PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/22/25 EST. NO. 014 TIME 12:22 PM R.E. NAME: LUNA, FRANKLIN 12-0S1104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0006 8,118.58 E.W. @ F.A.(+) 111725 N 0006 005 0011 10,292.13 E.W. @ F.A.(+) 082825 N 0011 0014 4,459.73 101025 N 0014 0015 6,993.07 101325 N 0015 0016 4,394.59 101525 N 0016 0017 4,322.43 101725 N 0017 38,580.53 TOTAL THIS ESTIMATE 126,116.05 TOTAL PREVIOUS ESTIMATE 164,696.58 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/22/25 EST. NO. 014 TIME 12:22 PM R.E. NAME: LUNA, FRANKLIN 12-0S1104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/22/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S1104 TIME 12:22 PM ESTIMATE NO. 014 BID OPENING 08/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: LUNA, FRANKLIN DATE OF THIS ESTIMATE 12/22/25 LOCATION PROGRESS ESTIMATE 12-ORA-22-R0.9/R9.4 ----------------- BEADOR CONSTRUCTION COMPANY, ORANGE FROM BOLSA CHICA ROAD OVERCROSSING INC. IN GARDEN GROVE TO LEWIS STREET 2900 BRISTOL STREET D204 OVERCROSSING IN ORANGE COSTA MESA CA 92626 FED. AID NO. HSNH-P022(31)E REPLACE CONCRETE BARRIER AND MODIFY LIGHTI ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 1.000 10,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 15,000.0000 15,000.00 0.600 9,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 4,000.0000 1,800,000.00 19.000 76,000.00 258.000 1,032,000 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 60,000.00 4.000 24,000 005 HOURLY OFF-SITE HR 200.0000 4,000.00 7.000 1,400 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 150,000.0000 150,000.00 0.700 105,000 007 TRAFFIC CONTROL SYSTEM LS 1,203,361.0000 1,203,361.00 0.020 24,067.22 0.850 1,022,856 008 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 3,000.0000 120,000.00 40.000 120,000 009 CHANNELIZER (SURFACE MOUNTED) EA 55.0000 9,350.00 147.000 8,085 010 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 80.0000 36,000.00 227.000 18,160 SYSTEM 011 TEMPORARY BARRIER SYSTEM LF 10.0000 928,000.00 80,000.000 800,000 012 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8,500.0000 110,500.00 10.000 85,000 013 TEMPORARY CRASH CUSHION TL-3 EA 3,500.0000 35,000.00 8.000 28,000 014 TEMPORARY TRAFFIC SCREEN LF 3.0000 278,400.00 80,000.000 240,000 015 TEMPORARY RADAR SPEED FEEDBACK SIGN EA 7,500.0000 75,000.00 8.000 60,000 SYSTEM 016 JOB SITE MANAGEMENT LS 225,000.0000 225,000.00 0.050 11,250.00 0.850 191,250 017 STORMWATER POLLUTION PREVENTION PLAN LS 7,500.0000 7,500.00 0.050 375.00 0.850 6,375 018 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 1.000 2,000 019 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 24,000.00 108.000 21,600 020 TEMPORARY CONSTRUCTION ENTRANCE EA 5,500.0000 27,500.00 4.000 22,000 021 STREET SWEEPING LS 100,000.0000 100,000.00 0.050 5,000.00 0.850 85,000 022 TEMPORARY CONCRETE WASHOUT LS 150,000.0000 150,000.00 0.050 7,500.00 0.850 127,500 PROGRAM CAS145 PAGE 2 DATE 12/22/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S1104 TIME 12:22 PM ESTIMATE NO. 014 BID OPENING 08/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: LUNA, FRANKLIN DATE OF THIS ESTIMATE 