE CONCRETE (CHANNEL) CY 2,300.0000 690.00 0.000 0 034 DETECTABLE WARNING SURFACE SQFT 38.0000 85,500.00 114.000 4,332.00 1,507.300 57,277 035 MINOR CONCRETE (MISCELLANEOUS CY 356.0000 1,142,760.00 227.100 80,847.60 1,726.360 614,584 CONSTRUCTION) 036 MINOR CONCRETE (STAMPED CONCRETE) SQFT 8.0000 11,360.00 2,494.420 19,955.36 3,902.420 31,219 037 INTERLOCKING CONCRETE PAVERS SQYD 280.0000 42,000.00 78.400 21,952 038 PRE/POST CONSTRUCTION SURVEYS EA 106.0000 19,080.00 35.500 3,763 039 MISCELLANEOUS IRON AND STEEL LB 2.7500 247.50 90.000 247 (F) 040 PAVEMENT MARKER (RETROREFLECTIVE) EA 16.5000 198.00 0.000 0 041 REMOVE ROADSIDE SIGN (WOOD POST) EA 225.0000 450.00 0.000 0 042 REMOVE ROADSIDE SIGN (METAL POST) EA 225.0000 225.00 0.000 0 043 RESET ROADSIDE SIGN EA 140.0000 1,820.00 0.000 0 044 RELOCATE ROADSIDE SIGN EA 152.0000 912.00 0.000 0 045 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.9000 3,451.00 0.000 0 (0.063"-UNFRAMED) 046 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 8.3000 58.10 0.000 0 (0.063" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 047 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.7000 32.90 0.000 0 048 ROADSIDE SIGN - ONE POST EA 307.0000 614.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 11/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 11:05 AM ESTIMATE NO. 018 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 11/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 THERMOPLASTIC PAVEMENT MARKING SQFT 2.2000 23,320.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 050 6" THERMOPLASTIC TRAFFIC STRIPE LF 11.0000 528.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 051 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.1000 11,330.00 0.000 0 052 MODIFYING EXISTING ELECTRICAL SYSTEM LS 1,123,000.0000 1,123,000.00 0.800 898,400 PROGRAM CAS145 PAGE 4 DATE 11/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0M9104 TIME 11:05 AM ESTIMATE NO. 018 BID OPENING 10/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/19 R.E. NAME: PIRZADEH, BEHROOZ/MIKE Z. DATE OF THIS ESTIMATE 11/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 308,786.96 3,182,563.96 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,548.90 125,916.74 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 311,335.86 3,308,480.70 053 MOBILIZATION LS 147,000.0000 147,000.00 1.000 147,000 ORIGINAL CONTRACT AMOUNT 4,377,745.50 TOTAL WORK COMPLETED 311,335.86 3,455,480.70 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 311,335.86 3,455,480.70 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/09/18 350 02/26/18 02/26/18 11/25/19 346 88 0 0 79% 99% PROGRESS UNSATISFACTORY PIRZADEH, BEHROOZ/MIKE Z. RESIDENT ENGINEER PROGRAM CAS145 DATE 11/19/19