PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/23 EST. NO. 004 TIME 04:05 PM R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M 12-0N72A4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0009 7,975.01 E.W. @ F.A.(+) 041723 N 17 0 0012 4,894.25 041923 N 20 0 0013 3,392.68 042423 N 21 0 0023 5,510.12 050223 N 31 0 0024 1,428.71 050223 N 32 0 0025 1,428.71 050323 N 33 0 0026 17,543.44 050523 N 34 0 0027 12,872.94 040323 N 35 0 0028 14,350.94 040423 N 36 0 0029 15,620.77 040523 N 37 0 0031 8,338.15 040623 N 38 0 0032 14,685.77 040723 N 39 0 0034 9,002.40 050823 N 41 0 0035 1,428.71 050823 N 42 0 0036 12,870.24 050923 N 43 0 0037 1,679.78 050923 N 44 0 0041 1,715.12 051523 N 48 0 0042 1,679.78 051623 N 49 0 136,417.52 TOTAL THIS ESTIMATE 1,548,921.40 TOTAL PREVIOUS ESTIMATE 1,685,338.92 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/23 EST. NO. 004 TIME 04:05 PM R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M 12-0N72A4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N72A4 TIME 04:05 PM ESTIMATE NO. 004 BID OPENING 09/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M DATE OF THIS ESTIMATE 06/19/23 LOCATION PROGRESS ESTIMATE 12-ORA-73-10.0/R28.0 ----------------- CHUMO CONSTRUCTION INC IN ORA CO FROM 0.3 MILE SOUTH OF 14425 JOANBRIDGE STREET S73-S5 CONN VIADUCT IN SAN JUAN BALDWIN PARK CA 917061747 CAPISTRANO TO 0.1 MILE NORTH OF N73-N405 CONN OC IN COSTA MESA FED. AID NO. HSNH-P073(141)E UPGRADE SAFETY DEVICES, RELOCATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 0.0000 0.00 0.000 0 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,025.0000 5,025.00 0.250 1,256 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,250.0000 861,250.00 10.000 32,500.00 37.000 120,250 004 DEVELOP WATER SUPPLY LS 12,928.5000 12,928.50 0.080 1,034.28 0.240 3,102 005 CONSTRUCTION AREA SIGNS LS 68,000.0000 68,000.00 0.000 0 006 TRAFFIC CONTROL SYSTEM LS 1,718,020.0000 1,718,020.00 0.050 85,901.00 0.100 171,802 007 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 25,120.00 75.000 3,000.00 105.000 4,200 008 PORTABLE RADAR SPEED FEEDBACK SIGN EA 7,107.0000 49,749.00 2.000 14,214 SYSTEM DAY 009 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 12,875.0000 103,000.00 2.000 25,750 010 TEMPORARY RAILING (TYPE K) LF 9.0000 745,839.00 9,420.000 84,780.00 16,120.000 145,080 011 TEMPORARY CRASH CUSHION MODULE EA 180.0000 183,060.00 84.000 15,120.00 98.000 17,640 012 TEMPORARY ALTERNATIVE CRASH EA 4,538.0000 58,994.00 3.000 13,614.00 3.000 13,614 CUSHION 013 TEMPORARY TRAFFIC SCREEN LF 2.0000 104,994.00 0.000 0 014 TEMPORARY RADAR SPEED FEEDBACK EA 8,033.0000 48,198.00 0.000 0 SIGN SYSTEM 015 JOB SITE MANAGEMENT LS 42,479.6000 42,479.60 0.050 2,123.98 0.150 6,371 016 PREPARE STORM WATER POLLUTION PREVENTION LS 3,000.0000 3,000.00 0.500 1,500 PLAN 017 RAIN EVENT ACTION PLAN EA 500.0000 15,000.00 4.000 2,000 018 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 6,000.00 0.000 0 019 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 020 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 44,000.00 4.000 800.00 12.000 2,400 021 TEMPORARY FIBER ROLL LF 3.6100 266,760.95 8,929.000 32,233 022 TEMPORARY CONSTRUCTION ENTRANCE EA 3,600.0000 14,400.00 1.000 3,600 PROGRAM CAS145 