PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/04/23 EST. NO. 010 TIME 07:10 AM R.E. NAME: SIDHU, GAGANDEEP/CE- ESSAYLI,M 12-0Q8304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0016 14,917.68 E.W. @ F.A.(+) 062623 N 21 0 002 0003 24,255.00 E.W. @ L.S.(+) 070723 N 0001 0 39,172.68 TOTAL THIS ESTIMATE 26,272.46 TOTAL PREVIOUS ESTIMATE 65,445.14 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/04/23 EST. NO. 010 TIME 07:10 AM R.E. NAME: SIDHU, GAGANDEEP/CE- ESSAYLI,M 12-0Q8304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/04/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0Q8304 TIME 07:10 AM ESTIMATE NO. 010 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/28/23 R.E. NAME: SIDHU, GAGANDEEP/CE- ESSAYLI,M DATE OF THIS ESTIMATE 08/04/23 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 12-ORA-1-20.4/23.7 ---------------------------------- PTM GENERAL ENGINEERING IN ORANGE COUNTY IN NEWPORT BEACH SERVICES, INC. AT SUPERIOR AVE AND IN HUNTINGTON PO BOX 7745 BEACH AT BEACH BLVD RIVERSIDE CA 92513 FED. AID NO. SNHG-P001(677)E UPGRADE SIGNALS AND INSTALL SAFETY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 100.0000 6,000.00 60.000 6,000 003 CONSTRUCTION AREA SIGNS LS 14,000.0000 14,000.00 1.000 14,000 004 TRAFFIC CONTROL SYSTEM LS 44,000.0000 44,000.00 1.000 44,000 005 PORTABLE RADAR SPEED FEEDBACK SIGN EA 2,500.0000 2,500.00 1.000 2,500 SYSTEM DAY 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,000.0000 5,000.00 1.000 5,000 007 JOB SITE MANAGEMENT LS 6,000.0000 6,000.00 1.000 6,000 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 1.000 2,500 009 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 750.00 3.000 750 010 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 1.1500 2,645.00 1,725.000 1,983 (HAZARDOUS WASTE) 011 TREATED WOOD WASTE LB 3.0000 600.00 200.000 600 012 REMOVE CONCRETE (CY) CY 290.0000 7,830.00 27.000 7,830 013 HOT MIX ASPHALT (TYPE A) TON 1,100.0000 8,800.00 8.000 8,800 014 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 520.0000 3,120.00 6.000 3,120 015 DETECTABLE WARNING SURFACE SQFT 87.0000 4,437.00 51.000 4,437 016 REMOVE DETECTABLE WARNING SURFACE SQFT 41.0000 1,763.00 43.000 1,763 017 MINOR CONCRETE (MISCELLANEOUS CY 1,140.0000 28,500.00 25.000 28,500 CONSTRUCTION) 018 PRE/POST CONSTRUCTION SURVEYS EA 5,200.0000 10,400.00 2.000 10,400 019 PAINT CURB (2-COAT) SQFT 2.3000 4,577.00 1,768.000 4,066 020 REMOVE PAVEMENT MARKER EA 1.1500 839.50 750.000 862 021 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.1000 2,870.00 574.000 2,353 022 REMOVE ROADSIDE SIGN EA 98.0000 196.00 2.000 196 PROGRAM CAS145 PAGE 2 DATE 08/04/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0Q8304 TIME 07:10 AM ESTIMATE NO. 010 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/28/23 R.E. NAME: SIDHU, GAGANDEEP/CE- ESSAYLI,M DATE OF THIS ESTIMATE 08/04/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE ROADSIDE SIGN EA 75.0000 1,650.00 22.000 1,650 (STRAP AND SADDLE BRACKET METHOD) 024 REMOVE SIGN PANEL EA 64.0000 1,216.00 19.000 1,216 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.0000 4,080.00 240.000 4,080 (0.063"-UNFRAMED) 026 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 19.0000 7,030.00 370.000 7,030 (0.080"-UNFRAMED) 027 ROADSIDE SIGN - ONE POST EA 145.0000 435.00 3.000 435 028 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 87.0000 1,914.00 22.000 1,914 METHOD) 029 INSTALL ROADSIDE SIGN PANEL ON EA 87.0000 1,653.00 19.000 1,653 EXISTING POST 030 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0500 25,717.50 4,762.500 19,288 (ENHANCED WET NIGHT VISIBILITY) 031 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 4,650.00 8,347.000 5,008 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 18-12) 032 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 1,212.00 1,515.000 909 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 033 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 1,536.00 2,381.000 1,428 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 034 PAINT PAVEMENT MARKING (2-COAT) SQFT 3.5000 14,840.00 3,180.000 11,130 035 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 7,560.00 7,681.000 6,144 (ENHANCED WET NIGHT VISIBILITY) 036 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 1,065.00 789.000 1,183 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 037 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1500 2,967.00 3,491.000 4,014 (ENHANCED WET NIGHT VISIBILITY) 038 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1500 184.00 136.000 156 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 039 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 6,320.00 11,850.000 4,740 040 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.7500 5,267.50 2,322.000 4,063 041 TRAFFIC CENSUS STATION SYSTEMS LS 185,000.0000 185,000.00 1.000 185,000 042 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 519,000.0000 519,000.00 1.000 519,000 043 REMOVING SIGNAL AND LIGHTING SYSTEMS LS 25,000.0000 25,000.00 1.000 25,000 PROGRAM CAS145 PAGE 3 DATE 08/04/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0Q8304 TIME 07:10 AM ESTIMATE NO. 010 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/28/23 R.E. NAME: SIDHU, GAGANDEEP/CE- ESSAYLI,M DATE OF THIS ESTIMATE 08/04/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 963,706.83 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 39,172.68 65,445.14 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 39,172.68 1,029,151.97 044 MOBILIZATION LS 39,393.5000 39,393.50 1.000 39,393 ORIGINAL CONTRACT AMOUNT 1,018,018.00 TOTAL WORK COMPLETED 39,172.68 1,068,545.47 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 39,172.68 1,068,545.47 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/05/21 60 04/04/22 04/04/22 06/28/23 59 250 0 0 100% 100% SIDHU, GAGANDEEP/CE- ESSAYLI,M RESIDENT ENGINEER