PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/24 EST. NO. 002 TIME 11:05 AM R.E. NAME: WARE, ELIZABETH 12-0T9604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/24 EST. NO. 002 TIME 11:05 AM R.E. NAME: WARE, ELIZABETH 12-0T9604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0T9604 TIME 11:05 AM ESTIMATE NO. 002 BID OPENING 02/13/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: WARE, ELIZABETH DATE OF THIS ESTIMATE 06/18/24 LOCATION PROGRESS ESTIMATE 12-ORA-73-11.4 ----------------- ORTIZ ENTERPRISES, INC. ORANGE COUNTY IN LAGUNA NIGUEL AT CROWN 6 CUSHING SUITE 200 VALLEY PARKWAY UNDERCROSSING IRVINE CA 92618 FED. AID NO. N O N E REPAIR V-DITCH, SLOPE, AND SPLASH WALL. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 TIME-RELATED OVERHEAD (WDAY) WDAY 1,400.0000 126,000.00 22.000 30,800.00 35.000 49,000 002 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.750 11,250.00 0.750 11,250 003 TRAFFIC CONTROL SYSTEM LS 40,000.0000 40,000.00 0.000 0 004 FLASHING ARROW SIGN EA 2,000.0000 4,000.00 0.000 0 005 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 4,000.0000 4,000.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,000.0000 4,000.00 0.000 0 007 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.000 0 008 WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.000 0 009 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 8.0000 8,720.00 0.000 0 MATRIX) 010 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 300.00 0.000 0 011 TEMPORARY FIBER ROLL LF 7.0000 6,440.00 0.000 0 012 TEMPORARY SILT FENCE LF 14.0000 2,520.00 0.000 0 013 REMOVE CONCRETE (CY) CY 800.0000 11,200.00 0.000 0 014 CLEARING AND GRUBBING (LS) LS 18,000.0000 18,000.00 0.000 0 015 ROADWAY EXCAVATION CY 55.0000 55,000.00 0.000 0 016 IMPORTED BORROW (CY) CY 40.0000 49,600.00 0.000 0 017 MINOR CONCRETE (MINOR STRUCTURE) CY 3,300.0000 56,100.00 0.000 0 (F) 018 INJECT CRACK (EPOXY) LF 125.0000 37,500.00 0.000 0 019 6" THERMOPLASTIC TRAFFIC STRIPE LF 9.0000 3,060.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 020 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 1,020.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0T9604 TIME 11:05 AM ESTIMATE NO. 002 BID OPENING 02/13/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: WARE, ELIZABETH DATE OF THIS ESTIMATE 06/18/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 42,050.00 60,250.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 42,050.00 60,250.00 021 MOBILIZATION LS 49,339.0000 49,339.00 0.750 37,004.25 0.750 37,004 ORIGINAL CONTRACT AMOUNT 498,299.00 TOTAL WORK COMPLETED 79,054.25 97,254.25 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 79,054.25 97,254.25 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/11/24 90 06/02/24 04/26/24 09/09/24 35 0 0 0 20% 39% PROGRESS IS SATISFACTORY WARE, ELIZABETH RESIDENT ENGINEER