PAGE 2 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N72A4 TIME 04:05 PM ESTIMATE NO. 004 BID OPENING 09/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STREET SWEEPING LS 44,400.6000 44,400.60 0.050 2,220.03 0.050 2,220 024 TEMPORARY CONCRETE WASHOUT LS 21,600.2000 21,600.20 0.200 4,320.04 0.200 4,320 025 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 026 TREATED WOOD WASTE LB 0.4500 502,290.00 30,640.000 13,788.00 30,640.000 13,788 027 REMOVE CONCRETE (CY) CY 725.0000 5,075.00 0.000 0 028 REMOVE CONCRETE BLOCK WALL EA 2,612.0000 36,568.00 0.000 0 ENCLOSURE 029 REMOVE CONCRETE (MISCELLANEOUS) (SQFT) SQFT 53.0000 12,720.00 0.000 0 030 REMOVE TREE EA 1,000.0000 1,000.00 0.000 0 031 CLEARING AND GRUBBING (LS) LS 39,580.0500 39,580.05 0.070 2,770.60 0.690 27,310 032 ROADWAY EXCAVATION CY 110.0000 210,320.00 340.000 37,400.00 340.000 37,400 033 DITCH EXCAVATION CY 79.0000 20,540.00 0.000 0 034 IMPORTED BORROW (CY) CY 1.0000 390.00 0.000 0 035 RELOCATE IRRIGATION CONTROLLER EA 4,500.0000 9,000.00 0.000 0 036 REMOVE IRRIGATION FACILITY LS 3,250.0000 3,250.00 0.000 0 037 SALVAGE IRRIGATION FACILITY LS 3,250.0000 3,250.00 0.000 0 038 CONTROL AND NEUTRAL CONDUCTORS LS 1,200.0000 1,200.00 0.000 0 (ARMOR-CLAD) 039 HYDROMULCH SQFT 0.0400 16,080.00 0.000 0 040 HYDROSEED SQFT 0.1400 56,280.00 0.000 0 041 FINISHING ROADWAY LS 48,840.1500 48,840.15 0.000 0 042 CLASS 2 AGGREGATE BASE (CY) CY 130.6300 49,900.66 0.000 0 043 ASPHALT TREATED PERMEABLE BASE CY 600.0000 6,000.00 0.000 0 044 PRIME COAT TON 2,200.0000 4,400.00 0.000 0 045 HOT MIX ASPHALT (TYPE A) TON 278.6000 50,705.20 0.000 0 046 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 740.9100 8,150.01 0.000 0 047 HOT MIX ASPHALT-OPEN GRADED TON 476.0000 27,608.00 0.000 0 (OPEN GRADED FRICTION COURSE) 048 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 3.3500 21,875.50 0.000 0 049 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3.3500 119,260.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N72A4 TIME 04:05 PM ESTIMATE NO. 004 BID OPENING 09/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PLACE HOT MIX ASPHALT SQYD 92.0000 81,880.00 0.000 0 (MISCELLANEOUS AREA) 051 TACK COAT TON 1,800.0000 3,420.00 0.000 0 052 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 6.7300 10,498.80 0.000 0 053 REMOVE ASPHALT CONCRETE DIKE LF 5.0000 105,887.50 2,282.000 11,410.00 2,782.000 13,910 054 REMOVE BASE AND SURFACING CY 63.0000 32,130.00 0.000 0 055 CONCRETE ENCLOSURE WALL EA 15,878.0000 31,756.00 0.000 0 056 60" CAST-IN-DRILLED-HOLE CONCRETE LF 0.0000 0.00 0.000 0 PILE (SIGN FOUNDATION) 057 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,024.5200 359,010.52 0.000 0 (F) 058 MINOR CONCRETE (MINOR STRUCTURE) CY 2,837.2500 676,400.40 0.000 0 (F) 059 MINOR CONCRETE (BACKFILL) CY 424.0000 5,766.40 0.000 0 (F) 060 FURNISH SIGN STRUCTURE (TUBULAR) LB 0.0000 0.00 0.000 0 (F) 061 INSTALL SIGN STRUCTURE (TUBULAR) LB 0.0000 0.00 0.000 0 (F) 062 FURNISH SIGN STRUCTURE (TRUSS) LB 0.0000 0.00 0.000 0 (F) 063 INSTALL SIGN STRUCTURE (TRUSS) LB 0.0000 0.00 0.000 0 (F) 064 REMOVE SIGN STRUCTURE (EA) EA 0.0000 0.00 0.000 0 065 REMOVE RETAINING WALL (PORTION) (LF) LF 478.0000 10,516.00 0.000 0 066 18" REINFORCED CONCRETE PIPE LF 323.0000 