PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/19/21 EST. NO. 008 TIME 10:50 AM R.E. NAME: TAING, STEVEN/CE-HONG,JOHN 12-0Q7004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/19/21 EST. NO. 008 TIME 10:50 AM R.E. NAME: TAING, STEVEN/CE-HONG,JOHN 12-0Q7004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CEM4401 CY2020 -10,000.00 002 RET CEM4401 CY2020 10,000.00 003 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 11/19/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0Q7004 TIME 10:50 AM ESTIMATE NO. 008 BID OPENING 04/28/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/21 R.E. NAME: TAING, STEVEN/CE-HONG,JOHN DATE OF THIS ESTIMATE 11/19/21 LOCATION PROGRESS ESTIMATE 12-ORA-241-14.5/25.0 ----------------- PETERSON-CHASE GENERAL IN ORANGE COUNTY IN IRVINE, LAKE ENGINEERING CONSTRUCTION, INC. FOREST, MISSION VIEJO AND RANCHO 16351 CONSTRUCTION CIR W; SANTA MARGARITA ON ROUTE 241 FROM IRVINE CA 92606 OSO PARKWAY TO PORTOLA PARKWAY (IRVINE) OVERCROSSING FED. AID NO. HSST-P241(8)E INSTALL MGS AND CRASH CUSHIONS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 625.0000 56,250.00 22.000 13,750.00 71.000 44,375 003 CONSTRUCTION AREA SIGNS LS 30,000.0000 30,000.00 0.240 7,200 004 TRAFFIC CONTROL SYSTEM LS 115,000.0000 115,000.00 0.540 62,100 005 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 2,360.00 94.000 3,760 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,000.0000 6,000.00 0.840 5,040 007 TEMPORARY RAILING (TYPE K) LF 17.0000 35,360.00 2,560.000 43,520 008 TEMPORARY CRASH CUSHION EA 3,100.0000 18,600.00 7.000 21,700 009 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.420 1,050 010 PREPARE WATER POLLUTION CONTROL PROGRAM LS 800.0000 800.00 0.750 600 011 TEMPORARY DRAINAGE INLET PROTECTION EA 50.0000 1,950.00 0.000 0 012 TREATED WOOD WASTE LB 0.2700 4,320.00 0.000 0 013 CLEARING AND GRUBBING (LS) LS 5,000.0000 5,000.00 0.500 2,500 014 ROADWAY EXCAVATION CY 125.0000 2,750.00 0.000 0 015 HOT MIX ASPHALT (TYPE A) TON 330.0000 7,590.00 0.000 0 016 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 6.0000 3,480.00 0.000 0 017 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 6.0000 8,040.00 0.000 0 018 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 130.0000 3,250.00 0.000 0 019 REMOVE ASPHALT CONCRETE DIKE LF 6.5000 10,205.00 305.000 1,982.50 305.000 1,982 020 MINOR CONCRETE (MINOR STRUCTURE) CY 2,395.0000 28,740.00 5.900 14,130.50 9.500 22,752 (F) 021 REMOVE CONCRETE CURB AND SIDEWALK (SQYD) SQYD 35.0000 3,290.00 100.000 3,500.00 100.000 3,500 022 GUARD RAILING DELINEATOR EA 17.0000 2,380.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 11/19/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0Q7004 TIME 10:50 AM ESTIMATE NO. 008 BID OPENING 04/28/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/21 R.E. NAME: TAING, STEVEN/CE-HONG,JOHN DATE OF THIS ESTIMATE 11/19/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 OBJECT MARKER (TYPE P) EA 60.0000 900.00 0.000 0 024 MIDWEST GUARDRAIL SYSTEM LF 31.0000 93,000.00 664.000 20,584.00 664.000 20,584 025 DOUBLE MIDWEST GUARDRAIL SYSTEM LF 80.0000 2,000.00 25.000 2,000.00 25.000 2,000 026 TRANSITION RAILING (TYPE WB-31) EA 4,550.0000 18,200.00 4.000 18,200.00 4.000 18,200 027 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,000.0000 14,000.00 0.000 0 028 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,000.0000 60,000.00 4.000 16,000.00 4.000 16,000 029 SEVERE - DUTY CRASH CUSHION EA 42,000.0000 84,000.00 1.000 42,000.00 1.000 42,000 030 CONCRETE BARRIER (TYPE 60M) LF 250.0000 87,500.00 0.000 0 031 REMOVE GUARDRAIL LF 9.3500 15,521.00 369.000 3,450 032 REMOVE CONCRETE BARRIER LF 85.0000 1,870.00 0.000 0 033 REMOVE CRASH CUSHION EA 1,200.0000 1,200.00 1.000 1,200 034 MODIFYING LIGHTING SYSTEMS LS 180,000.0000 180,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 11/19/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0Q7004 TIME 10:50 AM ESTIMATE NO. 008 BID OPENING 04/28/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/21 R.E. NAME: TAING, STEVEN/CE-HONG,JOHN DATE OF THIS ESTIMATE 11/19/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 132,147.00 325,514.15 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 102,052.85 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 132,147.00 427,567.00 035 MOBILIZATION LS 20,000.0000 20,000.00 0.050 1,000.00 1.000 20,000 ORIGINAL CONTRACT AMOUNT 928,056.00 TOTAL WORK COMPLETED 133,147.00 447,567.00 MATERIALS ON HAND ON SITE 41,176.60 DEDUCTIONS 0.00 0.00 TOTAL 133,147.00 488,743.60 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/18/20 90 12/15/20 12/15/20 12/23/21 58 165 0 0 46% 64% PROGRESS IS SATISFACTORY TAING, STEVEN/CE-HONG,JOHN RESIDENT ENGINEER PROGRAM CAS145 DATE 11/19/21