PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/26 EST. NO. 001 TIME 06:10 PM R.E. NAME: KARAM, IMAD 12-0V5004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/26 EST. NO. 001 TIME 06:10 PM R.E. NAME: KARAM, IMAD 12-0V5004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0V5004 TIME 06:10 PM ESTIMATE NO. 001 BID OPENING 02/04/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: KARAM, IMAD DATE OF THIS ESTIMATE 10/21/26 LOCATION PROGRESS ESTIMATE 12-ORA-1-23.2/25.9 ----------------- ALL AMERICAN ASPHALT ORANGE COUNTY IN HUNTINGTON BEACH FROM 400 EAST SIXTH STREET NEWLAND STREET TO GOLDENWEST STREET CORONA CA 92879 FED. AID NO. N O N E COLD PLANE AC, RHMA AND LOOP DETECTOR REPL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 950.0000 950.00 1.000 950.00 1.000 950 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,500.0000 135,000.00 8.000 12,000.00 8.000 12,000 003 CONSTRUCTION AREA SIGNS LS 27,800.0000 27,800.00 0.750 20,850.00 0.750 20,850 004 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.100 5,000.00 0.100 5,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,250.0000 25,000.00 3.000 3,750.00 3.000 3,750 006 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 0.1500 3,990.00 15.000 2.25 15.000 2 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.0400 3,552.00 12,556.000 502.24 12,556.000 502 008 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 45.0000 4,050.00 20.000 900.00 20.000 900 SYSTEM 009 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 450.0000 450.00 1.000 450.00 1.000 450 010 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,050.0000 15,150.00 3.000 15,150.00 3.000 15,150 011 JOB SITE MANAGEMENT LS 4,700.0000 4,700.00 0.090 423.00 0.090 423 012 WATER POLLUTION CONTROL PROGRAM LS 11,000.0000 11,000.00 0.090 990.00 0.090 990 013 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 165.0000 1,463,550.00 1,151.600 190,014.00 1,151.600 190,014 014 TACK COAT TON 553.0000 18,249.00 4.320 2,388.96 4.320 2,388 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.2500 569,500.00 16,959.040 72,075.92 16,959.040 72,075 016 PAINT CURB (2-COAT) SQFT 1.0000 10,100.00 0.000 0 017 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 4,050.00 0.000 0 018 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 4.0000 106,400.00 0.000 0 WET NIGHT VISIBILITY) 019 PREFORMED THERMOPLASTIC PAVEMENT MARKING SQFT 9.0000 75,870.00 0.000 0 020 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 656.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 021 PAINT PAVEMENT MARKING (2-COAT) SQFT 2.0000 18,840.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0V5004 TIME 06:10 PM ESTIMATE NO. 001 BID OPENING 02/04/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: KARAM, IMAD DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8800 34,584.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 023 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 2,528.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 024 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 9,284.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 025 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 360.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 026 12" THERMOPLASTIC TRAFFIC STRIPE LF 2.5000 4,475.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 027 REMOVE PAINTED PAVEMENT MARKING SQFT 1.0000 3,590.00 0.000 0 028 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 1.5000 47,700.00 0.000 0 (BROKEN 17-7) 029 INDUCTIVE LOOP DETECTOR (EA) EA 480.0000 105,600.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/21/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0V5004 TIME 06:10 PM ESTIMATE NO. 001 BID OPENING 02/04/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: KARAM, IMAD DATE OF THIS ESTIMATE 10/21/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 325,446.37 325,446.37 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 325,446.37 325,446.37 030 MOBILIZATION LS 57,000.0000 57,000.00 0.750 42,750.00 0.750 42,750 ORIGINAL CONTRACT AMOUNT 2,813,978.00 TOTAL WORK COMPLETED 368,196.37 368,196.37 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 368,196.37 368,196.37 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/20/26 90 09/08/26 04/06/26 02/19/27 8 2 0 0 13% 9% PROGRESS IS SATISFACTORY *** SUSPENDED ON 04/06/26. KARAM, IMAD RESIDENT ENGINEER