PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/18/26 EST. NO. 001 TIME 11:05 AM R.E. NAME: ASHOFTEH,T./CE-NAJM, E. 12-0V7404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/18/26 EST. NO. 001 TIME 11:05 AM R.E. NAME: ASHOFTEH,T./CE-NAJM, E. 12-0V7404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0V7404 TIME 11:05 AM ESTIMATE NO. 001 BID OPENING 05/12/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: ASHOFTEH,T./CE-NAJM, E. DATE OF THIS ESTIMATE 09/18/26 LOCATION PROGRESS ESTIMATE 12-ORA-57-20.9 ----------------- FBD VANGUARD CONSTRUCTION, ORANGE COUNTY IN BREA AT LAMBERT ROAD INC. UNDERCROSSING 550 GREENVILLE ROAD LIVERMORE CA 94550 FED. AID NO. NH-P057(78) CONSTRUCT CONCRETE BARRIERS AND MODIFY RAM ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,200.0000 2,200.00 0.500 1,100.00 0.500 1,100 002 TIME-RELATED OVERHEAD (WDAY) WDAY 500.0000 37,500.00 15.000 7,500.00 15.000 7,500 003 CONSTRUCTION AREA SIGNS LS 22,000.0000 22,000.00 0.700 15,400.00 0.700 15,400 004 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.300 15,000.00 0.300 15,000 005 CHANNELIZER (SURFACE MOUNTED) EA 70.0000 350.00 5.000 350.00 5.000 350 006 TEMPORARY BARRIER SYSTEM LF 20.0000 15,200.00 760.000 15,200.00 760.000 15,200 007 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 1,500.0000 1,500.00 0.300 450.00 0.300 450 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,500.0000 3,500.00 0.700 2,450.00 0.700 2,450 009 TEMPORARY CRASH CUSHION TL-3 EA 3,900.0000 3,900.00 1.000 3,900.00 1.000 3,900 010 TEMPORARY TRAFFIC SCREEN LF 10.0000 7,600.00 0.000 0 011 JOB SITE MANAGEMENT LS 3,000.0000 3,000.00 0.300 900.00 0.300 900 012 WATER POLLUTION CONTROL PROGRAM LS 1,300.0000 1,300.00 0.700 910.00 0.700 910 013 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 2,500.00 10.000 2,500.00 10.000 2,500 014 TREATED WOOD WASTE LB 0.5000 1,225.00 0.000 0 015 CLEARING AND GRUBBING (LS) LS 2,500.0000 2,500.00 1.000 2,500.00 1.000 2,500 016 ROADWAY EXCAVATION CY 50.0000 4,500.00 90.000 4,500.00 90.000 4,500 017 IMPORTED BORROW (CY) CY 60.0000 5,220.00 0.000 0 018 CLASS 2 AGGREGATE BASE (CY) CY 180.0000 5,760.00 32.000 5,760.00 32.000 5,760 019 REMOVE ASPHALT CONCRETE DIKE LF 8.0000 4,880.00 610.000 4,880.00 610.000 4,880 020 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 150.0000 5,700.00 0.000 0 021 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,000.0000 6,000.00 0.000 0 022 SEVERE-DUTY CRASH CUSHION TL-3 EA 55,000.0000 55,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0V7404 TIME 11:05 AM ESTIMATE NO. 001 BID OPENING 05/12/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: ASHOFTEH,T./CE-NAJM, E. DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CONCRETE BARRIER (TYPE 60MS MODIFIED) LF 190.0000 106,400.00 0.000 0 024 CONCRETE BARRIER TRANSITION LF 830.0000 10,790.00 0.000 0 (F) 025 REMOVE GUARDRAIL LF 25.0000 6,250.00 250.000 6,250.00 250.000 6,250 026 REMOVE BARRIER RAILING LF 30.0000 11,700.00 0.000 0 027 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 28.0000 7,000.00 0.000 0 WET NIGHT VISIBILITY) 028 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 46.0000 3,220.00 0.000 0 029 FIBER OPTIC CABLE SYSTEMS LS 10,000.0000 10,000.00 0.300 3,000.00 0.300 3,000 030 MODIFYING RAMP METERING SYSTEMS LS 53,700.0000 53,700.00 0.300 16,110.00 0.300 16,110 PROGRAM CAS145 PAGE 3 DATE 09/18/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0V7404 TIME 11:05 AM ESTIMATE NO. 001 BID OPENING 05/12/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: ASHOFTEH,T./CE-NAJM, E. DATE OF THIS ESTIMATE 09/18/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 108,660.00 108,660.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 108,660.00 108,660.00 031 MOBILIZATION LS 50,000.0000 50,000.00 0.950 47,500.00 0.950 47,500 ORIGINAL CONTRACT AMOUNT 500,395.00 TOTAL WORK COMPLETED 156,160.00 156,160.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 156,160.00 156,160.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/22/26 75 08/24/26 08/06/26 12/14/26 13 14 0 0 31% 17% PROGRESS IS SATISFACTORY *** SUSPENDED ON 08/05/26. ASHOFTEH,T./CE-NAJM, E. RESIDENT ENGINEER