12/22/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 500.0000 9,500.00 0.000 0 024 CLEARING AND GRUBBING (LS) LS 85,000.0000 85,000.00 1.000 85,000.00 1.000 85,000 025 ROADWAY EXCAVATION CY 200.0000 158,000.00 99.000 19,800.00 1,475.000 295,000 026 MAINTAIN EXISTING PLANTED AREAS LS 200,000.0000 200,000.00 0.200 40,000.00 0.600 120,000 027 OPERATE EXISTING IRRIGATION FACILITIES LS 30,000.0000 30,000.00 0.200 6,000.00 0.600 18,000 028 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,700.0000 91,800.00 7.600 12,920.00 48.100 81,770 (F) 029 MINOR CONCRETE (BACKFILL) CY 840.0000 14,280.00 17.000 14,280 (F) 030 CLEAN EXPANSION JOINT LF 18.0000 11,538.00 400.000 7,200.00 641.000 11,538 031 JOINT SEAL (TYPE AL) LF 26.0000 16,666.00 400.000 10,400.00 641.000 16,666 032 REMOVE SIGN STRUCTURE (EA) EA 17,500.0000 17,500.00 1.000 17,500 033 BRIDGE REMOVAL (PORTION), LOCATION A LS 35,000.0000 35,000.00 1.000 35,000 034 BRIDGE REMOVAL (PORTION), LOCATION B LS 50,000.0000 50,000.00 1.000 50,000 035 BRIDGE REMOVAL (PORTION), LOCATION C LS 35,000.0000 35,000.00 1.000 35,000 036 BRIDGE REMOVAL (PORTION), LOCATION D LS 35,000.0000 35,000.00 1.000 35,000 037 BRIDGE REMOVAL (PORTION), LOCATION E LS 26,000.0000 26,000.00 1.000 26,000 038 BRIDGE REMOVAL (PORTION), LOCATION F LS 30,000.0000 30,000.00 1.000 30,000 039 BRIDGE REMOVAL (PORTION), LOCATION G LS 42,000.0000 42,000.00 1.000 42,000 040 BRIDGE REMOVAL (PORTION), LOCATION H LS 30,000.0000 30,000.00 1.000 30,000 041 BRIDGE REMOVAL (PORTION), LOCATION I LS 30,000.0000 30,000.00 1.000 30,000 042 BRIDGE REMOVAL (PORTION), LOCATION J LS 21,000.0000 21,000.00 1.000 21,000 043 BRIDGE REMOVAL (PORTION), LOCATION K LS 29,000.0000 29,000.00 1.000 29,000 044 BRIDGE REMOVAL (PORTION), LOCATION L LS 49,000.0000 49,000.00 1.000 49,000 045 BRIDGE REMOVAL (PORTION), LOCATION M LS 49,000.0000 49,000.00 1.000 49,000 046 BRIDGE REMOVAL (PORTION), LOCATION N LS 36,000.0000 36,000.00 1.000 36,000 047 BRIDGE REMOVAL (PORTION), LOCATION O LS 43,000.0000 43,000.00 0.000 0 048 WATER QUALITY RISER (DETENTION BASIN) EA 10,000.0000 60,000.00 6.000 60,000.00 6.000 60,000 049 TRASH SCREEN EA 11,000.0000 11,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 12/22/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S1104 TIME 12:22 PM ESTIMATE NO. 014 BID OPENING 08/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: LUNA, FRANKLIN DATE OF THIS ESTIMATE 12/22/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 18" PLASTIC PIPE LF 200.0000 136,000.00 680.000 136,000 051 24" PLASTIC PIPE LF 400.0000 60,000.00 4.000 1,600 052 24" REINFORCED CONCRETE PIPE LF 400.0000 48,000.00 102.000 40,800.00 112.000 44,800 053 GRATED LINE DRAIN LF 650.0000 312,000.00 82.000 53,300.00 436.000 283,400 054 36" PRECAST CONCRETE PIPE MANHOLE LF 2,750.0000 5,500.00 2.000 5,500 055 REMOVE DRAINAGE FACILITY (EA) EA 1,100.0000 6,600.00 4.000 4,400.00 6.000 6,600 056 REMOVE GRATED LINE DRAIN LF 85.0000 16,150.00 88.000 7,480.00 184.000 15,640 057 REMOVE PIPE (LF) LF 25.0000 21,500.00 100.000 2,500.00 704.000 17,600 058 REMOVE INLET EA 5,000.0000 80,000.00 2.000 10,000.00 15.000 75,000 059 MISCELLANEOUS IRON AND STEEL LB 