PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/21/20 EST. NO. 004 TIME 03:30 PM R.E. NAME: SIDHU, GAGANDEEP 12-0N6304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/21/20 EST. NO. 004 TIME 03:30 PM R.E. NAME: SIDHU, GAGANDEEP 12-0N6304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CEM 4401 CY 2019 -10,000.00 002 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 04/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N6304 TIME 03:30 PM ESTIMATE NO. 004 BID OPENING 05/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/20 R.E. NAME: SIDHU, GAGANDEEP DATE OF THIS ESTIMATE 04/21/20 LOCATION PROGRESS ESTIMATE 12-ORA-55-10.7/10.7 ----------------- CALPROMAX ENGINEERING INC. IN ORANGE COUNTY IN TUSTIN AT 4TH 650 N.ROSE DR.#186 STREET OFF-RAMP PLACENTIA CA 92870 FED. AID NO. SNHG-P055(61)E MODIFY SIGNAL & LEFT TURN ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 CONSTRUCTION AREA SIGNS LS 12,000.0000 12,000.00 0.500 6,000 003 TRAFFIC CONTROL SYSTEM LS 14,000.0000 14,000.00 0.200 2,800.00 0.700 9,800 004 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 1,200.0000 1,200.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,000.0000 7,000.00 0.000 0 006 JOB SITE MANAGEMENT LS 1,200.0000 1,200.00 0.000 0 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,200.0000 1,200.00 1.000 1,200 008 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 1,400.00 1.000 350 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 6.0000 5,760.00 0.000 0 STRIPE (HAZARDOUS WASTE) 010 TREATED WOOD WASTE LB 2.3000 3,611.00 0.000 0 011 REMOVE CONCRETE (CY) CY 290.0000 6,380.00 0.000 0 012 ROADWAY EXCAVATION CY 460.0000 1,380.00 0.000 0 013 HOT MIX ASPHALT (TYPE A) TON 4,600.0000 2,300.00 0.000 0 014 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 290.0000 870.00 0.000 0 015 DETECTABLE WARNING SURFACE SQFT 30.0000 1,800.00 0.000 0 016 MINOR CONCRETE (MISCELLANEOUS CY 600.0000 21,600.00 0.000 0 CONSTRUCTION) 017 PRE/POST CONSTRUCTION SURVEYS EA 2,875.0000 11,500.00 2.000 5,750 018 REMOVE PAVEMENT MARKER EA 4.0000 760.00 0.000 0 019 REMOVE DELINEATOR EA 115.0000 460.00 0.000 0 020 PAVEMENT MARKER (RETROREFLECTIVE) EA 8.0000 1,520.00 0.000 0 021 DELINEATOR (CLASS 1) EA 60.0000 660.00 0.000 0 022 REMOVE ROADSIDE SIGN EA 230.0000 3,220.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N6304 TIME 03:30 PM ESTIMATE NO. 004 BID OPENING 05/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/20 R.E. NAME: SIDHU, GAGANDEEP DATE OF THIS ESTIMATE 04/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE ROADSIDE SIGN EA 115.0000 575.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 024 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 4.0000 276.00 0.000 0 (0.063"-UNFRAMED) 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 7.0000 378.00 0.000 0 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 026 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 8.0000 616.00 0.000 0 (0.080"-UNFRAMED) 027 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.0000 714.00 0.000 0 (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 028 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.0000 920.00 0.000 0 (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 029 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 11.0000 1,760.00 0.000 0 030 ROADSIDE SIGN - ONE POST EA 350.0000 2,450.00 0.000 0 031 ROADSIDE SIGN - TWO POST EA 460.0000 3,220.00 0.000 0 032 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 230.0000 1,150.00 0.000 0 METHOD) 033 INSTALL ROADSIDE SIGN PANEL ON EA 230.0000 230.00 0.000 0 EXISTING POST 034 FURNISH LAMINATED WOOD BOX POST (TYPE M) EA 1,500.0000 3,000.00 2.000 3,000 035 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 330.00 0.000 0 036 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 445.00 0.000 0 (BROKEN 17-7) 037 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 150.00 0.000 0 038 THERMOPLASTIC PAVEMENT MARKING SQFT 4.5000 1,935.00 0.000 0 039 THERMOPLASTIC PAVEMENT MARKING SQFT 8.0000 6,160.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 040 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 360.00 0.000 0 (BROKEN 6-1) 041 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,790.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 042 PAINT TRAFFIC STRIPE (2-COAT) LF 2.0000 1,400.00 0.000 0 043 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.3000 2,951.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 044 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 400.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 045 REMOVE PAINTED TRAFFIC STRIPE LF 1.0000 38.00 0.000 0 046 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,950.00 0.000 0 047 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.5000 2,600.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N6304 TIME 03:30 PM ESTIMATE NO. 004 BID OPENING 05/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/20 R.E. NAME: SIDHU, GAGANDEEP DATE OF THIS ESTIMATE 04/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 048 MODIFYING EXISTING ELECTRICAL SYSTEM LS 260,000.0000 260,000.00 0.350 91,000.00 0.850 221,000 PROGRAM CAS145 PAGE 4 DATE 04/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N6304 TIME 03:30 PM ESTIMATE NO. 004 BID OPENING 05/15/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/20 R.E. NAME: SIDHU, GAGANDEEP DATE OF THIS ESTIMATE 04/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 93,800.00 249,600.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 93,800.00 249,600.00 049 MOBILIZATION LS 17,000.0000 17,000.00 0.050 850.00 1.000 17,000 ORIGINAL CONTRACT AMOUNT 415,119.00 TOTAL WORK COMPLETED 94,650.00 266,600.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -10,000.00 TOTAL 94,650.00 256,600.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/25/19 100 01/13/20 12/23/19 06/26/20 51 28 0 0 63% 51% PROGRESS IS SATISFACTORY SIDHU, GAGANDEEP RESIDENT ENGINEER PROGRAM CAS145 DATE 04/21/20