55,588.30 0.000 0 067 24" REINFORCED CONCRETE PIPE LF 260.0000 388,128.00 0.000 0 068 36" BITUMINOUS COATED CORRUGATED STEEL LF 585.0000 5,850.00 0.000 0 PIPE (.138" THICK) 069 36" BITUMINOUS COATED CORRUGATED STEEL LF 872.0000 6,104.00 0.000 0 PIPE INLET (.138" THICK) 070 ABANDON CULVERT (LF) LF 66.0000 14,982.00 0.000 0 071 ABANDON INLET EA 1,167.0000 4,668.00 0.000 0 072 REMOVE OVERSIDE DRAIN EA 2,192.0000 2,192.00 0.000 0 073 REMOVE CULVERT (LF) LF 48.0000 5,616.00 0.000 0 074 REMOVE INLET EA 1,209.0000 18,135.00 0.000 0 075 REMOVE CONCRETE (CHANNEL) CY 377.0000 27,521.00 0.000 0 076 SAND BACKFILL CY 10.0000 19.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N72A4 TIME 04:05 PM ESTIMATE NO. 004 BID OPENING 09/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 CONCRETE (DITCH LINING) CY 1,110.0000 166,500.00 0.000 0 078 MISCELLANEOUS IRON AND STEEL LB 2.2500 59,386.50 0.000 0 (F) 079 GUARD RAILING DELINEATOR EA 27.0000 42,093.00 43.000 1,161.00 172.000 4,644 080 REMOVE ROADSIDE SIGN EA 110.0000 14,300.00 0.000 0 081 REMOVE ROADSIDE SIGN EA 80.0000 12,800.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 082 REMOVE ROADSIDE SIGN PANEL EA 45.0000 13,050.00 0.000 0 083 FURNISH LAMINATED PANEL SIGN SQFT 0.0000 0.00 0.000 0 (1"-TYPE A) FOR RETROREFLECTIVE SHEETING (TYPE XI) 084 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 30.0000 6,600.00 0.000 0 085 FURNISH LAMINATED PANEL SIGN SQFT 35.0000 11,550.00 0.000 0 (2 1/2"-TYPE B) 086 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.0000 22,320.00 0.000 0 (0.063"-UNFRAMED) 087 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 43,550.00 0.000 0 (0.080"-UNFRAMED) 088 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 24.0000 16,560.00 0.000 0 (0.063"-FRAMED) 089 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 58,000.00 0.000 0 (0.080"-FRAMED) 090 ROADSIDE SIGN - ONE POST EA 445.0000 53,400.00 0.000 0 091 ROADSIDE SIGN - TWO POST EA 805.0000 12,075.00 0.000 0 092 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 175.0000 28,000.00 0.000 0 METHOD) 093 INSTALL ROADSIDE SIGN PANEL ON EA 80.0000 24,000.00 0.000 0 EXISTING POST 094 INSTALL ROADSIDE SIGN EA 1,100.0000 4,400.00 0.000 0 (LAMINATED WOOD BOX POST) 095 FURNISH LAMINATED WOOD BOX POST EA 2,100.0000 16,800.00 0.000 0 (TYPE L) 096 MIDWEST GUARDRAIL SYSTEM LF 43.5000 1,352,806.50 2,012.500 87,543.75 5,437.500 236,531 097 MIDWEST GUARDRAIL SYSTEM (7' POST) LF 47.8000 413,326.60 1,700.000 81,260.00 2,437.500 116,512 098 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 49.9000 74,850.00 0.000 0 099 DOUBLE MIDWEST GUARDRAIL SYSTEM LF 54.0000 252,720.00 0.000 0 100 CABLE RAILING LF 289.0000 1,156.00 0.000 0 101 TRANSITION RAILING (TYPE WB-31) EA 4,990.0000 299,400.00 4.000 19,960 102 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N72A4 TIME 04:05 PM ESTIMATE NO. 004 BID OPENING 09/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 103 END CAP (TYPE A) EA 490.0000 11,270.00 2.000 980 104 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,250.0000 58,750.00 3.000 3,750 105 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,750.0000 204,250.00 5.000 23,750 106 SEVERE-DUTY CRASH CUSHION EA 45,219.8300 1,582,694.05 0.000 0 107 CONCRETE BARRIER (TYPE 