6.0000 53,562.00 978.000 5,868.00 7,659.000 45,954 (F) 060 REMOVE PAVEMENT MARKER EA 1.1000 2,123.00 0.000 0 061 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.5000 8,685.00 0.000 0 062 REMOVE ROADSIDE SIGN EA 330.0000 6,600.00 2.000 660 063 REMOVE ROADSIDE SIGN (STRAP AND SADDLE EA 165.0000 660.00 0.000 0 BRACKET METHOD) 064 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 12,870.00 0.000 0 (0.063"-UNFRAMED) 065 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 330.0000 20,460.00 0.000 0 METHOD) 066 CONCRETE BARRIER (TYPE 60M) LF 140.0000 3,220,000.00 1,043.000 146,020.00 17,965.000 2,515,100 067 CONCRETE BARRIER (TYPE 60MF) LF 380.0000 1,972,200.00 360.000 136,800.00 3,838.000 1,458,440 068 CONCRETE BARRIER (TYPE 60MGF) LF 390.0000 218,400.00 0.000 0 069 CONCRETE BARRIER (TYPE 60MA MODIFIED) LF 135.0000 531,900.00 2,530.000 341,550 (F) 070 CONCRETE BARRIER TRANSITION LF 225.0000 2,718,225.00 9,766.000 2,197,350 (F) 071 REMOVE CONCRETE BARRIER LF 30.0000 1,230,000.00 35,220.000 1,056,600 072 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 10.0000 9,000.00 0.000 0 WET NIGHT VISIBILITY) 073 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.4000 115,780.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 074 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 44,850.00 0.000 0 075 CONTRAST STRIPE PAINT (2-COAT) LF 0.3000 21,750.00 0.000 0 076 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 11.0000 77,990.00 0.000 0 (WARRANTY) PROGRAM CAS145 PAGE 4 DATE 12/22/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S1104 TIME 12:22 PM ESTIMATE NO. 014 BID OPENING 08/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: LUNA, FRANKLIN DATE OF THIS ESTIMATE 12/22/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 TRAFFIC CENSUS STATION SYSTEMS LS 550,000.0000 550,000.00 0.050 27,500 078 FIBER OPTIC CABLE SYSTEMS LS 435,000.0000 435,000.00 0.090 39,150 079 TEMPORARY TRAFFIC MONITORING STATION LS 330,000.0000 330,000.00 0.430 141,900 SYSTEM 080 MODIFYING LIGHTING SYSTEMS LS 6,750,000.0000 6,750,000.00 0.021 141,750.00 0.360 2,430,000 081 MODIFYING RAMP METERING SYSTEMS LS 375,000.0000 375,000.00 0.075 28,125.00 0.247 92,625 082 MODIFYING TRAFFIC MONITORING STATIONS LS 390,000.0000 390,000.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 12/22/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S1104 TIME 12:22 PM ESTIMATE NO. 014 BID OPENING 08/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: LUNA, FRANKLIN DATE OF THIS ESTIMATE 12/22/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 942,555.22 16,168,949.85 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 38,580.53 164,696.58 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 981,135.75 16,333,646.43 083 MOBILIZATION LS 2,900,000.0000 2,900,000.00 1.000 2,900,000 ORIGINAL CONTRACT AMOUNT 29,300,700.00 TOTAL WORK COMPLETED 981,135.75 19,233,646.43 MATERIALS ON HAND ON SITE -83,187.05 798,862.07 DEDUCTIONS 0.00 0.00 TOTAL 897,948.70 20,032,508.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/10/24 450 12/04/24 12/04/24 09/25/26 258 2 0 0 65% 57% PROGRESS IS SATISFACTORY LUNA, FRANKLIN RESIDENT ENGINEER