PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/24/21 EST. NO. 001 TIME 10:13 AM R.E. NAME: PHAM, LIEU/CE- WU, ADRIAN 12-0S4504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/24/21 EST. NO. 001 TIME 10:13 AM R.E. NAME: PHAM, LIEU/CE- WU, ADRIAN 12-0S4504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/24/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S4504 TIME 10:13 AM ESTIMATE NO. 001 BID OPENING 02/17/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/21 R.E. NAME: PHAM, LIEU/CE- WU, ADRIAN DATE OF THIS ESTIMATE 08/24/21 LOCATION PROGRESS ESTIMATE 12-ORA-39-8.5/11.7 ----------------- RJ NOBLE IN ORANGE COUNTY, IN WESTMINSTER 15505 EAST LINCOLN AVE; AND STANTON, FROM ROUTE 22/39 ORANGE CA 92865 SEPARATION TO STARR STREET FED. AID NO. N O N E RESURFACE HIGHWAY WITH RHMA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000.00 1.000 1,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 200.0000 14,000.00 10.000 2,000.00 10.000 2,000 003 CONSTRUCTION AREA SIGNS LS 14,000.0000 14,000.00 0.450 6,300.00 0.450 6,300 004 TRAFFIC CONTROL SYSTEM LS 197,000.0000 197,000.00 0.150 29,550.00 0.150 29,550 005 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 0.0900 1,305.00 7,000.000 630.00 7,000.000 630 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.0200 2,260.00 40,000.000 800.00 40,000.000 800 007 PORTABLE RADAR SPEED FEEDBACK SIGN EA 11.0000 1,760.00 20.000 220.00 20.000 220 SYSTEM DAY 008 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 1,000.0000 1,000.00 0.100 100.00 0.100 100 009 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 3,000.0000 6,000.00 1.000 3,000.00 1.000 3,000 010 JOB SITE MANAGEMENT LS 35,000.0000 35,000.00 0.150 5,250.00 0.150 5,250 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 10,000.0000 10,000.00 0.250 2,500.00 0.250 2,500 012 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 91.0000 1,710,800.00 5,500.000 500,500.00 5,500.000 500,500 013 TACK COAT TON 600.0000 54,600.00 18.000 10,800.00 18.000 10,800 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.1500 228,850.00 40,000.000 46,000.00 40,000.000 46,000 015 PAINT CURB (2-COAT) SQFT 0.7000 19,880.00 0.000 0 016 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.6000 8,034.00 0.000 0 017 REMOVE ROADSIDE SIGN MOUNTED ON MAST ARM EA 420.0000 2,520.00 0.000 0 018 REMOVE ROADSIDE SIGN PANEL EA 205.0000 4,305.00 0.000 0 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.0000 2,890.00 0.000 0 (0.063"-UNFRAMED) 020 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 18.0000 144.00 0.000 0 (0.080"-UNFRAMED) 021 ROADSIDE SIGN - ONE POST EA 520.0000 3,120.00 0.000 0 022 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 420.0000 2,520.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/24/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S4504 TIME 10:13 AM ESTIMATE NO. 001 BID OPENING 02/17/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/21 R.E. NAME: PHAM, LIEU/CE- WU, ADRIAN DATE OF THIS ESTIMATE 08/24/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 INSTALL ROADSIDE SIGN PANEL ON EA 235.0000 6,110.00 0.000 0 EXISTING POST 024 THERMOPLASTIC PAVEMENT MARKING SQFT 2.3500 74,495.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 025 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.1000 252.00 0.000 0 (BROKEN 6-1) 026 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 35,800.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 027 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 5,240.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 028 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0500 11,445.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 029 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 115,000.0000 115,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/24/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0S4504 TIME 10:13 AM ESTIMATE NO. 001 BID OPENING 02/17/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/21 R.E. NAME: PHAM, LIEU/CE- WU, ADRIAN DATE OF THIS ESTIMATE 08/24/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 608,650.00 608,650.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 608,650.00 608,650.00 030 MOBILIZATION LS 220,000.0000 220,000.00 0.950 209,000.00 0.950 209,000 ORIGINAL CONTRACT AMOUNT 2,789,330.00 TOTAL WORK COMPLETED 817,650.00 817,650.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 817,650.00 817,650.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/25/21 70 04/09/21 04/09/21 11/17/21 10 84 0 0 29% 14% PROGRESS IS SATISFACTORY PHAM, LIEU/CE- WU, ADRIAN RESIDENT ENGINEER PROGRAM CAS145 DATE 08/24/21