PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/24 EST. NO. 001 TIME 04:20 PM R.E. NAME: KATTAO, BIBARS/CE- ESSAYLI,M 12-0R1704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/24 EST. NO. 001 TIME 04:20 PM R.E. NAME: KATTAO, BIBARS/CE- ESSAYLI,M 12-0R1704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING FRINGE STMT -10,000.00 001 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 10/21/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R1704 TIME 04:20 PM ESTIMATE NO. 001 BID OPENING 07/27/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/24 R.E. NAME: KATTAO, BIBARS/CE- ESSAYLI,M DATE OF THIS ESTIMATE 10/21/24 LOCATION RERUN PROGRESS ESTIMATE 12-ORA-1-8.5 ----------------------- INTERNATIONAL LINE BUILDERS, ORANGE COUNTY IN LAGUNA BEACH AT CRESS INC. STREET 3955 TEMESCAL CANYON ROAD CORONA CA 92883 FED. AID NO. HSNH-P001(691)E REPLACE TRAFFIC SIGNALS, INSTALL LIGHTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,341.0000 2,341.00 1.000 2,341.00 1.000 2,341 002 TIME-RELATED OVERHEAD (WDAY) WDAY 403.7500 48,450.00 0.130 52.49 0.130 52 003 CONSTRUCTION AREA SIGNS LS 24,515.0000 24,515.00 0.750 18,386.25 0.750 18,386 004 TRAFFIC CONTROL SYSTEM LS 42,122.0000 42,122.00 0.000 0 005 FLASHING ARROW SIGN EA 3,977.0000 7,954.00 0.000 0 006 TYPE II BARRICADE EA 58.0000 1,566.00 0.000 0 007 CHANNELIZER (SURFACE MOUNTED) EA 60.0000 3,840.00 0.000 0 008 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 3,900.0000 3,900.00 0.000 0 009 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 14,041.0000 14,041.00 0.000 0 010 JOB SITE MANAGEMENT LS 8,585.0000 8,585.00 0.130 1,116.05 0.130 1,116 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 986.0000 986.00 1.000 986.00 1.000 986 012 TEMPORARY DRAINAGE INLET PROTECTION EA 204.0000 1,020.00 0.750 153.00 0.750 153 013 REMOVE CONCRETE (CY) CY 791.0000 34,804.00 0.000 0 014 RESET COBBLE ROCK LF 221.5000 886.00 0.000 0 015 CLEARING AND GRUBBING (LS) LS 8,357.0000 8,357.00 0.000 0 016 CLASS 2 AGGREGATE BASE (CY) CY 259.0000 5,439.00 0.000 0 017 HOT MIX ASPHALT (TYPE A) TON 825.9500 16,519.00 0.000 0 018 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 1,050.0000 12,600.00 0.000 0 019 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 116.0000 10,092.00 0.000 0 020 REMOVE CONCRETE PAVEMENT (CY) CY 380.0000 7,220.00 0.000 0 021 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,629.0000 11,403.00 0.000 0 (F) (RAPID STRENGTH CONCRETE) 022 MINOR CONCRETE (MINOR STRUCTURE) (RAPID CY 3,980.0000 3,980.00 0.000 0 (F) STRENGTH CONCRETE) PROGRAM CAS145 PAGE 2 DATE 10/21/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R1704 TIME 04:20 PM ESTIMATE NO. 001 BID OPENING 07/27/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/24 R.E. NAME: KATTAO, BIBARS/CE- ESSAYLI,M DATE OF THIS ESTIMATE 10/21/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CONCRETE BACKFILL (PIPE TRENCH) (RAPID CY 1,600.0000 11,200.00 0.000 0 (F) STRENGTH CONCRETE) 024 18" REINFORCED CONCRETE PIPE LF 641.0000 40,383.00 0.000 0 025 DRAINAGE INLET MARKER EA 1,367.0000 4,101.00 0.000 0 026 ABANDON CULVERT (EA) EA 4,012.0000 4,012.00 0.000 0 027 REMOVE PIPE (LF) LF 2,675.0000 64,200.00 0.000 0 028 REMOVE INLET EA 2,535.0000 7,605.00 0.000 0 029 DETECTABLE WARNING SURFACE SQFT 95.0000 5,700.00 0.000 0 030 MINOR CONCRETE (MISCELLANEOUS CY 3,228.0000 67,788.00 0.000 0 CONSTRUCTION) 031 MINOR CONCRETE (MISCELLANEOUS CY 1,112.0000 15,568.00 0.000 0 CONSTRUCTION) (RAPID STRENGTH CONCRETE) 032 PRE/POST CONSTRUCTION SURVEYS EA 3,788.7500 15,155.00 0.500 1,894.38 0.500 1,894 033 MISCELLANEOUS IRON AND STEEL LB 15.9000 8,109.00 0.000 0 (F) 034 PARKING METER POST EA 5,607.0000 5,607.00 0.000 0 035 REMOVE PARKING METER POST EA 2,371.0000 2,371.00 0.000 0 036 PAINT CURB (2-COAT) SQFT 3.4500 2,484.00 0.000 0 037 REMOVE PAVEMENT MARKER EA 8.9000 979.00 0.000 0 038 PAVEMENT MARKER (RETROREFLECTIVE) EA 23.4000 2,574.00 0.000 0 039 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.5000 560.00 0.000 0 (0.063"-UNFRAMED) 040 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 4.7500 6,887.50 0.000 0 WET NIGHT VISIBILITY) 041 PAINT TRAFFIC STRIPE (2-COAT) LF 3.7500 3,337.50 0.000 0 042 6" THERMOPLASTIC TRAFFIC STRIPE LF 4.5000 1,890.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 043 REMOVE PAINTED TRAFFIC STRIPE LF 3.5000 3,115.00 0.000 0 044 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.9000 4,095.00 0.000 0 045 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.9000 6,419.00 0.000 0 046 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 18.7800 3,756.00 0.000 0 047 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 12.0000 456.00 0.000 0 (BROKEN 6-1) 048 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 10.2500 3,280.00 0.000 0 (BROKEN 17-7) 049 8" TRAFFIC STRIPE TAPE (WARRANTY) LF 24.5000 2,695.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/21/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R1704 TIME 04:20 PM ESTIMATE NO. 001 BID OPENING 07/27/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/24 R.E. NAME: KATTAO, BIBARS/CE- ESSAYLI,M DATE OF THIS ESTIMATE 10/21/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 SIGNAL AND LIGHTING SYSTEM LS 378,113.0000 378,113.00 0.110 41,592.43 0.110 41,592 051 MODIFYING INTERCONNECTION CONDUIT AND LS 20,253.0000 20,253.00 0.600 12,151.80 0.600 12,151 CABLE 052 REMOVING SIGNAL AND LIGHTING SYSTEMS LS 23,417.0000 23,417.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 10/21/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R1704 TIME 04:20 PM ESTIMATE NO. 001 BID OPENING 07/27/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/24 R.E. NAME: KATTAO, BIBARS/CE- ESSAYLI,M DATE OF THIS ESTIMATE 10/21/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 78,673.40 78,673.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 78,673.40 78,673.40 053 MOBILIZATION LS 58,100.0000 58,100.00 0.950 55,195.00 0.950 55,195 ORIGINAL CONTRACT AMOUNT 1,044,830.00 TOTAL WORK COMPLETED 133,868.40 133,868.40 MATERIALS ON HAND ON SITE 159,425.92 159,425.92 DEDUCTIONS -10,000.00 -10,000.00 TOTAL 283,294.32 283,294.32 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/28/23 120 09/09/24 03/26/24 03/19/25 16 124 0 0 13% 13% PROGRESS IS SATISFACTORY KATTAO, BIBARS/CE- ESSAYLI,M RESIDENT ENGINEER