60M) LF 364.4600 21,503.14 0.000 0 (MOD) 108 CONCRETE BARRIER (TYPE 60MF) LF 379.4500 189,725.00 0.000 0 (MOD) 109 CONCRETE BARRIER (TYPE 60M) LF 155.1900 1,752,250.29 1,701.000 263,978 110 CONCRETE BARRIER (TYPE 60MC) LF 179.4700 229,721.60 0.000 0 111 CONCRETE BARRIER (TYPE 60MD) LF 234.2500 12,181.00 0.000 0 112 CONCRETE BARRIER (TYPE 60MF) LF 398.7300 142,745.34 0.000 0 113 PORTABLE CONCRETE BARRIER (TYPE 60K) LF 113.0000 61,020.00 0.000 0 114 REMOVE GUARDRAIL LF 5.5000 267,896.75 7,286.500 40,075.75 11,615.000 63,882 115 SALVAGE CONCRETE BARRIER (TYPE K) LF 12.0000 6,960.00 0.000 0 116 REMOVE CONCRETE BARRIER LF 49.0000 128,772.00 0.000 0 117 REMOVE CRASH CUSHION EA 1,000.0000 1,000.00 0.000 0 118 REMOVE CRASH CUSHION ATTENUATOR EA 2,000.0000 6,000.00 0.000 0 119 THERMOPLASTIC PAVEMENT MARKING SQFT 5.5000 41,690.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 120 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 11,900.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 121 PAINT TRAFFIC STRIPE (2-COAT) LF 1.0000 16,700.00 12,284.000 12,284.00 12,284.000 12,284 122 PAINT PAVEMENT MARKING (2-COAT) SQFT 6.0000 7,560.00 378.000 2,268.00 378.000 2,268 123 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 111,000.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 124 8" THERMOPLASTIC TRAFFIC STRIPE LF 5.0000 450.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 125 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,000.5000 3,000.50 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 126 SIGN ILLUMINATION SYSTEM LS 7,200.0000 7,200.00 0.000 0 127 MODIFYING EXISTING ELECTRICAL LS 1,065,200.0000 1,065,200.00 0.103 109,715.60 0.103 109,715 SYSTEM 128 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N72A4 TIME 04:05 PM ESTIMATE NO. 004 BID OPENING 09/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 129 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 6,000.00 1.000 6,000 MEETING 130 HOURLY OFF-SITE HR 200.0000 3,200.00 6.000 1,200 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 131 RAIL TENSIONING ASSEMBLY EA 1,200.0000 26,400.00 0.000 0 132 REMOVE PAINTED TRAFFIC STRIPE LF 1.0000 16,700.00 9,425.000 9,425.00 9,425.000 9,425 133 REMOVE PAINTED PAVEMENT MARKING SQFT 2.5000 3,250.00 0.000 0 134 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 14,100.00 4,780.000 4,780.00 4,780.000 4,780 PROGRAM CAS145 PAGE 7 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0N72A4 TIME 04:05 PM ESTIMATE NO. 004 BID OPENING 09/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: BLANCO, CHRIS/CE- RAVANIPOUR,M DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 659,295.03 1,543,624.06 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 136,417.52 1,685,338.92 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 795,712.55 3,228,962.98 135 MOBILIZATION LS 1,800,000.0000 1,800,000.00 0.950 1,710,000 ORIGINAL CONTRACT AMOUNT 18,354,903.61 TOTAL WORK COMPLETED 795,712.55 4,938,962.98 MATERIALS ON HAND ON SITE -74,634.00 1,285,649.00 DEDUCTIONS 0.00 0.00 TOTAL 721,078.55 6,224,611.98 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/15/22 265 02/06/23 02/06/23 05/06/24 34 52 0 0 24% 13% PROGRESS IS SATISFACTORY BLANCO, CHRIS/CE- RAVANIPOUR,M RESIDENT ENGINEER