PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/22 EST. NO. 003 TIME 03:16 PM R.E. NAME: KIM, STEVEN/CE- HONG, JOHN 12-0R2004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/22 EST. NO. 003 TIME 03:16 PM R.E. NAME: KIM, STEVEN/CE- HONG, JOHN 12-0R2004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/22/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R2004 TIME 03:16 PM ESTIMATE NO. 003 BID OPENING 03/16/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: KIM, STEVEN/CE- HONG, JOHN DATE OF THIS ESTIMATE 08/22/22 LOCATION PROGRESS ESTIMATE 12-ORA-5-0.0/2.0 ----------------- MYERS & SONS CONSTRUCTION, LLC IN ORANGE COUNTY IN SAN CLEMENTE 45 MORRISON AVENUE; FROM ORANGE COUNTY LINE TO 0.4 MILE SACRAMENTO CA 95838 NORTH OF EL CAMINO REAL UNDERCROSSING FED. AID NO. ACIM-052(32)E PAVEMENT REHABILITATION AND UPGRADE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 35,000.0000 35,000.00 0.100 3,500.00 0.300 10,500 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,500.0000 600,000.00 20.000 30,000.00 20.000 30,000 004 DISPUTE RESOLUTION BOARD ON-SITE EA 6,000.0000 42,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 18,565.0000 18,565.00 0.800 14,852.00 0.800 14,852 007 TRAFFIC CONTROL SYSTEM LS 650,000.0000 650,000.00 0.100 65,000.00 0.200 130,000 008 CHANNELIZER (SURFACE MOUNTED) EA 36.0000 1,152.00 16.000 576.00 16.000 576 009 PORTABLE RADAR SPEED FEEDBACK SIGN EA 23.0000 18,400.00 0.000 0 SYSTEM DAY 010 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 9,000.0000 18,000.00 0.000 0 011 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 18,000.0000 18,000.00 0.000 0 012 TEMPORARY RAILING (TYPE K) LF 55.0000 93,500.00 440.000 24,200.00 440.000 24,200 013 ALTERNATIVE TEMPORARY CRASH CUSHION EA 6,840.0000 20,520.00 2.000 13,680.00 2.000 13,680 014 JOB SITE MANAGEMENT LS 25,000.0000 25,000.00 0.100 2,500.00 0.100 2,500 015 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 1.000 1,000 016 TEMPORARY DRAINAGE INLET PROTECTION EA 95.0000 3,325.00 72.000 6,840.00 72.000 6,840 017 TEMPORARY CONCRETE WASHOUT LS 45,000.0000 45,000.00 0.000 0 018 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.8500 18,190.00 0.000 0 STRIPE (HAZARDOUS WASTE) 019 TREATED WOOD WASTE LB 0.8000 12,480.00 0.000 0 020 CLEARING AND GRUBBING (LS) LS 6,000.0000 6,000.00 0.500 3,000.00 0.500 3,000 021 ROADWAY EXCAVATION CY 140.0000 36,400.00 120.000 16,800.00 120.000 16,800 022 IMPORTED BORROW (CY) CY 160.0000 9,760.00 60.000 9,600.00 60.000 9,600 PROGRAM CAS145 PAGE 2 DATE 08/22/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R2004 TIME 03:16 PM ESTIMATE NO. 003 BID OPENING 03/16/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: KIM, STEVEN/CE- HONG, JOHN DATE OF THIS ESTIMATE 08/22/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLASS 2 AGGREGATE BASE (CY) CY 75.0000 3,300.00 40.000 3,000.00 40.000 3,000 024 REPLACE BASE CY 391.0000 512,210.00 0.000 0 025 BASE BOND BREAKER SQYD 4.0000 166,800.00 0.000 0 026 HOT MIX ASPHALT (TYPE A) TON 113.0000 20,340.00 0.000 0 027 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 157.0000 268,470.00 0.000 0 028 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 20.5000 4,715.00 0.000 0 029 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 20.5000 3,075.00 0.000 0 030 PLACE HOT MIX ASPHALT SQYD 39.0000 12,480.00 0.000 0 (MISCELLANEOUS AREA) 031 TACK COAT TON 725.0000 4,350.00 0.000 0 032 REMOVE ASPHALT CONCRETE DIKE LF 5.0000 4,250.00 400.000 2,000.00 400.000 2,000 033 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.4000 43,520.00 0.000 0 034 PRECAST CONCRETE PAVEMENT CY 800.0000 9,760,000.00 0.000 0 035 DRILL AND BOND (DOWEL BAR) EA 25.0000 58,000.00 0.000 0 036 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 775.0000 666,500.00 0.000 0 037 ISOLATION JOINT SEAL (SILICONE) LF 4.0000 133,600.00 0.000 0 038 REMOVE CONCRETE PAVEMENT (CY) CY 140.0000 1,708,000.00 0.000 0 039 GRIND NEW CONCRETE PAVEMENT SQYD 7.7500 302,250.00 0.000 0 040 MINOR CONCRETE (MINOR STRUCTURE) CY 5,000.0000 45,000.00 0.000 0 (F) 041 SOUND WALL (MASONRY BLOCK) SQFT 100.0000 6,400.00 0.000 0 (F) 042 REMOVE SOUND WALL (LF) LF 750.0000 6,000.00 8.000 6,000.00 8.000 6,000 043 MINOR CONCRETE (CURB) (CY) CY 5,000.0000 15,500.00 0.000 0 044 MINOR CONCRETE (STAMPED CONCRETE) SQFT 15.0000 135,000.00 0.000 0 045 REMOVE CONCRETE (CURB AND GUTTER) LF 75.0000 3,600.00 0.000 0 046 REMOVE PAVEMENT MARKER EA 1.1000 3,135.00 0.000 0 047 GUARD RAILING DELINEATOR EA 40.0000 3,080.00 0.000 0 048 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 9,975.00 0.000 0 049 OBJECT MARKER (TYPE P) EA 150.0000 900.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/22/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R2004 TIME 03:16 PM ESTIMATE NO. 003 BID OPENING 03/16/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: KIM, STEVEN/CE- HONG, JOHN DATE OF THIS ESTIMATE 08/22/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE ROADSIDE SIGN EA 500.0000 2,500.00 0.000 0 051 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 40.0000 2,720.00 0.000 0 052 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 1,600.00 0.000 0 (0.080"-UNFRAMED) 053 ROADSIDE SIGN - ONE POST EA 750.0000 3,000.00 0.000 0 054 ROADSIDE SIGN - TWO POST EA 1,500.0000 1,500.00 0.000 0 055 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 40.0000 65,200.00 0.000 0 056 TRANSITION RAILING (TYPE WB-31) EA 5,200.0000 10,400.00 0.000 0 057 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,200.0000 6,000.00 0.000 0 058 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,100.0000 24,600.00 0.000 0 059 SEVERE-DUTY CRASH CUSHION EA 48,000.0000 48,000.00 0.000 0 060 CONCRETE BARRIER (TYPE 60M) LF 323.0000 77,520.00 0.000 0 061 CONCRETE BARRIER (TYPE 60MD) LF 260.0000 44,200.00 0.000 0 062 REMOVE GUARDRAIL LF 9.0000 13,860.00 0.000 0 063 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 11,750.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 064 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 1,080.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 065 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 42,210.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 066 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.8000 4,410.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 067 12" THERMOPLASTIC TRAFFIC STRIPE LF 2.8500 21,546.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 068 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 21,680.00 0.000 0 069 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 4,700.00 0.000 0 070 CONTRAST STRIPE THERMOPLASTIC LF 1.0000 31,700.00 0.000 0 071 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.9000 189,950.00 0.000 0 (WARRANTY) 072 TRAFFIC CENSUS STATION SYSTEMS LS 224,500.0000 224,500.00 0.000 0 073 MODIFYING LIGHTING SYSTEMS LS 17,300.0000 17,300.00 0.000 0 074 MODIFYING RAMP METERING SYSTEMS LS 150,300.0000 150,300.00 0.000 0 075 MODIFYING TRAFFIC MONITORING STATIONS LS 69,500.0000 69,500.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 08/22/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0R2004 TIME 03:16 PM ESTIMATE NO. 003 BID OPENING 03/16/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/22 R.E. NAME: KIM, STEVEN/CE- HONG, JOHN DATE OF THIS ESTIMATE 08/22/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 201,548.00 279,548.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 201,548.00 279,548.00 076 MOBILIZATION LS 1,825,000.0000 1,825,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 18,498,468.00 TOTAL WORK COMPLETED 201,548.00 279,548.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 201,548.00 279,548.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/12/22 400 08/10/22 08/10/22 03/18/24 10 0 0 0 2% 3% PROGRESS IS SATISFACTORY KIM, STEVEN/CE- HONG, JOHN RESIDENT ENGINEER